Vai al contenuto principale della pagina

Delay analysis in construction contracts / / P.J. Keane & A.F. Caletka



(Visualizza in formato marc)    (Visualizza in BIBFRAME)

Autore: Keane P. J (P. John) Visualizza persona
Titolo: Delay analysis in construction contracts / / P.J. Keane & A.F. Caletka Visualizza cluster
Pubblicazione: Chichester, West Sussex, United Kingdom ; ; Hoboken, New Jersey : , : John Wiley and Sons, Inc., , 2015
Edizione: Second edition.
Descrizione fisica: 1 online resource (291 p.)
Disciplina: 690.068/5
Soggetto topico: Construction industry - Cost control
Construction industry - Planning
Production scheduling
Construction contracts
Persona (resp. second.): CaletkaA. F (Anthony F.)
Note generali: Description based upon print version of record.
Nota di bibliografia: Includes bibliographical references and index.
Nota di contenuto: Cover; Title Page; Copyright; Contents; About the Authors; Preface to the Second Edition; Preface to the First Edition; Chapter 1 Introduction; 1.1 General; 1.1.1 Purpose of this book; 1.1.2 Guidance; 1.1.3 Construction planning and programming; 1.2 Construction delays; 1.2.1 Identifying delays; 1.2.2 Analysing construction delays; 1.2.3 Delay claim life cycle; 1.3 Burning issues in delay analysis; 1.4 Presentation and case study; Chapter 2 Construction Programmes; 2.1 Introduction; 2.1.1 Planning, programming and project controls; 2.1.2 Elements of a successful project
2.2 Planning and programming2.2.1 Project planning; 2.2.2 Work breakdown structure; 2.3 CPM programming techniques: the fundamentals; 2.3.1 Activity durations; 2.3.2 Activity relationships; 2.3.3 Event date calculations; 2.3.4 Forward pass; 2.3.5 Backward pass; 2.3.6 Total float; 2.3.7 Constraints; 2.4 Baseline validation; 2.4.1 Joint baseline review; 2.4.2 Programme approval; 2.4.3 The project baseline; 2.5 Other planning techniques; 2.5.1 PERT - Project Evaluation and Review Technique; 2.5.2 Gantt charts (bar charts); 2.5.3 Line of balance; 2.5.4 Critical chain method/theory of constraints
2.6 Why use CPM planning or scheduling techniques?2.6.1 Project management; 2.6.2 As-planned programmes; 2.7 Project controls and the project control cycle; 2.7.1 Progress monitoring; 2.7.2 Process and analyse information - Earned Value Method; 2.7.3 The cost and schedule performance curves; 2.7.4 Time control; 2.7.5 Programme updates; 2.8 Records, records, records ...; 2.8.1 Electronic records: management and storage; 2.8.2 Electronic records in practice; 2.8.3 Document controls; 2.9 Predatory programming practices; 2.10 Guidance; Chapter 3 Identification of Construction Delays
3.1 Establishing a basis for identifying delay3.1.1 General requirements; 3.1.2 Validation of an as-planned programme; 3.2 Factual evidence and as-built programmes; 3.2.1 As-built programme preparation; 3.2.2 Summary; 3.3 Identification of delay events; 3.3.1 Delay identification; 3.3.2 Recording delays; 3.4 Identification and analysis of disruption; 3.4.1 Disruption and delay; 3.4.2 Calculating disruption; 3.4.3 Establishing cause; 3.4.4 Total cost claims/global claims; 3.4.5 Measured mile; 3.4.6 Graphical presentation; 3.4.7 Summary; Chapter 4 Analysis of Construction Delays
4.1 Introduction4.1.1 The use of CPM techniques; 4.1.2 Project planning software; 4.1.3 Identifying delays: cause or effect?; 4.2 Selection criteria and guidance; 4.2.1 The SCL Delay and Disruption Protocol; 4.2.2 The core statements of principle; 4.2.3 AACEI Recommended Practice No. 29R-03: Forensic Schedule Analysis; 4.2.4 Which technique to use under given circumstances; 4.3 Summary; Chapter 5 Delay Analysis Techniques; 5.1 Introduction to delay analysis techniques; 5.1.1 Additive methods of delay analysis; 5.1.2 Impacted as-planned; 5.1.3 Time impact analysis; 5.1.4 Collapsed as-built
5.1.5 As-built based methods of analysis
Sommario/riassunto: The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex.This book is a practical guide to the process of delay analysis and includes an in-depth review of the primary methods of delay analysis, together with the assumptions that underlie the precise calculations required in any quantitative delay analysis. T
Titolo autorizzato: Delay analysis in construction contracts  Visualizza cluster
ISBN: 1-118-63113-7
1-118-63110-2
Formato: Materiale a stampa
Livello bibliografico Monografia
Lingua di pubblicazione: Inglese
Record Nr.: 9910140461503321
Lo trovi qui: Univ. Federico II
Opac: Controlla la disponibilità qui