Adjudication in construction disputes / / John Redmond |
Autore | Redmond John, B.A. |
Pubbl/distr/stampa | Oxford ; ; Malden, Mass., : Blackwell Science, 2001 |
Descrizione fisica | 1 online resource (274 pages) |
Disciplina |
343.41/078624
343.41078624 |
Soggetto topico |
Construction contracts - Great Britain
Arbitration and award - Great Britain |
ISBN |
1-281-31848-5
9786611318482 0-470-69051-8 0-470-68023-7 |
Formato | Materiale a stampa ![]() |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
ADJUDICATION in Construction Contracts; Contents; Preface; Chapter 1 Introduction; 1.1 Background to the legislation; 1.2 Adjudication in standard contracts before the Act; 1.3 What is adjudication?; 1.4 Appeal and review; 1.5 Who are the adjudicators?; 1.6 The future; Chapter 2 Construction Contracts and Construction Operations; 2.1 Definition of 'construction operations'; 2.2 Exclusions from the definition of 'construction operations'; 2.3 Definition of 'construction contract'; 2.4 Exclusions from the definition of 'construction contracts'; 2.5 The mixed contract
2.6 Limits of date and place; 2.7 Residential occupiers; 2.8 Contracts in writing; Chapter 3 The Statutory Right to Refer Disputes to Adjudication; 3.1 Definition of dispute; 3.2 Required contractual provisions; 3.3 The incorporation of institutional rules and other terms; 3.4 The adjudication provisions of the Scheme for Construction Contracts; Chapter 4 Starting Adjudication; 4.1 Timing; 4.2 The notice of adjudication; 4.3 Service of the notice of adjudication; 4.4 Identification or selection of the adjudicator; 4.5 Request to an adjudicator nominating body 4.6 Terms of agreement with the adjudicator; 4.7 Procedure if the appointment system fails; 4.8 Objections to specific adjudicator; 4.9 Revocation of appointment and resignation of the adjudicator; Chapter 5 Preliminary Matters - the Referral Notice and Jurisdiction; 5.1 Time for delivery of the referral notice; 5.2 Form and contents of the referral notice; 5.3 Related and unrelated disputes; 5.4 Questions of jurisdiction; Chapter 6 Conduct of the Adjudication; 6.1 Overriding duties of the adjudicator; 6.2 The exercise of initiative by the adjudicator; 6.3 Failure to comply 6.4 Representation of the parties; 6.5 Confidentiality; 6.6 Timetable for decision; 6.7 Standard forms of appointment; Chapter 7 The Adjudicator's Decision; 7.1 The duty to decide; 7.2 The matters in dispute; 7.3 Power to open up certificates etc.; 7.4 Decision on payments; 7.5 Interest; 7.6 Form and content of the decision; 7.7 Binding nature of the decision; 7.8 Mistakes; 7.9 Adjudicator's immunity; Chapter 8 Costs; 8.1 Adjudicator's right to fees and the power to apportion; 8.2 Right to require security for his fees; 8.3 Power to order payment of costs; Chapter 9 Enforcement 9.1 The Act and the Scheme; 9.2 Application for summary judgment; 9.3 Other enforcement procedures; 9.4 Challenges to enforcement; Chapter 10 Payment; 10.1 Introduction; 10.2 The right to stage payments; 10.3 Timing and quantification of payments; 10.4 Notice of amount to be paid; 10.5 Notice of intention to withhold payment; 10.6 Right to suspend; 10.7 Conditional payment provisions; 10.8 The Scheme; Appendix 1 Housing Grants, Construction and Regeneration Act 1996; Appendix 2 The Scheme for Construction Contracts (England and Wales) Regulations 1998; Table of Cases; References to Housing Grants, Construction and Regeneration Act 1996 |
Record Nr. | UNINA-9910145552303321 |
Redmond John, B.A.
![]() |
||
Oxford ; ; Malden, Mass., : Blackwell Science, 2001 | ||
![]() | ||
Lo trovi qui: Univ. Federico II | ||
|
Adjudication in construction disputes / / John Redmond |
Autore | Redmond John, B.A. |
Edizione | [1st ed.] |
Pubbl/distr/stampa | Oxford ; ; Malden, Mass., : Blackwell Science, 2001 |
Descrizione fisica | 1 online resource (274 pages) |
Disciplina |
343.41/078624
343.41078624 |
Soggetto topico |
Construction contracts - Great Britain
Arbitration and award - Great Britain |
ISBN |
1-281-31848-5
9786611318482 0-470-69051-8 0-470-68023-7 |
Formato | Materiale a stampa ![]() |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
ADJUDICATION in Construction Contracts; Contents; Preface; Chapter 1 Introduction; 1.1 Background to the legislation; 1.2 Adjudication in standard contracts before the Act; 1.3 What is adjudication?; 1.4 Appeal and review; 1.5 Who are the adjudicators?; 1.6 The future; Chapter 2 Construction Contracts and Construction Operations; 2.1 Definition of 'construction operations'; 2.2 Exclusions from the definition of 'construction operations'; 2.3 Definition of 'construction contract'; 2.4 Exclusions from the definition of 'construction contracts'; 2.5 The mixed contract
2.6 Limits of date and place; 2.7 Residential occupiers; 2.8 Contracts in writing; Chapter 3 The Statutory Right to Refer Disputes to Adjudication; 3.1 Definition of dispute; 3.2 Required contractual provisions; 3.3 The incorporation of institutional rules and other terms; 3.4 The adjudication provisions of the Scheme for Construction Contracts; Chapter 4 Starting Adjudication; 4.1 Timing; 4.2 The notice of adjudication; 4.3 Service of the notice of adjudication; 4.4 Identification or selection of the adjudicator; 4.5 Request to an adjudicator nominating body 4.6 Terms of agreement with the adjudicator; 4.7 Procedure if the appointment system fails; 4.8 Objections to specific adjudicator; 4.9 Revocation of appointment and resignation of the adjudicator; Chapter 5 Preliminary Matters - the Referral Notice and Jurisdiction; 5.1 Time for delivery of the referral notice; 5.2 Form and contents of the referral notice; 5.3 Related and unrelated disputes; 5.4 Questions of jurisdiction; Chapter 6 Conduct of the Adjudication; 6.1 Overriding duties of the adjudicator; 6.2 The exercise of initiative by the adjudicator; 6.3 Failure to comply 6.4 Representation of the parties; 6.5 Confidentiality; 6.6 Timetable for decision; 6.7 Standard forms of appointment; Chapter 7 The Adjudicator's Decision; 7.1 The duty to decide; 7.2 The matters in dispute; 7.3 Power to open up certificates etc.; 7.4 Decision on payments; 7.5 Interest; 7.6 Form and content of the decision; 7.7 Binding nature of the decision; 7.8 Mistakes; 7.9 Adjudicator's immunity; Chapter 8 Costs; 8.1 Adjudicator's right to fees and the power to apportion; 8.2 Right to require security for his fees; 8.3 Power to order payment of costs; Chapter 9 Enforcement 9.1 The Act and the Scheme; 9.2 Application for summary judgment; 9.3 Other enforcement procedures; 9.4 Challenges to enforcement; Chapter 10 Payment; 10.1 Introduction; 10.2 The right to stage payments; 10.3 Timing and quantification of payments; 10.4 Notice of amount to be paid; 10.5 Notice of intention to withhold payment; 10.6 Right to suspend; 10.7 Conditional payment provisions; 10.8 The Scheme; Appendix 1 Housing Grants, Construction and Regeneration Act 1996; Appendix 2 The Scheme for Construction Contracts (England and Wales) Regulations 1998; Table of Cases; References to Housing Grants, Construction and Regeneration Act 1996 |
Record Nr. | UNINA-9910824883703321 |
Redmond John, B.A.
![]() |
||
Oxford ; ; Malden, Mass., : Blackwell Science, 2001 | ||
![]() | ||
Lo trovi qui: Univ. Federico II | ||
|
Adjudication in construction disputes / / John Redmond |
Autore | Redmond John, B.A. |
Edizione | [1st ed.] |
Pubbl/distr/stampa | Oxford ; ; Malden, Mass., : Blackwell Science, 2001 |
Descrizione fisica | 1 online resource (274 pages) |
Disciplina |
343.41/078624
343.41078624 |
Soggetto topico |
Construction contracts - Great Britain
Arbitration and award - Great Britain |
ISBN |
1-281-31848-5
9786611318482 0-470-69051-8 0-470-68023-7 |
Formato | Materiale a stampa ![]() |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
ADJUDICATION in Construction Contracts; Contents; Preface; Chapter 1 Introduction; 1.1 Background to the legislation; 1.2 Adjudication in standard contracts before the Act; 1.3 What is adjudication?; 1.4 Appeal and review; 1.5 Who are the adjudicators?; 1.6 The future; Chapter 2 Construction Contracts and Construction Operations; 2.1 Definition of 'construction operations'; 2.2 Exclusions from the definition of 'construction operations'; 2.3 Definition of 'construction contract'; 2.4 Exclusions from the definition of 'construction contracts'; 2.5 The mixed contract
2.6 Limits of date and place; 2.7 Residential occupiers; 2.8 Contracts in writing; Chapter 3 The Statutory Right to Refer Disputes to Adjudication; 3.1 Definition of dispute; 3.2 Required contractual provisions; 3.3 The incorporation of institutional rules and other terms; 3.4 The adjudication provisions of the Scheme for Construction Contracts; Chapter 4 Starting Adjudication; 4.1 Timing; 4.2 The notice of adjudication; 4.3 Service of the notice of adjudication; 4.4 Identification or selection of the adjudicator; 4.5 Request to an adjudicator nominating body 4.6 Terms of agreement with the adjudicator; 4.7 Procedure if the appointment system fails; 4.8 Objections to specific adjudicator; 4.9 Revocation of appointment and resignation of the adjudicator; Chapter 5 Preliminary Matters - the Referral Notice and Jurisdiction; 5.1 Time for delivery of the referral notice; 5.2 Form and contents of the referral notice; 5.3 Related and unrelated disputes; 5.4 Questions of jurisdiction; Chapter 6 Conduct of the Adjudication; 6.1 Overriding duties of the adjudicator; 6.2 The exercise of initiative by the adjudicator; 6.3 Failure to comply 6.4 Representation of the parties; 6.5 Confidentiality; 6.6 Timetable for decision; 6.7 Standard forms of appointment; Chapter 7 The Adjudicator's Decision; 7.1 The duty to decide; 7.2 The matters in dispute; 7.3 Power to open up certificates etc.; 7.4 Decision on payments; 7.5 Interest; 7.6 Form and content of the decision; 7.7 Binding nature of the decision; 7.8 Mistakes; 7.9 Adjudicator's immunity; Chapter 8 Costs; 8.1 Adjudicator's right to fees and the power to apportion; 8.2 Right to require security for his fees; 8.3 Power to order payment of costs; Chapter 9 Enforcement 9.1 The Act and the Scheme; 9.2 Application for summary judgment; 9.3 Other enforcement procedures; 9.4 Challenges to enforcement; Chapter 10 Payment; 10.1 Introduction; 10.2 The right to stage payments; 10.3 Timing and quantification of payments; 10.4 Notice of amount to be paid; 10.5 Notice of intention to withhold payment; 10.6 Right to suspend; 10.7 Conditional payment provisions; 10.8 The Scheme; Appendix 1 Housing Grants, Construction and Regeneration Act 1996; Appendix 2 The Scheme for Construction Contracts (England and Wales) Regulations 1998; Table of Cases; References to Housing Grants, Construction and Regeneration Act 1996 |
Record Nr. | UNISA-996205985303316 |
Redmond John, B.A.
![]() |
||
Oxford ; ; Malden, Mass., : Blackwell Science, 2001 | ||
![]() | ||
Lo trovi qui: Univ. di Salerno | ||
|
The Aqua Group guide to procurement, tendering and contract administration / / edited by Mark Hackett, Gary Statham ; with contributions from Michael Bowsher [and nine others] |
Edizione | [Second edition.] |
Pubbl/distr/stampa | Chichester, England : , : Wiley Blackwell, , 2016 |
Descrizione fisica | 1 online resource [xv, 368 pages]. : illustrations |
Disciplina | 692 |
Soggetto topico |
Buildings
Construction contracts - Great Britain Letting of contracts - Great Britain Construction industry - Management |
Soggetto genere / forma | Electronic books. |
ISBN |
1-118-34661-0
1-118-34662-9 9781118346624 1-60119-927-9 |
Formato | Materiale a stampa ![]() |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto | Title Page; Copyright; Table of Contents; Part I: Briefing the Project Team; Chapter 1: The Project Team; Introduction; Parties to a building contract and their supporting teams; Rights, duties and responsibilities; Statutory requirements; Avoiding disputes; Communications; Chapter 2: Assessing the Needs; The structure; The strategic definition; Contribution to the initial project brief; The initial programme; The appointment; Chapter 3: Buildings as Assets; Buildings as assets as well as buildings; Single building or programme?; Buildings as solutions to business challenges? Everyday solutions-based thinking Summary; Part II: Available Procurement Methods; Chapter 4: Principles of Procurement; Simple theory - complex practice; The eternal triangle; Other considerations; Entering into the contract; The dynamics of tendering; Chapter 5: Basic Concepts; Economic use of resources; Contractor's contribution to design and contract programme; Production cost savings; Continuity; Risk and accountability; Summary; Chapter 6: Accountability; Background; The modern concept of public accountability; Contract documentation; Proper price; Dispensing with competition; Inflation Value for money Summary; Chapter 7: Value and Risk Management; Value management; Risk management; Risk management strategies; Allocating management actions; Value and risk are complementary; Chapter 8: Fixed Price and Cost Reimbursement; Fixed price; Cost reimbursement; Application to contract elements; Fluctuations; Target cost contracts; Use; Programme; Summary; Chapter 9: Fixed Price Contracts; JCT fixed price contracts; Advantages and disadvantages of fixed price contracts; Chapter 10: Cost Reimbursement Contracts; The fee; The prime cost building contract Advantages and disadvantages of cost reimbursement contracts Budget and cost control; Administering the contract; Procedure for keeping prime costs; Sub-letting; Defective work; Cost control; Final account; Chapter 11: Target Cost Contracts; Guaranteed maximum price contracts; Competition; Contract; Advantages and disadvantages; Use; Chapter 12: Management and Construction Management Contracts; Payment and cost control; Selection and appointment of the contractor; Contract conditions; Contract administration; Professional advisers; Advantages and disadvantages; Construction management; Use Programme; Chapter 13: Design and Build Contracts; The contract; Where to use DB (and when not to do so); Managing the design process; Novation; Evaluation of submissions; Post-contract administration; Financial administration; Programme; Advantages and disadvantages; Chapter 14: Continuity Contracts; Serial contracting; Continuation contracts; Term contracts; Chapter 15: Partnering; A definition; When to adopt a partnering approach; The agreement; JCT Partnering Charter; JCT Framework Agreement; JCT constructing excellence; The partnering workshop; The benefits; The risks; Future of partnering; Chapter 16: EU Procurement |
Record Nr. | UNINA-9910154673803321 |
Chichester, England : , : Wiley Blackwell, , 2016 | ||
![]() | ||
Lo trovi qui: Univ. Federico II | ||
|
Arbitration practice in construction contracts [[electronic resource] /] / Douglas A. Stephenson ; foreword by the Lord Saville of Newdigate |
Autore | Stephenson Douglas A |
Edizione | [5th ed.] |
Pubbl/distr/stampa | Oxford [England] ; ; Malden, Mass., : Blackwell Science, 2001 |
Descrizione fisica | 1 online resource (298 p.) |
Disciplina |
343.41078624
343.73078624 |
Soggetto topico |
Construction contracts - Great Britain
Civil engineering contracts - Great Britain Arbitration and award - Great Britain |
Soggetto genere / forma | Electronic books. |
ISBN |
1-282-34246-0
9786612342462 0-470-69890-X 0-470-69836-5 |
Formato | Materiale a stampa ![]() |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Arbitration Practice in Construction Contracts; Contents; Foreword; Preface to the fifth edition; 1 Introduction; 1.1 Synopsis; 1.2 Definition; 1.3 Legal framework; 1.4 English law of arbitration; 1.5 Advantages of arbitration; 1.6 Disadvantages of arbitration; 2 Arbitration Agreements; 2.1 Synopsis; 2.2 Definition; 2.3 Separability; 2.4 Agreements to refer; 2.5 Ad hoc agreements; 2.6 Stay of court proceedings; 2.7 Procedural matters; 2.8 Arbitration agreements in standard forms of contract; 3 Appointment of the Arbitrator; 3.1 Synopsis; 3.2 Constitution of the tribunal
3.3 Appointment procedure3.4 Qualifications of the arbitrator; 3.5 Terms of the arbitrator's appointment; 3.6 Supplying vacancies; 4 Jurisdiction of the Arbitrator; 4.1 Synopsis; 4.2 Power of arbitrator to rule on own jurisdiction; 4.3 Revocation of arbitrator's authority; 4.4 Power of court to remove the arbitrator; 4.5 Resignation of the arbitrator; 4.6 Death of the arbitrator or of the appointing authority; 4.7 Power to conduct the proceedings; 5 The Preliminaries; 5.1 Synopsis; 5.2 English law; 5.3 The preliminary meeting; 5.4 Procedural directions; 5.5 Statements of case 5.6 Amendments to statements of case5.7 Further and better particulars; 5.8 The Scott schedule; 5.9 Disclosure of documents; 5.10 Privilege; 5.11 Transcript of the hearing; 5.12 Arrangements for the hearing; 5.13 Conduct of the interlocutory stages; 5.14 Preliminary questions of law; 5.15 Small claims; 6 Evidence; 6.1 Synopsis; 6.2 Statutes; 6.3 Kinds of evidence; 6.4 Admissibility; 6.5 Privilege; 6.6 Proofs of evidence; 6.7 Calling witnesses; 6.8 Burden and standard of proof; 7 The Hearing; 7.1 Synopsis; 7.2 Attendance; 7.3 Courtesy; 7.4 Challenges to arbitrator's jurisdiction 7.5 Representation7.6 Procedure; 8 TheAward; 8.1 Synopsis; 8.2 Procedure; 8.3 Types of award; 8.4 Format of the award; 8.5 Notification of the award; 8.6 Correction of accidental errors; 8.7 Additional awards; 9 costs; 9.1 Synopsis; 9.2 Statutory provisions; 9.3 Basis of award of costs; 9.4 Offers to settle; 9.5 Failure to award costs; 9.6 Determination of recoverable costs; 9.7 Arbitrator's fees and expenses; 9.8 Interest on costs; 10 Powers of the Court in Relation to the Award; 10.1 Synopsis; 10.2 Enforcement; 10.3 Challenges to the award; 11 Dispute Avoidance and Management; 11.1 Synopsis 11.2 Contract documents11.3 Basic contract law; 11.4 The construction period: records; 11.5 Claims; 11.6 Adjudication; 11.7 Disputes; 11.8 Appointment of the arbitrator; 11.9 Choice of advocate; 11.10 Offers to settle; Appendices; A Specimen documents:; SD/1 Ad hoc arbitration agreement; SD/2 Application for stay of court proceedings; SD/3 Exclusion agreement; SD/4 Notice to refer and notice to concur; SD/5 Application to President to appoint an arbitrator; SD/6 Notice of appointment; SD/7 Terms of appointment; SD/8 Agenda for preliminary meeting; SD/9 Procedural directions SD/10 Statement of claim |
Record Nr. | UNINA-9910144524103321 |
Stephenson Douglas A
![]() |
||
Oxford [England] ; ; Malden, Mass., : Blackwell Science, 2001 | ||
![]() | ||
Lo trovi qui: Univ. Federico II | ||
|
Arbitration practice in construction contracts [[electronic resource] /] / Douglas A. Stephenson ; foreword by the Lord Saville of Newdigate |
Autore | Stephenson Douglas A |
Edizione | [5th ed.] |
Pubbl/distr/stampa | Oxford [England] ; ; Malden, Mass., : Blackwell Science, 2001 |
Descrizione fisica | 1 online resource (298 p.) |
Disciplina |
343.41078624
343.73078624 |
Soggetto topico |
Construction contracts - Great Britain
Civil engineering contracts - Great Britain Arbitration and award - Great Britain |
ISBN |
1-282-34246-0
9786612342462 0-470-69890-X 0-470-69836-5 |
Formato | Materiale a stampa ![]() |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Arbitration Practice in Construction Contracts; Contents; Foreword; Preface to the fifth edition; 1 Introduction; 1.1 Synopsis; 1.2 Definition; 1.3 Legal framework; 1.4 English law of arbitration; 1.5 Advantages of arbitration; 1.6 Disadvantages of arbitration; 2 Arbitration Agreements; 2.1 Synopsis; 2.2 Definition; 2.3 Separability; 2.4 Agreements to refer; 2.5 Ad hoc agreements; 2.6 Stay of court proceedings; 2.7 Procedural matters; 2.8 Arbitration agreements in standard forms of contract; 3 Appointment of the Arbitrator; 3.1 Synopsis; 3.2 Constitution of the tribunal
3.3 Appointment procedure3.4 Qualifications of the arbitrator; 3.5 Terms of the arbitrator's appointment; 3.6 Supplying vacancies; 4 Jurisdiction of the Arbitrator; 4.1 Synopsis; 4.2 Power of arbitrator to rule on own jurisdiction; 4.3 Revocation of arbitrator's authority; 4.4 Power of court to remove the arbitrator; 4.5 Resignation of the arbitrator; 4.6 Death of the arbitrator or of the appointing authority; 4.7 Power to conduct the proceedings; 5 The Preliminaries; 5.1 Synopsis; 5.2 English law; 5.3 The preliminary meeting; 5.4 Procedural directions; 5.5 Statements of case 5.6 Amendments to statements of case5.7 Further and better particulars; 5.8 The Scott schedule; 5.9 Disclosure of documents; 5.10 Privilege; 5.11 Transcript of the hearing; 5.12 Arrangements for the hearing; 5.13 Conduct of the interlocutory stages; 5.14 Preliminary questions of law; 5.15 Small claims; 6 Evidence; 6.1 Synopsis; 6.2 Statutes; 6.3 Kinds of evidence; 6.4 Admissibility; 6.5 Privilege; 6.6 Proofs of evidence; 6.7 Calling witnesses; 6.8 Burden and standard of proof; 7 The Hearing; 7.1 Synopsis; 7.2 Attendance; 7.3 Courtesy; 7.4 Challenges to arbitrator's jurisdiction 7.5 Representation7.6 Procedure; 8 TheAward; 8.1 Synopsis; 8.2 Procedure; 8.3 Types of award; 8.4 Format of the award; 8.5 Notification of the award; 8.6 Correction of accidental errors; 8.7 Additional awards; 9 costs; 9.1 Synopsis; 9.2 Statutory provisions; 9.3 Basis of award of costs; 9.4 Offers to settle; 9.5 Failure to award costs; 9.6 Determination of recoverable costs; 9.7 Arbitrator's fees and expenses; 9.8 Interest on costs; 10 Powers of the Court in Relation to the Award; 10.1 Synopsis; 10.2 Enforcement; 10.3 Challenges to the award; 11 Dispute Avoidance and Management; 11.1 Synopsis 11.2 Contract documents11.3 Basic contract law; 11.4 The construction period: records; 11.5 Claims; 11.6 Adjudication; 11.7 Disputes; 11.8 Appointment of the arbitrator; 11.9 Choice of advocate; 11.10 Offers to settle; Appendices; A Specimen documents:; SD/1 Ad hoc arbitration agreement; SD/2 Application for stay of court proceedings; SD/3 Exclusion agreement; SD/4 Notice to refer and notice to concur; SD/5 Application to President to appoint an arbitrator; SD/6 Notice of appointment; SD/7 Terms of appointment; SD/8 Agenda for preliminary meeting; SD/9 Procedural directions SD/10 Statement of claim |
Record Nr. | UNISA-996212477103316 |
Stephenson Douglas A
![]() |
||
Oxford [England] ; ; Malden, Mass., : Blackwell Science, 2001 | ||
![]() | ||
Lo trovi qui: Univ. di Salerno | ||
|
Arbitration practice in construction contracts [[electronic resource] /] / Douglas A. Stephenson ; foreword by the Lord Saville of Newdigate |
Autore | Stephenson Douglas A |
Edizione | [5th ed.] |
Pubbl/distr/stampa | Oxford [England] ; ; Malden, Mass., : Blackwell Science, 2001 |
Descrizione fisica | 1 online resource (298 p.) |
Disciplina |
343.41078624
343.73078624 |
Soggetto topico |
Construction contracts - Great Britain
Civil engineering contracts - Great Britain Arbitration and award - Great Britain |
ISBN |
1-282-34246-0
9786612342462 0-470-69890-X 0-470-69836-5 |
Formato | Materiale a stampa ![]() |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Arbitration Practice in Construction Contracts; Contents; Foreword; Preface to the fifth edition; 1 Introduction; 1.1 Synopsis; 1.2 Definition; 1.3 Legal framework; 1.4 English law of arbitration; 1.5 Advantages of arbitration; 1.6 Disadvantages of arbitration; 2 Arbitration Agreements; 2.1 Synopsis; 2.2 Definition; 2.3 Separability; 2.4 Agreements to refer; 2.5 Ad hoc agreements; 2.6 Stay of court proceedings; 2.7 Procedural matters; 2.8 Arbitration agreements in standard forms of contract; 3 Appointment of the Arbitrator; 3.1 Synopsis; 3.2 Constitution of the tribunal
3.3 Appointment procedure3.4 Qualifications of the arbitrator; 3.5 Terms of the arbitrator's appointment; 3.6 Supplying vacancies; 4 Jurisdiction of the Arbitrator; 4.1 Synopsis; 4.2 Power of arbitrator to rule on own jurisdiction; 4.3 Revocation of arbitrator's authority; 4.4 Power of court to remove the arbitrator; 4.5 Resignation of the arbitrator; 4.6 Death of the arbitrator or of the appointing authority; 4.7 Power to conduct the proceedings; 5 The Preliminaries; 5.1 Synopsis; 5.2 English law; 5.3 The preliminary meeting; 5.4 Procedural directions; 5.5 Statements of case 5.6 Amendments to statements of case5.7 Further and better particulars; 5.8 The Scott schedule; 5.9 Disclosure of documents; 5.10 Privilege; 5.11 Transcript of the hearing; 5.12 Arrangements for the hearing; 5.13 Conduct of the interlocutory stages; 5.14 Preliminary questions of law; 5.15 Small claims; 6 Evidence; 6.1 Synopsis; 6.2 Statutes; 6.3 Kinds of evidence; 6.4 Admissibility; 6.5 Privilege; 6.6 Proofs of evidence; 6.7 Calling witnesses; 6.8 Burden and standard of proof; 7 The Hearing; 7.1 Synopsis; 7.2 Attendance; 7.3 Courtesy; 7.4 Challenges to arbitrator's jurisdiction 7.5 Representation7.6 Procedure; 8 TheAward; 8.1 Synopsis; 8.2 Procedure; 8.3 Types of award; 8.4 Format of the award; 8.5 Notification of the award; 8.6 Correction of accidental errors; 8.7 Additional awards; 9 costs; 9.1 Synopsis; 9.2 Statutory provisions; 9.3 Basis of award of costs; 9.4 Offers to settle; 9.5 Failure to award costs; 9.6 Determination of recoverable costs; 9.7 Arbitrator's fees and expenses; 9.8 Interest on costs; 10 Powers of the Court in Relation to the Award; 10.1 Synopsis; 10.2 Enforcement; 10.3 Challenges to the award; 11 Dispute Avoidance and Management; 11.1 Synopsis 11.2 Contract documents11.3 Basic contract law; 11.4 The construction period: records; 11.5 Claims; 11.6 Adjudication; 11.7 Disputes; 11.8 Appointment of the arbitrator; 11.9 Choice of advocate; 11.10 Offers to settle; Appendices; A Specimen documents:; SD/1 Ad hoc arbitration agreement; SD/2 Application for stay of court proceedings; SD/3 Exclusion agreement; SD/4 Notice to refer and notice to concur; SD/5 Application to President to appoint an arbitrator; SD/6 Notice of appointment; SD/7 Terms of appointment; SD/8 Agenda for preliminary meeting; SD/9 Procedural directions SD/10 Statement of claim |
Record Nr. | UNINA-9910830821503321 |
Stephenson Douglas A
![]() |
||
Oxford [England] ; ; Malden, Mass., : Blackwell Science, 2001 | ||
![]() | ||
Lo trovi qui: Univ. Federico II | ||
|
Arbitration practice in construction contracts [[electronic resource] /] / Douglas A. Stephenson ; foreword by the Lord Saville of Newdigate |
Autore | Stephenson Douglas A |
Edizione | [5th ed.] |
Pubbl/distr/stampa | Oxford [England] ; ; Malden, Mass., : Blackwell Science, 2001 |
Descrizione fisica | 1 online resource (298 p.) |
Disciplina |
343.41078624
343.73078624 |
Soggetto topico |
Construction contracts - Great Britain
Civil engineering contracts - Great Britain Arbitration and award - Great Britain |
ISBN |
1-282-34246-0
9786612342462 0-470-69890-X 0-470-69836-5 |
Formato | Materiale a stampa ![]() |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Arbitration Practice in Construction Contracts; Contents; Foreword; Preface to the fifth edition; 1 Introduction; 1.1 Synopsis; 1.2 Definition; 1.3 Legal framework; 1.4 English law of arbitration; 1.5 Advantages of arbitration; 1.6 Disadvantages of arbitration; 2 Arbitration Agreements; 2.1 Synopsis; 2.2 Definition; 2.3 Separability; 2.4 Agreements to refer; 2.5 Ad hoc agreements; 2.6 Stay of court proceedings; 2.7 Procedural matters; 2.8 Arbitration agreements in standard forms of contract; 3 Appointment of the Arbitrator; 3.1 Synopsis; 3.2 Constitution of the tribunal
3.3 Appointment procedure3.4 Qualifications of the arbitrator; 3.5 Terms of the arbitrator's appointment; 3.6 Supplying vacancies; 4 Jurisdiction of the Arbitrator; 4.1 Synopsis; 4.2 Power of arbitrator to rule on own jurisdiction; 4.3 Revocation of arbitrator's authority; 4.4 Power of court to remove the arbitrator; 4.5 Resignation of the arbitrator; 4.6 Death of the arbitrator or of the appointing authority; 4.7 Power to conduct the proceedings; 5 The Preliminaries; 5.1 Synopsis; 5.2 English law; 5.3 The preliminary meeting; 5.4 Procedural directions; 5.5 Statements of case 5.6 Amendments to statements of case5.7 Further and better particulars; 5.8 The Scott schedule; 5.9 Disclosure of documents; 5.10 Privilege; 5.11 Transcript of the hearing; 5.12 Arrangements for the hearing; 5.13 Conduct of the interlocutory stages; 5.14 Preliminary questions of law; 5.15 Small claims; 6 Evidence; 6.1 Synopsis; 6.2 Statutes; 6.3 Kinds of evidence; 6.4 Admissibility; 6.5 Privilege; 6.6 Proofs of evidence; 6.7 Calling witnesses; 6.8 Burden and standard of proof; 7 The Hearing; 7.1 Synopsis; 7.2 Attendance; 7.3 Courtesy; 7.4 Challenges to arbitrator's jurisdiction 7.5 Representation7.6 Procedure; 8 TheAward; 8.1 Synopsis; 8.2 Procedure; 8.3 Types of award; 8.4 Format of the award; 8.5 Notification of the award; 8.6 Correction of accidental errors; 8.7 Additional awards; 9 costs; 9.1 Synopsis; 9.2 Statutory provisions; 9.3 Basis of award of costs; 9.4 Offers to settle; 9.5 Failure to award costs; 9.6 Determination of recoverable costs; 9.7 Arbitrator's fees and expenses; 9.8 Interest on costs; 10 Powers of the Court in Relation to the Award; 10.1 Synopsis; 10.2 Enforcement; 10.3 Challenges to the award; 11 Dispute Avoidance and Management; 11.1 Synopsis 11.2 Contract documents11.3 Basic contract law; 11.4 The construction period: records; 11.5 Claims; 11.6 Adjudication; 11.7 Disputes; 11.8 Appointment of the arbitrator; 11.9 Choice of advocate; 11.10 Offers to settle; Appendices; A Specimen documents:; SD/1 Ad hoc arbitration agreement; SD/2 Application for stay of court proceedings; SD/3 Exclusion agreement; SD/4 Notice to refer and notice to concur; SD/5 Application to President to appoint an arbitrator; SD/6 Notice of appointment; SD/7 Terms of appointment; SD/8 Agenda for preliminary meeting; SD/9 Procedural directions SD/10 Statement of claim |
Record Nr. | UNINA-9910841314403321 |
Stephenson Douglas A
![]() |
||
Oxford [England] ; ; Malden, Mass., : Blackwell Science, 2001 | ||
![]() | ||
Lo trovi qui: Univ. Federico II | ||
|
Building contract claims / / David Chappell |
Autore | Chappell David |
Edizione | [5th ed.] |
Pubbl/distr/stampa | Chichester, West Sussex, England : , : Wiley-Blackwell, , 2011 |
Descrizione fisica | xii, 532 p |
Disciplina | 343.41/078624 |
Soggetto topico |
Construction contracts - Great Britain
Breach of contract - Great Britain Actions and defenses - Great Britain |
Soggetto genere / forma | Electronic books. |
ISBN |
1-119-95197-6
9786613204387 1-119-95194-1 1-283-20438-X 1-119-95195-X |
Formato | Materiale a stampa ![]() |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto | Introduction -- Time -- Liquidated damages -- Basis for common law claims -- Direct loss and/or expense -- Points of principle -- Potential heads of claim -- Causation -- Global claims -- Preparation and substantiation of claims -- Extension of time under JCT standard form contracts -- Liquidated damages under JCT standard form contracts -- Loss and/or expense under JCT standard form contracts -- Variations -- Claims under GC/Works/1 -- Claims under ACA 3 -- Claims under PPC2000 -- Claims under NEC 3 -- Sub-contract claims. |
Record Nr. | UNINA-9910208841403321 |
Chappell David
![]() |
||
Chichester, West Sussex, England : , : Wiley-Blackwell, , 2011 | ||
![]() | ||
Lo trovi qui: Univ. Federico II | ||
|
Building contract claims / / David Chappell |
Autore | Chappell David |
Edizione | [5th ed.] |
Pubbl/distr/stampa | Chichester, West Sussex, England : , : Wiley-Blackwell, , 2011 |
Descrizione fisica | xii, 532 p |
Disciplina | 343.41/078624 |
Soggetto topico |
Construction contracts - Great Britain
Breach of contract - Great Britain Actions and defenses - Great Britain |
ISBN |
1-119-95197-6
9786613204387 1-119-95194-1 1-283-20438-X 1-119-95195-X |
Formato | Materiale a stampa ![]() |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto | Introduction -- Time -- Liquidated damages -- Basis for common law claims -- Direct loss and/or expense -- Points of principle -- Potential heads of claim -- Causation -- Global claims -- Preparation and substantiation of claims -- Extension of time under JCT standard form contracts -- Liquidated damages under JCT standard form contracts -- Loss and/or expense under JCT standard form contracts -- Variations -- Claims under GC/Works/1 -- Claims under ACA 3 -- Claims under PPC2000 -- Claims under NEC 3 -- Sub-contract claims. |
Record Nr. | UNINA-9910677564103321 |
Chappell David
![]() |
||
Chichester, West Sussex, England : , : Wiley-Blackwell, , 2011 | ||
![]() | ||
Lo trovi qui: Univ. Federico II | ||
|