Contract documentation for contractors [[electronic resource] /] / Vincent Powell-Smith, John Sims, and Christopher Dancaster
| Contract documentation for contractors [[electronic resource] /] / Vincent Powell-Smith, John Sims, and Christopher Dancaster |
| Autore | Powell-Smith Vincent |
| Edizione | [3rd ed.] |
| Pubbl/distr/stampa | Malden, Mass., : Blackwell Science, 2000 |
| Descrizione fisica | 1 online resource (330 p.) |
| Disciplina |
346.4102/2
692.80941 |
| Altri autori (Persone) |
SimsJohn <1929->
DancasterChristopher |
| Soggetto topico |
Contracts for work and labor - Great Britain
Contractors - Legal status, laws, etc - Great Britain |
| Soggetto genere / forma | Electronic books. |
| ISBN |
1-282-35981-9
9786612359811 0-470-69606-0 0-470-69531-5 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
Contract Documentation for Contractors; Contents; Acknowledgements; Preface to the First Edition; Preface to the Third Edition; 1 Introduction; 1.01 General; 1.02 Letters and notices; 1.03 Tabular summary of mandatory requirements; 2 Pre-contract Documentation; 2.01 Introduction; 2.02 Qualification; 2.03 Preliminary enquiry; 2.04 Formal invitation to tender; 2.05 Errors in tender documents; 2.06 Time for tendering; 2.07 Onerous conditions in tender documents; 2.08 Submission of tender; 2.09 Subcontractorsand suppliers; 2.10 Letters of intent; 2.11 Signing the contract; 2.12 Performance bonds
2.13 Advance payment bonds and bonds in respect of payment for off-site materials and/or goods3 Commencement and Progress; 3.01 Pre-commencement meeting; 3.02 Site and progress meetings; 3.03 Site diaries; 3.04 The master programme; 3.05 Discrepancies in documents; 3.06 Compliance with statutory requirements; 3.07 Problems with materials; 3.08 Information necessary for the works; 3.09 Instructions generally; 3.10 Variations; 3.11 Work done by others; 3.12 Other matters; 4 Certificates and Payments; 4.01 Introduction; 4.02 Application for payment; 4.03 Late payment; 4.04 The withholding notice 4.05 Wrongful deductions from the certificate by the employer4.06 Right of suspension of obligations by contractor; 4.07 Problems with interim certificates; 4.08 Off-site goods and materials; 4.09 Retention; 4.10 The Construction Industry Scheme; 5 Delays and Disruptions; 5.01 General; 5.02 Possession of the site and commencement of work; 5.03 Delay in general; 5.04 Detailed procedures under JCT 98 or WCD 98; 5.05 The grant of the extension; 5.06 Procedures under IFC 98; 5.07 Liquidated and ascertained damages; 5.08 Reimbursement of loss and expense under JCT 98 and WCD 98 5.09 Machinery for recovery5.10 Common law claims; 5.11 Reimbursement of loss and expense under IFC 98; 5.12 Delays and disruptions under the JCT Minor Works Form 1998; 6 Completion and Defects Liability; 6.01 Practical completion; 6.02 Sectional completion and partial possession; 6.03 Defects liability; 6.04 Final certificate; 7 Determination; 7.01 Introduction; 7.02 Determination by the employer; 7.03 Determination by the contractor; 7.04 Determination by the employer or contractor: no-fault determination; 7.05 Determination under the Minor Works Form; 8 Subcontractors and Suppliers 8.01 Introduction8.02 Assignment; 8.03 Sub-letting: domestic subcontractors; 8.04 Letters of intent to subcontractors or suppliers; 8.05 Signing the subcontract; 8.06 Nominated suppliers; 8.07 Nominated subcontractors under JCT 98; 8.08 Right of objection; 8.09 Procedures after nomination; 8.10 Re-nomination; 8.11 Named subcontractors under IFC 98; 8.12 Subcontract notices in general; 8.13 Extensions of time; 8.14 Money claims; 8.15 Withholding notices; 8.16 Determination; 9 Settlement of Disputes; 9.01 Introduction; 9.02 Adjudication generally; 9.03 Appointing an adjudicator 9.04 Arbitration generally |
| Record Nr. | UNINA-9910144526803321 |
Powell-Smith Vincent
|
||
| Malden, Mass., : Blackwell Science, 2000 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||
Contract documentation for contractors [[electronic resource] /] / Vincent Powell-Smith, John Sims, and Christopher Dancaster
| Contract documentation for contractors [[electronic resource] /] / Vincent Powell-Smith, John Sims, and Christopher Dancaster |
| Autore | Powell-Smith Vincent |
| Edizione | [3rd ed.] |
| Pubbl/distr/stampa | Malden, Mass., : Blackwell Science, 2000 |
| Descrizione fisica | 1 online resource (330 p.) |
| Disciplina |
346.4102/2
692.80941 |
| Altri autori (Persone) |
SimsJohn <1929->
DancasterChristopher |
| Soggetto topico |
Contracts for work and labor - Great Britain
Contractors - Legal status, laws, etc - Great Britain |
| ISBN |
1-282-35981-9
9786612359811 0-470-69606-0 0-470-69531-5 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
Contract Documentation for Contractors; Contents; Acknowledgements; Preface to the First Edition; Preface to the Third Edition; 1 Introduction; 1.01 General; 1.02 Letters and notices; 1.03 Tabular summary of mandatory requirements; 2 Pre-contract Documentation; 2.01 Introduction; 2.02 Qualification; 2.03 Preliminary enquiry; 2.04 Formal invitation to tender; 2.05 Errors in tender documents; 2.06 Time for tendering; 2.07 Onerous conditions in tender documents; 2.08 Submission of tender; 2.09 Subcontractorsand suppliers; 2.10 Letters of intent; 2.11 Signing the contract; 2.12 Performance bonds
2.13 Advance payment bonds and bonds in respect of payment for off-site materials and/or goods3 Commencement and Progress; 3.01 Pre-commencement meeting; 3.02 Site and progress meetings; 3.03 Site diaries; 3.04 The master programme; 3.05 Discrepancies in documents; 3.06 Compliance with statutory requirements; 3.07 Problems with materials; 3.08 Information necessary for the works; 3.09 Instructions generally; 3.10 Variations; 3.11 Work done by others; 3.12 Other matters; 4 Certificates and Payments; 4.01 Introduction; 4.02 Application for payment; 4.03 Late payment; 4.04 The withholding notice 4.05 Wrongful deductions from the certificate by the employer4.06 Right of suspension of obligations by contractor; 4.07 Problems with interim certificates; 4.08 Off-site goods and materials; 4.09 Retention; 4.10 The Construction Industry Scheme; 5 Delays and Disruptions; 5.01 General; 5.02 Possession of the site and commencement of work; 5.03 Delay in general; 5.04 Detailed procedures under JCT 98 or WCD 98; 5.05 The grant of the extension; 5.06 Procedures under IFC 98; 5.07 Liquidated and ascertained damages; 5.08 Reimbursement of loss and expense under JCT 98 and WCD 98 5.09 Machinery for recovery5.10 Common law claims; 5.11 Reimbursement of loss and expense under IFC 98; 5.12 Delays and disruptions under the JCT Minor Works Form 1998; 6 Completion and Defects Liability; 6.01 Practical completion; 6.02 Sectional completion and partial possession; 6.03 Defects liability; 6.04 Final certificate; 7 Determination; 7.01 Introduction; 7.02 Determination by the employer; 7.03 Determination by the contractor; 7.04 Determination by the employer or contractor: no-fault determination; 7.05 Determination under the Minor Works Form; 8 Subcontractors and Suppliers 8.01 Introduction8.02 Assignment; 8.03 Sub-letting: domestic subcontractors; 8.04 Letters of intent to subcontractors or suppliers; 8.05 Signing the subcontract; 8.06 Nominated suppliers; 8.07 Nominated subcontractors under JCT 98; 8.08 Right of objection; 8.09 Procedures after nomination; 8.10 Re-nomination; 8.11 Named subcontractors under IFC 98; 8.12 Subcontract notices in general; 8.13 Extensions of time; 8.14 Money claims; 8.15 Withholding notices; 8.16 Determination; 9 Settlement of Disputes; 9.01 Introduction; 9.02 Adjudication generally; 9.03 Appointing an adjudicator 9.04 Arbitration generally |
| Record Nr. | UNISA-996212480303316 |
Powell-Smith Vincent
|
||
| Malden, Mass., : Blackwell Science, 2000 | ||
| Lo trovi qui: Univ. di Salerno | ||
| ||
Contract documentation for contractors [[electronic resource] /] / Vincent Powell-Smith, John Sims, and Christopher Dancaster
| Contract documentation for contractors [[electronic resource] /] / Vincent Powell-Smith, John Sims, and Christopher Dancaster |
| Autore | Powell-Smith Vincent |
| Edizione | [3rd ed.] |
| Pubbl/distr/stampa | Malden, Mass., : Blackwell Science, 2000 |
| Descrizione fisica | 1 online resource (330 p.) |
| Disciplina |
346.4102/2
692.80941 |
| Altri autori (Persone) |
SimsJohn <1929->
DancasterChristopher |
| Soggetto topico |
Contracts for work and labor - Great Britain
Contractors - Legal status, laws, etc - Great Britain |
| ISBN |
1-282-35981-9
9786612359811 0-470-69606-0 0-470-69531-5 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
Contract Documentation for Contractors; Contents; Acknowledgements; Preface to the First Edition; Preface to the Third Edition; 1 Introduction; 1.01 General; 1.02 Letters and notices; 1.03 Tabular summary of mandatory requirements; 2 Pre-contract Documentation; 2.01 Introduction; 2.02 Qualification; 2.03 Preliminary enquiry; 2.04 Formal invitation to tender; 2.05 Errors in tender documents; 2.06 Time for tendering; 2.07 Onerous conditions in tender documents; 2.08 Submission of tender; 2.09 Subcontractorsand suppliers; 2.10 Letters of intent; 2.11 Signing the contract; 2.12 Performance bonds
2.13 Advance payment bonds and bonds in respect of payment for off-site materials and/or goods3 Commencement and Progress; 3.01 Pre-commencement meeting; 3.02 Site and progress meetings; 3.03 Site diaries; 3.04 The master programme; 3.05 Discrepancies in documents; 3.06 Compliance with statutory requirements; 3.07 Problems with materials; 3.08 Information necessary for the works; 3.09 Instructions generally; 3.10 Variations; 3.11 Work done by others; 3.12 Other matters; 4 Certificates and Payments; 4.01 Introduction; 4.02 Application for payment; 4.03 Late payment; 4.04 The withholding notice 4.05 Wrongful deductions from the certificate by the employer4.06 Right of suspension of obligations by contractor; 4.07 Problems with interim certificates; 4.08 Off-site goods and materials; 4.09 Retention; 4.10 The Construction Industry Scheme; 5 Delays and Disruptions; 5.01 General; 5.02 Possession of the site and commencement of work; 5.03 Delay in general; 5.04 Detailed procedures under JCT 98 or WCD 98; 5.05 The grant of the extension; 5.06 Procedures under IFC 98; 5.07 Liquidated and ascertained damages; 5.08 Reimbursement of loss and expense under JCT 98 and WCD 98 5.09 Machinery for recovery5.10 Common law claims; 5.11 Reimbursement of loss and expense under IFC 98; 5.12 Delays and disruptions under the JCT Minor Works Form 1998; 6 Completion and Defects Liability; 6.01 Practical completion; 6.02 Sectional completion and partial possession; 6.03 Defects liability; 6.04 Final certificate; 7 Determination; 7.01 Introduction; 7.02 Determination by the employer; 7.03 Determination by the contractor; 7.04 Determination by the employer or contractor: no-fault determination; 7.05 Determination under the Minor Works Form; 8 Subcontractors and Suppliers 8.01 Introduction8.02 Assignment; 8.03 Sub-letting: domestic subcontractors; 8.04 Letters of intent to subcontractors or suppliers; 8.05 Signing the subcontract; 8.06 Nominated suppliers; 8.07 Nominated subcontractors under JCT 98; 8.08 Right of objection; 8.09 Procedures after nomination; 8.10 Re-nomination; 8.11 Named subcontractors under IFC 98; 8.12 Subcontract notices in general; 8.13 Extensions of time; 8.14 Money claims; 8.15 Withholding notices; 8.16 Determination; 9 Settlement of Disputes; 9.01 Introduction; 9.02 Adjudication generally; 9.03 Appointing an adjudicator 9.04 Arbitration generally |
| Record Nr. | UNINA-9910829933303321 |
Powell-Smith Vincent
|
||
| Malden, Mass., : Blackwell Science, 2000 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||
The JCT 05 standard building sub-contract [[electronic resource] /] / Peter Barnes
| The JCT 05 standard building sub-contract [[electronic resource] /] / Peter Barnes |
| Autore | Barnes Peter |
| Edizione | [1st ed.] |
| Pubbl/distr/stampa | Boston, : Blackwell Pub., c2006 |
| Descrizione fisica | 1 online resource (386 p.) |
| Disciplina |
343.4107869
692.80941 |
| Soggetto topico |
Construction contracts - England
Construction industry - Subcontracting - England |
| Soggetto genere / forma | Electronic books. |
| ISBN |
1-280-74878-8
9786610748785 0-470-76412-0 0-470-75970-4 1-4051-7267-3 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
The JCT 05 Standard Building Sub-Contract; Contents; Preface; Definitions; 1 Background and Introduction; The purpose and use of the JCT Standard Building Sub-Contract; Sub-contracting generally; Letters of intent; Standard forms of contract and sub-contract; 2 SBCSub/A and SBCSub/D/A; The JCT Standard Building Sub-Contract Agreement (SBCSub/A or SBCSub/D/A) - introduction; The structure of SBCSub/A and SBCSub/D/A; The recitals; The articles; The sub-contract particulars; Summary of interim and final payment provisions; Attestation forms; Schedule of information
Notes (to annexures to the agreement and to the schedule of information)Supplementary particulars (containing information needed for formula adjustment); 3 Definitions and Interpretations; The JCT Standard Building Sub-Contract Conditions (SBCSub/C or SBCSub/D/C): section 1 (including clauses 1.1 to 1.10 of SBCSub/C and SBCSub/D/C); General; Section 1 - definitions and interpretation; 4 Sub-Contractor's Obligations; SBCSub/C and SBCSub/D/C: Section 2 - carrying out the sub-contract works (clauses 2.1, 2.2, 2.4 to 2.15 inclusive and schedule 5- contractor's design submission procedure) Sub-contractor's obligationsSupply of documents, setting out, etc.; Errors, discrepancies and divergencies; Sub-contractor's design portion (SCDP) design work; Unfixed materials and goods; 5 Time; SBCSub/C and SBCSub/D/C: section 2 - carrying out the sub-contract works (clauses 2.3, 2.16 to 2.21 inclusive); Sub-contractor's obligations; Adjustment of period for completion; Practical completion and lateness; 6 Defects, Design Documents and Warranties; SBCSub/C and SBCSub/D/C: section 2 - carrying out the sub-contract works (clauses 2.22 to 2.26 inclusive); Defects Sub-contractor's design documentsCollateral warranties; 7 Control of the Sub-Contract Works; SBCSub/C and SBCSub/D/C: section 3 - control of the sub-contract works (and schedule 1 sub-contract code of practice); Assignment and sub-letting; Contractor's directions; Opening up and remedial measures; Attendance and site conduct; Health and safety and CDM requirements; Suspension of main contract by contractor; Other provisions; 8 Payment; SBCSub/C and SBCSub/D/C: section 4 - payment (clauses 4.1 to 4.18 inclusive; schedule 3 forms of bonds; and schedule 4 fluctuations options) Payment - generallySub-contract sum and sub-contract tender sum; Payments; Gross valuation; Retention; Discount; The final payment; Counterclaim, set-off and abatement; The payment notice; The withholding notice; Timing of payments, payment notices and withholding notices; Interest; Sub-contractor's right of suspension; Fluctuation options; 9 Loss and Expense; SBCSub/C and SBCSub/D/C: section 4 - payment (clauses 4.19 to 4.22 inclusive; Introduction; Loss and expense; Potential heads of claim for a loss and expense claim Common law damages claims (in respect of a breach of contract) (reservation of rights and remedies of contractor and sub-contractor) |
| Record Nr. | UNINA-9910143321703321 |
Barnes Peter
|
||
| Boston, : Blackwell Pub., c2006 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||
The JCT 05 standard building sub-contract [[electronic resource] /] / Peter Barnes
| The JCT 05 standard building sub-contract [[electronic resource] /] / Peter Barnes |
| Autore | Barnes Peter |
| Edizione | [1st ed.] |
| Pubbl/distr/stampa | Boston, : Blackwell Pub., c2006 |
| Descrizione fisica | 1 online resource (386 p.) |
| Disciplina |
343.4107869
692.80941 |
| Soggetto topico |
Construction contracts - England
Construction industry - Subcontracting - England |
| ISBN |
1-280-74878-8
9786610748785 0-470-76412-0 0-470-75970-4 1-4051-7267-3 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
The JCT 05 Standard Building Sub-Contract; Contents; Preface; Definitions; 1 Background and Introduction; The purpose and use of the JCT Standard Building Sub-Contract; Sub-contracting generally; Letters of intent; Standard forms of contract and sub-contract; 2 SBCSub/A and SBCSub/D/A; The JCT Standard Building Sub-Contract Agreement (SBCSub/A or SBCSub/D/A) - introduction; The structure of SBCSub/A and SBCSub/D/A; The recitals; The articles; The sub-contract particulars; Summary of interim and final payment provisions; Attestation forms; Schedule of information
Notes (to annexures to the agreement and to the schedule of information)Supplementary particulars (containing information needed for formula adjustment); 3 Definitions and Interpretations; The JCT Standard Building Sub-Contract Conditions (SBCSub/C or SBCSub/D/C): section 1 (including clauses 1.1 to 1.10 of SBCSub/C and SBCSub/D/C); General; Section 1 - definitions and interpretation; 4 Sub-Contractor's Obligations; SBCSub/C and SBCSub/D/C: Section 2 - carrying out the sub-contract works (clauses 2.1, 2.2, 2.4 to 2.15 inclusive and schedule 5- contractor's design submission procedure) Sub-contractor's obligationsSupply of documents, setting out, etc.; Errors, discrepancies and divergencies; Sub-contractor's design portion (SCDP) design work; Unfixed materials and goods; 5 Time; SBCSub/C and SBCSub/D/C: section 2 - carrying out the sub-contract works (clauses 2.3, 2.16 to 2.21 inclusive); Sub-contractor's obligations; Adjustment of period for completion; Practical completion and lateness; 6 Defects, Design Documents and Warranties; SBCSub/C and SBCSub/D/C: section 2 - carrying out the sub-contract works (clauses 2.22 to 2.26 inclusive); Defects Sub-contractor's design documentsCollateral warranties; 7 Control of the Sub-Contract Works; SBCSub/C and SBCSub/D/C: section 3 - control of the sub-contract works (and schedule 1 sub-contract code of practice); Assignment and sub-letting; Contractor's directions; Opening up and remedial measures; Attendance and site conduct; Health and safety and CDM requirements; Suspension of main contract by contractor; Other provisions; 8 Payment; SBCSub/C and SBCSub/D/C: section 4 - payment (clauses 4.1 to 4.18 inclusive; schedule 3 forms of bonds; and schedule 4 fluctuations options) Payment - generallySub-contract sum and sub-contract tender sum; Payments; Gross valuation; Retention; Discount; The final payment; Counterclaim, set-off and abatement; The payment notice; The withholding notice; Timing of payments, payment notices and withholding notices; Interest; Sub-contractor's right of suspension; Fluctuation options; 9 Loss and Expense; SBCSub/C and SBCSub/D/C: section 4 - payment (clauses 4.19 to 4.22 inclusive; Introduction; Loss and expense; Potential heads of claim for a loss and expense claim Common law damages claims (in respect of a breach of contract) (reservation of rights and remedies of contractor and sub-contractor) |
| Record Nr. | UNISA-996213069403316 |
Barnes Peter
|
||
| Boston, : Blackwell Pub., c2006 | ||
| Lo trovi qui: Univ. di Salerno | ||
| ||
The JCT 05 standard building sub-contract [[electronic resource] /] / Peter Barnes
| The JCT 05 standard building sub-contract [[electronic resource] /] / Peter Barnes |
| Autore | Barnes Peter |
| Edizione | [1st ed.] |
| Pubbl/distr/stampa | Boston, : Blackwell Pub., c2006 |
| Descrizione fisica | 1 online resource (386 p.) |
| Disciplina |
343.4107869
692.80941 |
| Soggetto topico |
Construction contracts - England
Construction industry - Subcontracting - England |
| ISBN |
1-280-74878-8
9786610748785 0-470-76412-0 0-470-75970-4 1-4051-7267-3 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
The JCT 05 Standard Building Sub-Contract; Contents; Preface; Definitions; 1 Background and Introduction; The purpose and use of the JCT Standard Building Sub-Contract; Sub-contracting generally; Letters of intent; Standard forms of contract and sub-contract; 2 SBCSub/A and SBCSub/D/A; The JCT Standard Building Sub-Contract Agreement (SBCSub/A or SBCSub/D/A) - introduction; The structure of SBCSub/A and SBCSub/D/A; The recitals; The articles; The sub-contract particulars; Summary of interim and final payment provisions; Attestation forms; Schedule of information
Notes (to annexures to the agreement and to the schedule of information)Supplementary particulars (containing information needed for formula adjustment); 3 Definitions and Interpretations; The JCT Standard Building Sub-Contract Conditions (SBCSub/C or SBCSub/D/C): section 1 (including clauses 1.1 to 1.10 of SBCSub/C and SBCSub/D/C); General; Section 1 - definitions and interpretation; 4 Sub-Contractor's Obligations; SBCSub/C and SBCSub/D/C: Section 2 - carrying out the sub-contract works (clauses 2.1, 2.2, 2.4 to 2.15 inclusive and schedule 5- contractor's design submission procedure) Sub-contractor's obligationsSupply of documents, setting out, etc.; Errors, discrepancies and divergencies; Sub-contractor's design portion (SCDP) design work; Unfixed materials and goods; 5 Time; SBCSub/C and SBCSub/D/C: section 2 - carrying out the sub-contract works (clauses 2.3, 2.16 to 2.21 inclusive); Sub-contractor's obligations; Adjustment of period for completion; Practical completion and lateness; 6 Defects, Design Documents and Warranties; SBCSub/C and SBCSub/D/C: section 2 - carrying out the sub-contract works (clauses 2.22 to 2.26 inclusive); Defects Sub-contractor's design documentsCollateral warranties; 7 Control of the Sub-Contract Works; SBCSub/C and SBCSub/D/C: section 3 - control of the sub-contract works (and schedule 1 sub-contract code of practice); Assignment and sub-letting; Contractor's directions; Opening up and remedial measures; Attendance and site conduct; Health and safety and CDM requirements; Suspension of main contract by contractor; Other provisions; 8 Payment; SBCSub/C and SBCSub/D/C: section 4 - payment (clauses 4.1 to 4.18 inclusive; schedule 3 forms of bonds; and schedule 4 fluctuations options) Payment - generallySub-contract sum and sub-contract tender sum; Payments; Gross valuation; Retention; Discount; The final payment; Counterclaim, set-off and abatement; The payment notice; The withholding notice; Timing of payments, payment notices and withholding notices; Interest; Sub-contractor's right of suspension; Fluctuation options; 9 Loss and Expense; SBCSub/C and SBCSub/D/C: section 4 - payment (clauses 4.19 to 4.22 inclusive; Introduction; Loss and expense; Potential heads of claim for a loss and expense claim Common law damages claims (in respect of a breach of contract) (reservation of rights and remedies of contractor and sub-contractor) |
| Record Nr. | UNINA-9910830104003321 |
Barnes Peter
|
||
| Boston, : Blackwell Pub., c2006 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||
JCT contract administration pocket book / / Andy Atkinson
| JCT contract administration pocket book / / Andy Atkinson |
| Autore | Atkinson Andy |
| Edizione | [Second edition.] |
| Pubbl/distr/stampa | Abingdon, Oxon ; ; New York, NY : , : Routledge, , 2021 |
| Descrizione fisica | 1 online resource (249 pages) |
| Disciplina | 692.80941 |
| Soggetto topico |
Building - Superintendence - Great Britain
Construction industry - Subcontracting - Great Britain |
| ISBN |
1-00-312079-2
1-000-29298-3 1-003-12079-2 1-000-29292-4 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto | Cover -- Half Title -- Title Page -- Copyright Page -- Contents -- Foreword -- Preface -- 1. Building procurement strategy -- 2. Building procurement procedures -- 3. Interim payments -- 4. Final accounts -- 5. Progress -- 6. Claims -- 7. Termination and insolvency -- 8. The supply chain and subcontracting -- 9. Indemnity and insurance -- 10. Fluctuations -- 11. Maintaining quality -- 12. An introduction to dispute resolution in construction -- 13. The construction actadjudication and payment -- 14. Building information modelling and the JCT contracts -- Glossary -- Index. |
| Record Nr. | UNINA-9910860820503321 |
Atkinson Andy
|
||
| Abingdon, Oxon ; ; New York, NY : , : Routledge, , 2021 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||
The JCT intermediate building contracts [[electronic resource] /] / David Chappell
| The JCT intermediate building contracts [[electronic resource] /] / David Chappell |
| Autore | Chappell David |
| Edizione | [3rd ed.] |
| Pubbl/distr/stampa | Oxford, : Blackwell, 2006 |
| Descrizione fisica | 1 online resource (390 p.) |
| Disciplina |
343.41/07869
692.8 692.80941 |
| Altri autori (Persone) | ChappellDavid |
| Soggetto topico |
Construction contracts - Great Britain
Building |
| Soggetto genere / forma | Electronic books. |
| ISBN |
1-280-74879-6
9786610748792 0-470-76413-9 0-470-75971-2 1-4051-7268-1 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
The JCT Intermediate Building Contracts 2005; Contents; Preface to the Third Edition; Chapter 1: The Purpose and Use of IC and ICD; 1.1 The background; 1.2 IC documentation; 1.3 The use of IC; 1.4 Completing the form; Chapter 2: Contracts Compared; Chapter 3: Contract Documents and Insurance; 3.1 Contract documents; 3.1.1 Types and uses; 3.1.2 Importance and priority; 3.1.3 Errors; 3.1.4 Custody and copies; 3.1.5 Limits to use; 3.1.6 Notices; 3.2 Insurance; 3.2.1 Indemnity; 3.2.2 Injury to persons and property; 3.2.3 Things which are the liability of the employer
3.2.4 Insurance of the Works: alternative clauses3.2.5 A new building where the contractor is required to insure; 3.2.6 A new building where the employer insures; 3.2.7 Alterations or extensions to an existing building; 3.2.8 Benefits for sub-contractors; 3.2.9 Joint fire code; 3.2.10 Terrorism cover; 3.3 Summary; Chapter 4: The Architect's Authority and Duties; 4.1 Authority; 4.1.1 General; 4.1.2 Express provisions; 4.1.3 The issue of instructions: general; 4.1.4 Instructions in detail; 4.2 Duties; 4.2.1 Duties under the contract; 4.2.2 General duties; 4.3 Summary Chapter 5: The Contractor's Obligations5.1 Express and implied obligations; 5.1.1 Legal principles; 5.1.2 Execution of the Works; 5.1.3 Workmanship and materials; 5.1.4 Statutory obligations; 5.1.5 Person-in-charge; 5.1.6 Levels and setting out; 5.2 Other obligations; 5.2.1 Access to the Works and premises; 5.2.2 Drawings, details and information; 5.2.3 Compliance with architect's instructions; 5.2.4 Suspension of performance; 5.2.5 Other rights and obligations; 5.3 Summary; Chapter 6: The Employer's Powers, Duties and Rights; 6.1 Express and implied powers and duties 6.1.1 Co-operation or non-interference6.2 Rights; 6.2.1 General; 6.2.2 Deferment of possession of the site; 6.2.3 Deduction/repayment of liquidated damages; 6.2.4 Employment of direct contractors; 6.2.5 Rights as to insurance; 6.3 Duties; 6.3.1 General; 6.3.2 Payment; 6.3.3 Retention; 6.3.4 Other duties; 6.4 Summary; Chapter 7: The Clerk of Works; 7.1 Appointment; 7.2 Duties; 7.3 Responsibility; 7.4 Summary; Chapter 8: Sub-Contractors and Suppliers; 8.1 General; 8.2 Sub-contractors; 8.2.1 Assignment and sub-contracting; 8.2.2 Named persons as sub-contractors; 8.3 Statutory authorities 8.4 Work not forming part of the contract8.5 Third party rights and collateral warranties; 8.6 Summary; Chapter 9: Possession, Practical Completion and Defects Liability; 9.1 Possession; 9.1.1 General; 9.1.2 Date for possession; 9.2 Practical completion; 9.2.1 Definition; 9.2.2 Consequences; 9.2.3 Partial possession and sectional completion; 9.3 Rectification period; 9.3.1 Definition; 9.3.2 Defects, shrinkages or other faults; 9.3.3 Frost; 9.3.4 Procedure; 9.4 Summary; Chapter 10: Claims; 10.1 General; 10.2 Extension of time; 10.2.1 Legal principles; 10.2.2 Liquidated damages 10.2.3 Procedure |
| Record Nr. | UNINA-9910143321903321 |
Chappell David
|
||
| Oxford, : Blackwell, 2006 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||
The JCT intermediate building contracts [[electronic resource] /] / David Chappell
| The JCT intermediate building contracts [[electronic resource] /] / David Chappell |
| Autore | Chappell David |
| Edizione | [3rd ed.] |
| Pubbl/distr/stampa | Oxford, : Blackwell, 2006 |
| Descrizione fisica | 1 online resource (390 p.) |
| Disciplina |
343.41/07869
692.8 692.80941 |
| Altri autori (Persone) | ChappellDavid |
| Soggetto topico |
Construction contracts - Great Britain
Building |
| ISBN |
1-280-74879-6
9786610748792 0-470-76413-9 0-470-75971-2 1-4051-7268-1 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
The JCT Intermediate Building Contracts 2005; Contents; Preface to the Third Edition; Chapter 1: The Purpose and Use of IC and ICD; 1.1 The background; 1.2 IC documentation; 1.3 The use of IC; 1.4 Completing the form; Chapter 2: Contracts Compared; Chapter 3: Contract Documents and Insurance; 3.1 Contract documents; 3.1.1 Types and uses; 3.1.2 Importance and priority; 3.1.3 Errors; 3.1.4 Custody and copies; 3.1.5 Limits to use; 3.1.6 Notices; 3.2 Insurance; 3.2.1 Indemnity; 3.2.2 Injury to persons and property; 3.2.3 Things which are the liability of the employer
3.2.4 Insurance of the Works: alternative clauses3.2.5 A new building where the contractor is required to insure; 3.2.6 A new building where the employer insures; 3.2.7 Alterations or extensions to an existing building; 3.2.8 Benefits for sub-contractors; 3.2.9 Joint fire code; 3.2.10 Terrorism cover; 3.3 Summary; Chapter 4: The Architect's Authority and Duties; 4.1 Authority; 4.1.1 General; 4.1.2 Express provisions; 4.1.3 The issue of instructions: general; 4.1.4 Instructions in detail; 4.2 Duties; 4.2.1 Duties under the contract; 4.2.2 General duties; 4.3 Summary Chapter 5: The Contractor's Obligations5.1 Express and implied obligations; 5.1.1 Legal principles; 5.1.2 Execution of the Works; 5.1.3 Workmanship and materials; 5.1.4 Statutory obligations; 5.1.5 Person-in-charge; 5.1.6 Levels and setting out; 5.2 Other obligations; 5.2.1 Access to the Works and premises; 5.2.2 Drawings, details and information; 5.2.3 Compliance with architect's instructions; 5.2.4 Suspension of performance; 5.2.5 Other rights and obligations; 5.3 Summary; Chapter 6: The Employer's Powers, Duties and Rights; 6.1 Express and implied powers and duties 6.1.1 Co-operation or non-interference6.2 Rights; 6.2.1 General; 6.2.2 Deferment of possession of the site; 6.2.3 Deduction/repayment of liquidated damages; 6.2.4 Employment of direct contractors; 6.2.5 Rights as to insurance; 6.3 Duties; 6.3.1 General; 6.3.2 Payment; 6.3.3 Retention; 6.3.4 Other duties; 6.4 Summary; Chapter 7: The Clerk of Works; 7.1 Appointment; 7.2 Duties; 7.3 Responsibility; 7.4 Summary; Chapter 8: Sub-Contractors and Suppliers; 8.1 General; 8.2 Sub-contractors; 8.2.1 Assignment and sub-contracting; 8.2.2 Named persons as sub-contractors; 8.3 Statutory authorities 8.4 Work not forming part of the contract8.5 Third party rights and collateral warranties; 8.6 Summary; Chapter 9: Possession, Practical Completion and Defects Liability; 9.1 Possession; 9.1.1 General; 9.1.2 Date for possession; 9.2 Practical completion; 9.2.1 Definition; 9.2.2 Consequences; 9.2.3 Partial possession and sectional completion; 9.3 Rectification period; 9.3.1 Definition; 9.3.2 Defects, shrinkages or other faults; 9.3.3 Frost; 9.3.4 Procedure; 9.4 Summary; Chapter 10: Claims; 10.1 General; 10.2 Extension of time; 10.2.1 Legal principles; 10.2.2 Liquidated damages 10.2.3 Procedure |
| Record Nr. | UNISA-996213069503316 |
Chappell David
|
||
| Oxford, : Blackwell, 2006 | ||
| Lo trovi qui: Univ. di Salerno | ||
| ||
The JCT intermediate building contracts [[electronic resource] /] / David Chappell
| The JCT intermediate building contracts [[electronic resource] /] / David Chappell |
| Autore | Chappell David |
| Edizione | [3rd ed.] |
| Pubbl/distr/stampa | Oxford, : Blackwell, 2006 |
| Descrizione fisica | 1 online resource (390 p.) |
| Disciplina |
343.41/07869
692.8 692.80941 |
| Altri autori (Persone) | ChappellDavid |
| Soggetto topico |
Construction contracts - Great Britain
Building |
| ISBN |
1-280-74879-6
9786610748792 0-470-76413-9 0-470-75971-2 1-4051-7268-1 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
The JCT Intermediate Building Contracts 2005; Contents; Preface to the Third Edition; Chapter 1: The Purpose and Use of IC and ICD; 1.1 The background; 1.2 IC documentation; 1.3 The use of IC; 1.4 Completing the form; Chapter 2: Contracts Compared; Chapter 3: Contract Documents and Insurance; 3.1 Contract documents; 3.1.1 Types and uses; 3.1.2 Importance and priority; 3.1.3 Errors; 3.1.4 Custody and copies; 3.1.5 Limits to use; 3.1.6 Notices; 3.2 Insurance; 3.2.1 Indemnity; 3.2.2 Injury to persons and property; 3.2.3 Things which are the liability of the employer
3.2.4 Insurance of the Works: alternative clauses3.2.5 A new building where the contractor is required to insure; 3.2.6 A new building where the employer insures; 3.2.7 Alterations or extensions to an existing building; 3.2.8 Benefits for sub-contractors; 3.2.9 Joint fire code; 3.2.10 Terrorism cover; 3.3 Summary; Chapter 4: The Architect's Authority and Duties; 4.1 Authority; 4.1.1 General; 4.1.2 Express provisions; 4.1.3 The issue of instructions: general; 4.1.4 Instructions in detail; 4.2 Duties; 4.2.1 Duties under the contract; 4.2.2 General duties; 4.3 Summary Chapter 5: The Contractor's Obligations5.1 Express and implied obligations; 5.1.1 Legal principles; 5.1.2 Execution of the Works; 5.1.3 Workmanship and materials; 5.1.4 Statutory obligations; 5.1.5 Person-in-charge; 5.1.6 Levels and setting out; 5.2 Other obligations; 5.2.1 Access to the Works and premises; 5.2.2 Drawings, details and information; 5.2.3 Compliance with architect's instructions; 5.2.4 Suspension of performance; 5.2.5 Other rights and obligations; 5.3 Summary; Chapter 6: The Employer's Powers, Duties and Rights; 6.1 Express and implied powers and duties 6.1.1 Co-operation or non-interference6.2 Rights; 6.2.1 General; 6.2.2 Deferment of possession of the site; 6.2.3 Deduction/repayment of liquidated damages; 6.2.4 Employment of direct contractors; 6.2.5 Rights as to insurance; 6.3 Duties; 6.3.1 General; 6.3.2 Payment; 6.3.3 Retention; 6.3.4 Other duties; 6.4 Summary; Chapter 7: The Clerk of Works; 7.1 Appointment; 7.2 Duties; 7.3 Responsibility; 7.4 Summary; Chapter 8: Sub-Contractors and Suppliers; 8.1 General; 8.2 Sub-contractors; 8.2.1 Assignment and sub-contracting; 8.2.2 Named persons as sub-contractors; 8.3 Statutory authorities 8.4 Work not forming part of the contract8.5 Third party rights and collateral warranties; 8.6 Summary; Chapter 9: Possession, Practical Completion and Defects Liability; 9.1 Possession; 9.1.1 General; 9.1.2 Date for possession; 9.2 Practical completion; 9.2.1 Definition; 9.2.2 Consequences; 9.2.3 Partial possession and sectional completion; 9.3 Rectification period; 9.3.1 Definition; 9.3.2 Defects, shrinkages or other faults; 9.3.3 Frost; 9.3.4 Procedure; 9.4 Summary; Chapter 10: Claims; 10.1 General; 10.2 Extension of time; 10.2.1 Legal principles; 10.2.2 Liquidated damages 10.2.3 Procedure |
| Record Nr. | UNINA-9910829815703321 |
Chappell David
|
||
| Oxford, : Blackwell, 2006 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||