Cours de barrages / F. Bonnet |
Autore | Bonnet, F. |
Edizione | [3.ed. revue augmentee et mise a jour] |
Pubbl/distr/stampa | Paris : Ecole speciale des travaux, 1931 |
Descrizione fisica | 2 v. : ill. ; 21 cm |
Disciplina | 627.82 |
Soggetto non controllato |
Fondazioni
Dighe in muratura Dighe di ritenuta |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | fre |
Nota di contenuto | 1.: Barrages en maconnerie 2.: Barrages en beton arme, Barrages metalliques, Barrages en terre ... |
Record Nr. | UNINA-990000877660403321 |
Bonnet, F. | ||
Paris : Ecole speciale des travaux, 1931 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
The finite element method in thin shell theory : application to arch dam simulations / M. Bernadou, J. M. Boisserie |
Autore | Bernadou, Michel |
Pubbl/distr/stampa | Boston : Birkhauser, 1982 |
Descrizione fisica | x, 199 p. : ill. ; 24 cm. |
Disciplina | 627.82 |
Altri autori (Persone) | Boisserie, Jean-Marie |
Collana | Progress in scientific computing ; 1 |
Soggetto topico |
Arch dams-mathematical models
Finite difference methods Finite element method Shells |
ISBN | 3764330708 |
Classificazione | AMS 65M06 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Record Nr. | UNISALENTO-991000889819707536 |
Bernadou, Michel | ||
Boston : Birkhauser, 1982 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. del Salento | ||
|
Hydraulics of dams and reservoirs / by Fuat Sentürk |
Autore | Sentürk, Fuat |
Pubbl/distr/stampa | Highlands Ranch (Colorado) : Water Resources Publications, c1994 |
Descrizione fisica | XXIV, 788 p. : ill. ; 24 cm. |
Disciplina | 627.82 |
Soggetto topico |
Ingegneria idraulica
Dighe in muratura |
ISBN | 0-918334-80-2 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Record Nr. | UNIBAS-000010511 |
Sentürk, Fuat | ||
Highlands Ranch (Colorado) : Water Resources Publications, c1994 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. della Basilicata | ||
|
Introduzione allo studio delle dighe = sbarramenti in muratura / Claudio Datei |
Autore | Datei, Claudio |
Edizione | [2. ed.] |
Pubbl/distr/stampa | Padova : Edizioni Libreria Cortina, 1986 |
Descrizione fisica | VIII, 237 p. ; 24 cm |
Disciplina | 627.82 |
Soggetto topico | Dighe in muratura |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | ita |
Record Nr. | UNIBAS-000009006 |
Datei, Claudio | ||
Padova : Edizioni Libreria Cortina, 1986 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. della Basilicata | ||
|
Navigating gender-inclusive resettlement : the experience of the Song Bung 4 hydropower project in Vietnam / / Asian Development Bank |
Pubbl/distr/stampa | Metro Manila, Philippines : , : Asian Development Bank, , 2014 |
Descrizione fisica | 1 online resource (64 p.) |
Disciplina | 627.82 |
Soggetto topico |
Dams - Social aspects - Vietnam
Forced migration - Social aspects - Vietnam Water resources development - Social aspects - Vietnam Hydroelectric power plants - Vietnam |
Soggetto genere / forma | Electronic books. |
ISBN | 92-9254-818-2 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Cover; CONTENTS; LIST OF TABLES AND FIGURES; TABLES; 1 Demographic Distribution of Song Bung 4 Hydropower Project Affected Persons; 2 Joint Bank Accounts for Song Bung 4 Hydropower Project Affected Persons; 3 Separate Bank Accounts for Song Bung 4 Hydropower Project Affected Persons; 4 Antenatal Checks and Birth Deliveries at Medical Facilities; 5 Sex-Disaggregated Song Bung 4 Hydropower Project Staffing Statistics; FIGURES; 1 Resettlement-Related Project Documents; 2 Map of Song Bung 4 Hydropower Project Area; 3 Flow Diagram of Song Bung 4 Hydropower Project Participatory Stages
ACKNOWLEDGMENTSABBREVIATIONS; CURRENCY EQUIVALENTS; I. BACKGROUND AND INTRODUCTION; A. Overview of the Song Bung 4 Hydropower Project; B. The Importance of Gender-Responsive Resettlement Approaches; C. Background: Song Bung 4 Hydropower Project Affected People; D. Prevailing Gender Issues and Situation of Co Tu Minority Women; E. Project Resettlement and Ethnic Minority Development Plan; F. Complementary Japan Fund for Poverty Reduction Grant; G. Project Gender Action Plan; H. Schedule of Physical Relocation and Resettlement; II. GENDER-RESPONSIVE PARTICIPATORY APPROACHES A. Women's Voices Heard and Agreement Obtained in Resettlement ConsultationsB. Women Selected and Planned Their Resettlement Sites; C. Women In.uenced Infrastructure Design, Monitored Site Construction, and Contributed to Infrastructure Maintenance; D. Women's Participation Is Being Sustained beyond the Resettlement Process; III. GENDER-RELATED RESETTLEMENT BENEFITS; A. Women Have Equal Entitlements to Compensation; B. Women Have Direct Channels to Redress Compensation Grievances; C. Safeguarding Women's Finances D. Women Enjoy Improved Mobility, Access to Services, and Better Living ConditionsE. Women's Skills and Capacity Developed; F. Women's Solidarity, Leadership, and Networking Strengthened; G. Women Acquire Higher Status and Command More Respect; IV. MITIGATING EMERGING SOCIAL RISKS AND MANAGING NEGATIVE POTENTIAL IMPACTS; A. Labor Rights and Associated Social Risks; B. Maintaining Social Cohesion; C. Sustainability and Maintenance of Infrastructure; D. Maintaining Motivation for Livelihood Restoration and Financial Management; E. Protecting the Most Vulnerable; F. Addressing Road Safety V. CAPACITY BUILDING OF EXECUTING AND IMPLEMENTING AGENCIESA. Song Bung 4 Hydropower Project Management Board; B. Agribank Nam Giang District Branch; VI. CONCLUSION; APPENDIXES; 1 List of Persons Met; 2 Education Data by Resettlement Site; 3 Sex-Disaggregated Livelihood Training Data |
Record Nr. | UNINA-9910480102603321 |
Metro Manila, Philippines : , : Asian Development Bank, , 2014 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
Navigating gender-inclusive resettlement : the experience of the Song Bung 4 hydropower project in Vietnam / / Asian Development Bank |
Pubbl/distr/stampa | Metro Manila, Philippines : , : Asian Development Bank, , 2014 |
Descrizione fisica | 1 online resource (64 p.) |
Disciplina | 627.82 |
Soggetto topico |
Dams - Social aspects - Vietnam
Forced migration - Social aspects - Vietnam Water resources development - Social aspects - Vietnam Hydroelectric power plants - Vietnam |
ISBN | 92-9254-818-2 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Cover; CONTENTS; LIST OF TABLES AND FIGURES; TABLES; 1 Demographic Distribution of Song Bung 4 Hydropower Project Affected Persons; 2 Joint Bank Accounts for Song Bung 4 Hydropower Project Affected Persons; 3 Separate Bank Accounts for Song Bung 4 Hydropower Project Affected Persons; 4 Antenatal Checks and Birth Deliveries at Medical Facilities; 5 Sex-Disaggregated Song Bung 4 Hydropower Project Staffing Statistics; FIGURES; 1 Resettlement-Related Project Documents; 2 Map of Song Bung 4 Hydropower Project Area; 3 Flow Diagram of Song Bung 4 Hydropower Project Participatory Stages
ACKNOWLEDGMENTSABBREVIATIONS; CURRENCY EQUIVALENTS; I. BACKGROUND AND INTRODUCTION; A. Overview of the Song Bung 4 Hydropower Project; B. The Importance of Gender-Responsive Resettlement Approaches; C. Background: Song Bung 4 Hydropower Project Affected People; D. Prevailing Gender Issues and Situation of Co Tu Minority Women; E. Project Resettlement and Ethnic Minority Development Plan; F. Complementary Japan Fund for Poverty Reduction Grant; G. Project Gender Action Plan; H. Schedule of Physical Relocation and Resettlement; II. GENDER-RESPONSIVE PARTICIPATORY APPROACHES A. Women's Voices Heard and Agreement Obtained in Resettlement ConsultationsB. Women Selected and Planned Their Resettlement Sites; C. Women In.uenced Infrastructure Design, Monitored Site Construction, and Contributed to Infrastructure Maintenance; D. Women's Participation Is Being Sustained beyond the Resettlement Process; III. GENDER-RELATED RESETTLEMENT BENEFITS; A. Women Have Equal Entitlements to Compensation; B. Women Have Direct Channels to Redress Compensation Grievances; C. Safeguarding Women's Finances D. Women Enjoy Improved Mobility, Access to Services, and Better Living ConditionsE. Women's Skills and Capacity Developed; F. Women's Solidarity, Leadership, and Networking Strengthened; G. Women Acquire Higher Status and Command More Respect; IV. MITIGATING EMERGING SOCIAL RISKS AND MANAGING NEGATIVE POTENTIAL IMPACTS; A. Labor Rights and Associated Social Risks; B. Maintaining Social Cohesion; C. Sustainability and Maintenance of Infrastructure; D. Maintaining Motivation for Livelihood Restoration and Financial Management; E. Protecting the Most Vulnerable; F. Addressing Road Safety V. CAPACITY BUILDING OF EXECUTING AND IMPLEMENTING AGENCIESA. Song Bung 4 Hydropower Project Management Board; B. Agribank Nam Giang District Branch; VI. CONCLUSION; APPENDIXES; 1 List of Persons Met; 2 Education Data by Resettlement Site; 3 Sex-Disaggregated Livelihood Training Data |
Record Nr. | UNINA-9910798018303321 |
Metro Manila, Philippines : , : Asian Development Bank, , 2014 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
Navigating gender-inclusive resettlement : the experience of the Song Bung 4 hydropower project in Vietnam / / Asian Development Bank |
Pubbl/distr/stampa | Metro Manila, Philippines : , : Asian Development Bank, , 2014 |
Descrizione fisica | 1 online resource (64 p.) |
Disciplina | 627.82 |
Soggetto topico |
Dams - Social aspects - Vietnam
Forced migration - Social aspects - Vietnam Water resources development - Social aspects - Vietnam Hydroelectric power plants - Vietnam |
ISBN | 92-9254-818-2 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Cover; CONTENTS; LIST OF TABLES AND FIGURES; TABLES; 1 Demographic Distribution of Song Bung 4 Hydropower Project Affected Persons; 2 Joint Bank Accounts for Song Bung 4 Hydropower Project Affected Persons; 3 Separate Bank Accounts for Song Bung 4 Hydropower Project Affected Persons; 4 Antenatal Checks and Birth Deliveries at Medical Facilities; 5 Sex-Disaggregated Song Bung 4 Hydropower Project Staffing Statistics; FIGURES; 1 Resettlement-Related Project Documents; 2 Map of Song Bung 4 Hydropower Project Area; 3 Flow Diagram of Song Bung 4 Hydropower Project Participatory Stages
ACKNOWLEDGMENTSABBREVIATIONS; CURRENCY EQUIVALENTS; I. BACKGROUND AND INTRODUCTION; A. Overview of the Song Bung 4 Hydropower Project; B. The Importance of Gender-Responsive Resettlement Approaches; C. Background: Song Bung 4 Hydropower Project Affected People; D. Prevailing Gender Issues and Situation of Co Tu Minority Women; E. Project Resettlement and Ethnic Minority Development Plan; F. Complementary Japan Fund for Poverty Reduction Grant; G. Project Gender Action Plan; H. Schedule of Physical Relocation and Resettlement; II. GENDER-RESPONSIVE PARTICIPATORY APPROACHES A. Women's Voices Heard and Agreement Obtained in Resettlement ConsultationsB. Women Selected and Planned Their Resettlement Sites; C. Women In.uenced Infrastructure Design, Monitored Site Construction, and Contributed to Infrastructure Maintenance; D. Women's Participation Is Being Sustained beyond the Resettlement Process; III. GENDER-RELATED RESETTLEMENT BENEFITS; A. Women Have Equal Entitlements to Compensation; B. Women Have Direct Channels to Redress Compensation Grievances; C. Safeguarding Women's Finances D. Women Enjoy Improved Mobility, Access to Services, and Better Living ConditionsE. Women's Skills and Capacity Developed; F. Women's Solidarity, Leadership, and Networking Strengthened; G. Women Acquire Higher Status and Command More Respect; IV. MITIGATING EMERGING SOCIAL RISKS AND MANAGING NEGATIVE POTENTIAL IMPACTS; A. Labor Rights and Associated Social Risks; B. Maintaining Social Cohesion; C. Sustainability and Maintenance of Infrastructure; D. Maintaining Motivation for Livelihood Restoration and Financial Management; E. Protecting the Most Vulnerable; F. Addressing Road Safety V. CAPACITY BUILDING OF EXECUTING AND IMPLEMENTING AGENCIESA. Song Bung 4 Hydropower Project Management Board; B. Agribank Nam Giang District Branch; VI. CONCLUSION; APPENDIXES; 1 List of Persons Met; 2 Education Data by Resettlement Site; 3 Sex-Disaggregated Livelihood Training Data |
Record Nr. | UNINA-9910819905603321 |
Metro Manila, Philippines : , : Asian Development Bank, , 2014 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
Rock-filled concrete dam / / Feng Jin, Duruo Huang |
Autore | Jin Feng |
Pubbl/distr/stampa | Singapore : , : Springer, , [2022] |
Descrizione fisica | 1 online resource (331 pages) |
Disciplina | 627.82 |
Collana | Hydroscience and Engineering |
Soggetto topico |
Concrete dams - Design and construction
Hydraulic engineering |
ISBN |
981-16-8297-6
981-16-8298-4 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Record Nr. | UNINA-9910743235603321 |
Jin Feng | ||
Singapore : , : Springer, , [2022] | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
Seismic performance analysis of concrete gravity dams / / Gaohui Wang, Wenbo Lu, Sherong Zhang |
Autore | Wang Gaohui |
Edizione | [1st ed. 2021.] |
Pubbl/distr/stampa | Singapore : , : Springer Singapore : , : Imprint : Springer, , 2021 |
Descrizione fisica | 1 online resource (XVIII, 268 p.) : 166 illus., 127 illus. in color |
Disciplina | 627.82 |
Collana | Advanced Topics in Science and Technology in China |
Soggetto topico |
Concrete dams - Earthquake effects
Gravity dams |
ISBN | 981-15-6194-X |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto | Introduction -- Comparative analysis of nonlinear seismic response of concrete gravity dams using XFEM and CDP model -- Seismic cracking analysis of concrete gravity dams with initial cracks using XFEM -- Seismic potential failure mode analysis of concrete gravity dam–water–foundation systems through incremental dynamic analysis -- Correlation between single component durations and damage measures of concrete gravity dams -- Integrated duration effects on seismic performance of concrete gravity dams -- Damage demand assessment of concrete gravity dams subjected to mainshock-aftershock seismic sequences -- Earthquake direction effects on nonlinear dynamic response of concrete gravity dams to seismic sequences -- Seismic performance evaluation of dam-reservoir-foundation systems to near-fault ground motions -- Deterministic 3D seismic damage analysis of Guandi concrete gravity dam: A case study. |
Record Nr. | UNINA-9910484228703321 |
Wang Gaohui | ||
Singapore : , : Springer Singapore : , : Imprint : Springer, , 2021 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
Studio sulle linee isostatiche nelle grandi dighe di muratura a profilo triangolare / Giuseppe Campanella |
Autore | Campanella, Giuseppe |
Pubbl/distr/stampa | Napoli : N. Jovene, 1911 |
Descrizione fisica | 10 p. ; 24 cm |
Disciplina | 627.82 |
Soggetto non controllato | Dighe in muratura - Calcolo |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | ita |
Record Nr. | UNINA-990000079960403321 |
Campanella, Giuseppe | ||
Napoli : N. Jovene, 1911 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|