Case Studies in the Virtual Physical Chemistry Laboratory / / by Anthony J. Duben |
Autore | Duben Anthony J. |
Edizione | [1st ed. 2024.] |
Pubbl/distr/stampa | Cham : , : Springer International Publishing : , : Imprint : Springer, , 2024 |
Descrizione fisica | 1 online resource (XVII, 184 p. 97 illus., 26 illus. in color.) |
Disciplina | 542.0289 |
Collana | Physical Chemistry in Action |
Soggetto topico |
Physical chemistry
Thermodynamics Chemical kinetics Spectrum analysis Sampling (Statistics) Physical Chemistry Reaction Kinetics Spectroscopy Methodology of Data Collection and Processing |
ISBN | 3-031-55018-8 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto | Introduction -- Critical Properties and Real Gases -- Thermochemistry -- Phase Equilibria -- Reaction Equilibria -- Electrolyte Solutions -- Activity Coefficients -- Chemical Kinetics. |
Record Nr. | UNINA-9910852998703321 |
Duben Anthony J. | ||
Cham : , : Springer International Publishing : , : Imprint : Springer, , 2024 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
Handbook for process safety in laboratories and pilot plants : a risk-based approach / / American Institute of Chemical Engineers, issuing body |
Edizione | [First edition.] |
Pubbl/distr/stampa | Hoboken, N.J. : , : John Wiley & Sons, Inc., , [2023] |
Descrizione fisica | 1 online resource (557 pages) |
Disciplina | 542.0289 |
Collana | CCPS handbook |
Soggetto topico | Chemical laboratories - Safety measures |
ISBN |
1-5231-5726-7
1-119-69338-1 1-119-69337-3 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Cover -- Title Page -- Copyright -- Table of Contents -- List of Figures -- List of Tables -- Abbreviations and Acronyms -- Glossary -- Acknowledgments -- Dedication -- Online Materials Accompanying this Handbook -- Preface -- Part 1 - Introduction and Overview -- 1 Purpose and Scope -- 1.1 Purpose -- 1.2 Scope of Book and Target Audience -- 1.3 Terms for Laboratories and Pilot Plants -- 1.4 Distinctions between Laboratories and Pilot Plants -- 1.5 Organization of This Handbook -- 2 Managing Risk to Prevent Incidents -- 2.1 Some LAPP Characteristics -- 2.2 Safety in Laboratories and Pilot Plants -- 2.3 Where to Start with a Risk-based Approach in the LAPP -- 2.4 Gain Leadership Support to Implement Risk Based Process Safety -- 2.5 Laboratory Safety Management System Considerations -- 2.6 Resources for Risk Based Process Safety Management System -- 3 Leaks and Spills in the LAPP -- 3.1 Leaks of Hazardous Materials -- 3.2 Spills of Hazardous Materials -- Part 2 - Committing to Process Safety -- 4 LAPP Risk Management Concepts -- 4.1 Occupational Safety and Process Safety -- 4.2 Hierarchy of Controls -- 4.3 Inherently Safer Design (ISD) -- 4.4 Basic Risk Concepts -- 4.5 A Risk Management Program -- 4.6 Anatomy of an Incident -- 4.7 Preventive and Mitigative Safeguards -- 4.8 Applying a Risk-Based Approach in a LAPP -- 5 Process Safety Culture in the LAPP -- 5.1 RBPS Element 1: Process Safety Culture -- 5.2 Leaders' Responsibilities for Positive Safety Culture -- 5.3 Resources and Examples for Process Safety Culture -- 6 Standards for the LAPP -- 6.1 RBPS Element 2: Compliance with Standards -- 6.2 Risk Management Focus -- 6.3 Different Codes and Standards When Scaling Up from Laboratory to Pilot Plant -- 6.4 Jurisdictional Requirements -- 6.5 Resources for Compliance with Standards -- 7 Process Safety Competency and Training in the LAPP.
7.1 RBPS Element 3: Process Safety Competency -- 7.2 RBPS Element 12: Training and Performance Assurance -- 8 Workforce Involvement and Stakeholder Outreach in the LAPP -- 8.1 RBPS Element 4: Workforce Involvement -- 8.2 RBPS Element 5: Stakeholder Outreach -- Part 3 - Understanding Hazards and Risks -- 9 Process Safety Knowledge Management in the LAPP -- 9.1 RBPS Element 6: Process Knowledge Management -- 9.2 Overview of Information and Data Needs -- 9.3 Sources of Information and Data -- 9.4 Process Safety Information during Scale-up -- 10 Types of Hazards -- 10.1 Reactive Chemistry Hazards -- 10.2 Toxicity Hazards -- 10.3 Flammability and Combustibility Hazards -- 10.4 Temperature Hazards -- 10.5 Overpressure Hazards -- 10.6 Other Common LAPP Hazards -- 11 Hazard Identification and Risk Analysis (HIRA) in the LAPP -- 11.1 RBPS Element 7: Hazard Identification and Risk Analysis -- 11.2 HIRA Team Members -- 11.3 HIRA Approaches Used in LAPPs -- 11.4 Qualitative versus Quantitative Analysis of Risks in LAPPs -- 11.5 ACS Hazard Analysis Tools -- 11.6 Evaluating the Effort Level for HIRAs -- 11.7 Determining the Extent of the HIRAs -- Part 4 - Managing Risk: Engineered Controls -- 12 Spill and Leak Protection -- 12.1 Containment -- 12.2 Flexible hose and tubing -- 13 Fire and Over-Temperature Protection -- 13.1 Fire Prevention -- 13.2 Fire Mitigation -- 13.3 Over-Temperature Protection -- 14 Overpressure Prevention and Protection -- 14.1 Pressure Protection for Equipment -- 14.2 Pressure and Vacuum Relief for Atmospheric Pressure Vessels -- 14.3 Process Conditions/Situations to Consider in Pressure Relief Device Design -- 14.4 Blast Containment Cells and Pressure Relief for Building Areas -- 14.5 Venting Location and Downstream Treatment of Material Vented -- 15 Ventilation Controls -- 15.1 Ventilation Systems -- 15.2 Laboratory Chemical Fume Hoods. 15.3 Pilot Plant Ventilation -- 15.4 Permanent Total Enclosures for Containment in the LAPP -- 16 Automated Shut-down Systems -- 16.1 Selection and Design Based on Hazard Identification and Risk Analysis -- 16.2 Basic Control Systems and Safety Shut-down Systems -- 16.3 Independent Automated Safety Shut-down Systems -- 16.4 Fail-Safe Design Considerations -- 16.5 Important Design Features for Control Systems -- 16.6 Control of Changes and Maintenance for Engineered Safeguards -- 16.7 Additional References -- 17 Engineered Controls for Common Hazards -- 17.1 Cryogenic Fluids and Compressed Gases -- 17.2 Cryogenic Fluids and Compressed Gas Cylinders -- 17.3 Glass Equipment -- 17.4 Gloveboxes -- Part 5 - Managing Risk: Administrative Controls -- 18 Administrative Fire and Explosion Safeguards -- 18.1 Standards and Guidance for Fire Prevention -- 18.2 Ignition Source Control: Procedures -- 18.3 Manual Fire Suppression -- 19 Administrative Safeguards for Hazards in LAPPs -- 19.1 Good Practices for Compressed Gas and Cryogenic Cylinders -- 19.2 Regulations and Standards for Compressed Gases and Cryogenic Fluids -- 19.3 Procedures and Best Practices for Compressed Gases -- 19.4 Good Practices for Storage, Movement, and Use of Cryogenic Fluids -- 19.5 Good Practices For Handling Glass -- 19.6 Administrative Controls for Reactive Hazards -- Part 6 - Managing Risk: RBPS Management Systems -- 20 Operating Procedures and Conduct of Operations in the LAPP -- 20.1 RBPS Element 8: LAPP Operating Procedures -- 20.2 RBPS Element 15: Conduct of Operations -- 21 Safe Work Practices and Contractor Management in the LAPP -- 21.1 RBPS Element 9: Safe Work Practices -- 21.2 RBPS Element 11: Contractor Management -- 22 Asset Integrity and Reliability in the LAPP -- 22.1 RBPS Element 10: Asset Integrity and Reliability. 22.2 A Management Approach for Assuring Asset Integrity and Reliability -- 22.3 Examples of Asset Integrity and Reliability Management System Failures -- 22.4 Glass Equipment-Asset Integrity and Reliability Challenge for LAPPs -- 23 Management of Change (MOC) and Operational Readiness in the LAPP -- 23.1 RBPS Element 13: Management of Change -- 23.2 RBPS Element 14: Operational Readiness -- 24 Emergency Management in the LAPP -- 24.1 RBPS Element 16: Emergency Management -- 24.2 Emergency Planning -- 24.3 Implementing an Emergency Management Plan -- 24.4 Emergency Equipment -- 24.5 Training and Drills -- 24.6 Deficiencies in Emergency Planning and Response in LAPP Cases -- 24.7 Controlling Unattended Experimental Work and Working Alone in LAPPs -- Part 7 - Learning from Experience -- 25 Investigating Incidents -- 25.1 Incident Terminology -- 25.2 RBPS Element 17: Incident Investigation -- 25.3 Steps of an Incident Investigation -- 25.4 Ensure Lessons Are Learned and Remembered -- 25.5 Learn from Experience of Others -- 26 Metrics, Auditing, and Management Review in the LAPP -- 26.1 RBPS Element 18: Measurement and Metrics -- 26.2 RBPS Element 19: Auditing -- 26.3 RBPS Element 20: Management Review and Continuous Improvement -- Part 8 - Conclusion -- References -- Appendix A Cases -- Appendix B Examples -- Appendix C Control Banding Strategies -- Appendix D Glass Equipment Design -- Index -- EULA. |
Record Nr. | UNINA-9910830088403321 |
Hoboken, N.J. : , : John Wiley & Sons, Inc., , [2023] | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
Improving safety in the chemical laboratory : a practical guide / edited by Jay A. Young |
Edizione | [2. ed] |
Pubbl/distr/stampa | New York [etc.] : Wiley, 1991 |
Descrizione fisica | XXII, 406 p. ; 24 cm. |
Disciplina | 542.0289 |
Soggetto topico | Laboratori chimici - Sicurezza |
ISBN | 0-471-53036-0 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Record Nr. | UNIBAS-000033699 |
New York [etc.] : Wiley, 1991 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. della Basilicata | ||
|
Improving safety in the chemical laboratory : a practical guide / edited by Jay A. Young |
Edizione | [2. ed] |
Pubbl/distr/stampa | New York [etc.], : Wiley, 1991 |
Descrizione fisica | XXII, 406 p. ; 24 cm. |
Disciplina | 542.0289 |
Soggetto topico | Laboratori chimici - Sicurezza |
ISBN | 0471530360 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Record Nr. | UNIBAS-BUN0033625 |
New York [etc.], : Wiley, 1991 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. della Basilicata | ||
|