top

  Info

  • Utilizzare la checkbox di selezione a fianco di ciascun documento per attivare le funzionalità di stampa, invio email, download nei formati disponibili del (i) record.

  Info

  • Utilizzare questo link per rimuovere la selezione effettuata.
CDM regulations 2007 [[electronic resource] ] : procedures manual / / Stuart D. Summerhayes
CDM regulations 2007 [[electronic resource] ] : procedures manual / / Stuart D. Summerhayes
Autore Summerhayes Stuart
Edizione [3rd ed., Rev.]
Pubbl/distr/stampa Oxford, UK ; ; Malden, MA, : Blackwell Pub., 2008
Descrizione fisica 1 online resource (203 p.)
Disciplina 343.41/078624
363.119624
Soggetto topico Construction industry - Safety regulations - Great Britain
Industrial safety - Great Britain
ISBN 1-282-00933-8
9786612009334
1-4443-0255-8
1-4443-0256-6
Formato Materiale a stampa
Livello bibliografico Monografia
Lingua di pubblicazione eng
Nota di contenuto Contents; HOW THIS MANUAL WORKS; Section 1: INTRODUCTION; Section 2: APPLICATION AND INTERPRETATION; 2.1 Application; Table 2.1 THE MAIN RESPONSIBILITIES OF DUTY HOLDERS; 2.2 Interpretation; 2.3 Additional exclusions; Section 3: ALL DUTY HOLDERS; 3.1 Introduction; Table 3.1 PROJECT MANAGEMENT DESCRIPTORS FOUND IN THE REGULATIONS; Figure 3.1 HOLISTIC DIAGRAM; Section 4: THE CLIENT; 4.1 CLIENT FLOWCHART: ALL PROJECTS; 4.2 CLIENT FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; 4.3: CLIENT CHECKLIST; 4.4: CLIENT CHECKLIST: NOTIFIABLE PROJECTS; Section 5: THE DESIGNER; 5.1 Introduction
Figure 5.1 REGULATIONS TO BE DISCHARGED BY DESIGNERS5.2 All projects; 5.3 Identification; 5.4 Evaluation; 5.5 Contribution; 5.6 Design change; Figure 5.2 SYSTEMS APPROACH FOR THE DESIGNER; 5.1 DESIGNER FLOWCHART: ALL PROJECTS; 5.2 DESIGNER FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; 5.3 DESIGNER CHECKLIST: ALL PROJECTS; 5.4 DESIGNER CHECKLIST: ADDITIONAL DUTIES FOR NOTIFIABLE PROJECTS; Section 6: THE CONTRACTOR; Figure 6.1 CONTRACTOR DUTIES: ALL PROJECTS; 6.1 CONTRACTOR FLOWCHART: ALL PROJECTS; Figure 6.2 CONTRACTOR: ADDITIONAL DUTIES ON NOTIFIABLE PROJECTS
6.2 CONTRACTOR FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES6.3 CONTRACTOR CHECKLIST: ALL PROJECTS; 6.4 CONTRACTOR CHECKLIST: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; Section 7: THE CDM CO-ORDINATOR; 7.1 Introduction; 7.2 Appointment; Figure 7.1 CDM CO-ORDINATION DUTIES; 7.1 CDM CO-ORDINATOR FLOWCHART; 7.2 CDM CO-ORDINATOR CHECKLIST; Section 8: THE PRINCIPAL CONTRACTOR; Figure 8.1 REGULATIONS TO BE DISCHARGED BY PRINCIPAL CONTRACTOR; 8.1 PRINCIPAL CONTRACTOR FLOWCHART; 8.2 PRINCIPAL CONTRACTOR CHECKLIST; Section 9: DOCUMENTATION; 9.1 Introduction; 9.2 Pre-construction information
Figure 9.1 FLOW OF PRE-CONSTRUCTION INFORMATION9.3 Construction phase plan; 9.4 Health and safety file; 9.5 Project risk register; 9.1 PROJECT RISK REGISTER (HEALTH AND SAFETY); Section 10: CHECKLISTS AND AGENDAS; 10.1 CHECKLIST FOR NON-NOTIFIABLE PROJECTS; 10.2 CHECKLIST OF ADDITIONAL DUTIES FOR NOTIFIABLE PROJECTS; 10.3 INITIAL DESIGN/CLIENT MEETING: PROMPT LIST; 10.4 PRE-START MEETING: PROMPT LIST (NON NOTIFIABLE PROJECTS); 10.5 PRE-START MEETINGS: PROMPT LIST (NOTIFIABLE PROJECTS) AND ADDITIONAL POINTS; 10.6 PROGRESS MEETING: PROMPT LIST; Section 11: COMPETENCE; WEB PAGE DIRECTORY
BibliographyINDEX
Record Nr. UNINA-9910145834403321
Summerhayes Stuart  
Oxford, UK ; ; Malden, MA, : Blackwell Pub., 2008
Materiale a stampa
Lo trovi qui: Univ. Federico II
Opac: Controlla la disponibilità qui
CDM regulations 2007 [[electronic resource] ] : procedures manual / / Stuart D. Summerhayes
CDM regulations 2007 [[electronic resource] ] : procedures manual / / Stuart D. Summerhayes
Autore Summerhayes Stuart
Edizione [3rd ed., Rev.]
Pubbl/distr/stampa Oxford, UK ; ; Malden, MA, : Blackwell Pub., 2008
Descrizione fisica 1 online resource (203 p.)
Disciplina 343.41/078624
363.119624
Soggetto topico Construction industry - Safety regulations - Great Britain
Industrial safety - Great Britain
ISBN 1-282-00933-8
9786612009334
1-4443-0255-8
1-4443-0256-6
Formato Materiale a stampa
Livello bibliografico Monografia
Lingua di pubblicazione eng
Nota di contenuto Contents; HOW THIS MANUAL WORKS; Section 1: INTRODUCTION; Section 2: APPLICATION AND INTERPRETATION; 2.1 Application; Table 2.1 THE MAIN RESPONSIBILITIES OF DUTY HOLDERS; 2.2 Interpretation; 2.3 Additional exclusions; Section 3: ALL DUTY HOLDERS; 3.1 Introduction; Table 3.1 PROJECT MANAGEMENT DESCRIPTORS FOUND IN THE REGULATIONS; Figure 3.1 HOLISTIC DIAGRAM; Section 4: THE CLIENT; 4.1 CLIENT FLOWCHART: ALL PROJECTS; 4.2 CLIENT FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; 4.3: CLIENT CHECKLIST; 4.4: CLIENT CHECKLIST: NOTIFIABLE PROJECTS; Section 5: THE DESIGNER; 5.1 Introduction
Figure 5.1 REGULATIONS TO BE DISCHARGED BY DESIGNERS5.2 All projects; 5.3 Identification; 5.4 Evaluation; 5.5 Contribution; 5.6 Design change; Figure 5.2 SYSTEMS APPROACH FOR THE DESIGNER; 5.1 DESIGNER FLOWCHART: ALL PROJECTS; 5.2 DESIGNER FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; 5.3 DESIGNER CHECKLIST: ALL PROJECTS; 5.4 DESIGNER CHECKLIST: ADDITIONAL DUTIES FOR NOTIFIABLE PROJECTS; Section 6: THE CONTRACTOR; Figure 6.1 CONTRACTOR DUTIES: ALL PROJECTS; 6.1 CONTRACTOR FLOWCHART: ALL PROJECTS; Figure 6.2 CONTRACTOR: ADDITIONAL DUTIES ON NOTIFIABLE PROJECTS
6.2 CONTRACTOR FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES6.3 CONTRACTOR CHECKLIST: ALL PROJECTS; 6.4 CONTRACTOR CHECKLIST: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; Section 7: THE CDM CO-ORDINATOR; 7.1 Introduction; 7.2 Appointment; Figure 7.1 CDM CO-ORDINATION DUTIES; 7.1 CDM CO-ORDINATOR FLOWCHART; 7.2 CDM CO-ORDINATOR CHECKLIST; Section 8: THE PRINCIPAL CONTRACTOR; Figure 8.1 REGULATIONS TO BE DISCHARGED BY PRINCIPAL CONTRACTOR; 8.1 PRINCIPAL CONTRACTOR FLOWCHART; 8.2 PRINCIPAL CONTRACTOR CHECKLIST; Section 9: DOCUMENTATION; 9.1 Introduction; 9.2 Pre-construction information
Figure 9.1 FLOW OF PRE-CONSTRUCTION INFORMATION9.3 Construction phase plan; 9.4 Health and safety file; 9.5 Project risk register; 9.1 PROJECT RISK REGISTER (HEALTH AND SAFETY); Section 10: CHECKLISTS AND AGENDAS; 10.1 CHECKLIST FOR NON-NOTIFIABLE PROJECTS; 10.2 CHECKLIST OF ADDITIONAL DUTIES FOR NOTIFIABLE PROJECTS; 10.3 INITIAL DESIGN/CLIENT MEETING: PROMPT LIST; 10.4 PRE-START MEETING: PROMPT LIST (NON NOTIFIABLE PROJECTS); 10.5 PRE-START MEETINGS: PROMPT LIST (NOTIFIABLE PROJECTS) AND ADDITIONAL POINTS; 10.6 PROGRESS MEETING: PROMPT LIST; Section 11: COMPETENCE; WEB PAGE DIRECTORY
BibliographyINDEX
Record Nr. UNISA-996208657803316
Summerhayes Stuart  
Oxford, UK ; ; Malden, MA, : Blackwell Pub., 2008
Materiale a stampa
Lo trovi qui: Univ. di Salerno
Opac: Controlla la disponibilità qui
CDM regulations 2007 : procedures manual / / Stuart D. Summerhayes
CDM regulations 2007 : procedures manual / / Stuart D. Summerhayes
Autore Summerhayes Stuart
Edizione [3rd ed., Rev.]
Pubbl/distr/stampa Oxford, UK ; ; Malden, MA, : Blackwell Pub., 2008
Descrizione fisica 1 online resource (203 p.)
Disciplina 343.41/078624
363.119624
Soggetto topico Construction industry - Safety regulations - Great Britain
Industrial safety - Great Britain
ISBN 1-282-00933-8
9786612009334
1-4443-0255-8
1-4443-0256-6
Formato Materiale a stampa
Livello bibliografico Monografia
Lingua di pubblicazione eng
Nota di contenuto Contents; HOW THIS MANUAL WORKS; Section 1: INTRODUCTION; Section 2: APPLICATION AND INTERPRETATION; 2.1 Application; Table 2.1 THE MAIN RESPONSIBILITIES OF DUTY HOLDERS; 2.2 Interpretation; 2.3 Additional exclusions; Section 3: ALL DUTY HOLDERS; 3.1 Introduction; Table 3.1 PROJECT MANAGEMENT DESCRIPTORS FOUND IN THE REGULATIONS; Figure 3.1 HOLISTIC DIAGRAM; Section 4: THE CLIENT; 4.1 CLIENT FLOWCHART: ALL PROJECTS; 4.2 CLIENT FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; 4.3: CLIENT CHECKLIST; 4.4: CLIENT CHECKLIST: NOTIFIABLE PROJECTS; Section 5: THE DESIGNER; 5.1 Introduction
Figure 5.1 REGULATIONS TO BE DISCHARGED BY DESIGNERS5.2 All projects; 5.3 Identification; 5.4 Evaluation; 5.5 Contribution; 5.6 Design change; Figure 5.2 SYSTEMS APPROACH FOR THE DESIGNER; 5.1 DESIGNER FLOWCHART: ALL PROJECTS; 5.2 DESIGNER FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; 5.3 DESIGNER CHECKLIST: ALL PROJECTS; 5.4 DESIGNER CHECKLIST: ADDITIONAL DUTIES FOR NOTIFIABLE PROJECTS; Section 6: THE CONTRACTOR; Figure 6.1 CONTRACTOR DUTIES: ALL PROJECTS; 6.1 CONTRACTOR FLOWCHART: ALL PROJECTS; Figure 6.2 CONTRACTOR: ADDITIONAL DUTIES ON NOTIFIABLE PROJECTS
6.2 CONTRACTOR FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES6.3 CONTRACTOR CHECKLIST: ALL PROJECTS; 6.4 CONTRACTOR CHECKLIST: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; Section 7: THE CDM CO-ORDINATOR; 7.1 Introduction; 7.2 Appointment; Figure 7.1 CDM CO-ORDINATION DUTIES; 7.1 CDM CO-ORDINATOR FLOWCHART; 7.2 CDM CO-ORDINATOR CHECKLIST; Section 8: THE PRINCIPAL CONTRACTOR; Figure 8.1 REGULATIONS TO BE DISCHARGED BY PRINCIPAL CONTRACTOR; 8.1 PRINCIPAL CONTRACTOR FLOWCHART; 8.2 PRINCIPAL CONTRACTOR CHECKLIST; Section 9: DOCUMENTATION; 9.1 Introduction; 9.2 Pre-construction information
Figure 9.1 FLOW OF PRE-CONSTRUCTION INFORMATION9.3 Construction phase plan; 9.4 Health and safety file; 9.5 Project risk register; 9.1 PROJECT RISK REGISTER (HEALTH AND SAFETY); Section 10: CHECKLISTS AND AGENDAS; 10.1 CHECKLIST FOR NON-NOTIFIABLE PROJECTS; 10.2 CHECKLIST OF ADDITIONAL DUTIES FOR NOTIFIABLE PROJECTS; 10.3 INITIAL DESIGN/CLIENT MEETING: PROMPT LIST; 10.4 PRE-START MEETING: PROMPT LIST (NON NOTIFIABLE PROJECTS); 10.5 PRE-START MEETINGS: PROMPT LIST (NOTIFIABLE PROJECTS) AND ADDITIONAL POINTS; 10.6 PROGRESS MEETING: PROMPT LIST; Section 11: COMPETENCE; WEB PAGE DIRECTORY
BibliographyINDEX
Record Nr. UNINA-9910827995303321
Summerhayes Stuart  
Oxford, UK ; ; Malden, MA, : Blackwell Pub., 2008
Materiale a stampa
Lo trovi qui: Univ. Federico II
Opac: Controlla la disponibilità qui
Design risk management [[electronic resource] ] : contribution to health and safety / / Stuart D. Summerhayes
Design risk management [[electronic resource] ] : contribution to health and safety / / Stuart D. Summerhayes
Autore Summerhayes Stuart
Pubbl/distr/stampa Chichester, West Sussex, U.K. ; ; Ames, Iowa, : Blackwell, c2010
Descrizione fisica 1 online resource (176 p.)
Disciplina 363.119624
690/.22
Soggetto topico Construction industry - Safety measures
Safety factor in engineering
Architecture - Human factors
Soggetto genere / forma Electronic books.
ISBN 1-282-68446-9
9786612684463
1-61344-920-8
1-4443-1889-6
1-4443-1890-X
Formato Materiale a stampa
Livello bibliografico Monografia
Lingua di pubblicazione eng
Nota di contenuto Design Risk Management Contribution to Health and Safety; Contents; Section 1: INTRODUCTION; Table 1.1: DESIGN FAILURES; 1.1 Major design failures in British history; 1.2 Additional Reports (The Bragg Report and HSE Research Report 218) into design failure; Table 1.2: PRINCIPAL RECOMMENDATIONS OF THE BRAGG COMMITTEE; Table 1.3: CONTRIBUTORY FACTORS TO HISTORICAL FAILURES; Section 2: PROJECT RISK MANAGEMENT AND DESIGN RISK MANAGEMENT; 2.1 Key players in project management; 2.2 Stages of the contract and their achievement; Table 2.1: CDM DUTY HOLDER ACTIONS
Section 3: CONSTRUCTION-RELATED HEALTH AND SAFETY LEGISLATION3.1 Approved code of practice and guidance; 3.2 Health and Safety at Work, etc. Act 1974; 3.3 The Management of Health and Safety at Work Regulations 1999; 3.4 The Workplace (Health, Safety and Welfare) Regulations 1992; 3.5 The Manual Handling Operations Regulations 1992; 3.6 The Confined Spaces Regulations 1997; 3.7 The Work at Height Regulations 2005; 3.8 The Control of Vibration at Work Regulations 2005; 3.9 The Control of Noise at Work Regulations 2005
3.10 The Control of Substances Hazardous to Health Regulations (amended 2005)Section 4: THE CDM PROCESS; 4.1 Timing; 4.2 Pre-construction information; Figure 4.1: HOLISTIC DIAGRAM OF THE CONSTRUCTION PROCESS; 4.3 Construction phase plan; 4.4 Health and safety file; Figure 4.2: SYSTEMS APPROACH; Table 4.1: APPLICABLE REGULATIONS FOR DUTY HOLDER COMPLIANCE; Table 4.2: CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2007; Section 5: ROLE OF THE DESIGNER; 5.1 Who are designers?; Figure 5.1: THE DESIGNER'S DUTIES; Table 5.1a: DESIGNER DUTIES (ALL PROJECTS)
Table 5.1b: DESIGNER DUTIES (ADDITIONAL DUTIES ON NOTIFIABLE PROJECTS)Section 6: THE DESIGN RISK MANAGEMENT PROCESS; 6.1 Additional interfaces; 6.2 Design change; Section 7: DOCUMENTATION; Table 7.1: RISK ASSESSMENT METHODS; Table 7.2: EXAMPLES OF POTENTIAL HAZARDS FOR DESIGNERS TO CONSIDER; 7.1 Red, amber and green lists; Table 7.3: DESIGN RISK ASSESSMENT; Figure 7.1: EXAMPLE OF A DESIGN RISK ASSESSMENT PROFORMA; Figure 7.2: ANNOTATED NOTES (HEALTH AND SAFETY) ON DRAWING; Figure 7.3: HAZARD MANAGEMENT REGISTER AND DESIGN RISK ASSESSMENT; 7.2 Project (health and safety) risk register
Table 7.4: PROJECT RISK REGISTER (HEALTH AND SAFETY)7.3 Design philosophy statements; Section 8: INFORMATION FLOW; Table 8.1: COMMUNICATION LINKS; 8.1 Pre-construction information; Figure 8.1: INFORMATION FLOW; Figure 8.2: DESIGN INTERFACE WITH OTHER DUTY HOLDERS; 8.2 Construction phase plan; 8.3 Health and safety file; Table 8.2: DESIGN INFORMATION FOR THE HEALTH AND SAFETY FILE; Figure 8.3: PLANNING/PROGRAMMING INTEGRATION; Appendix One: ROADMAP; Appendix Two: REFERENCES AND BIBLIOGRAPHY; Appendix Three: WEB PAGE DIRECTORY
Appendix Four: WORKPLACE (HEALTH, SAFETY AND WELFARE) REGULATIONS 1992
Record Nr. UNINA-9910139362103321
Summerhayes Stuart  
Chichester, West Sussex, U.K. ; ; Ames, Iowa, : Blackwell, c2010
Materiale a stampa
Lo trovi qui: Univ. Federico II
Opac: Controlla la disponibilità qui
Design risk management [[electronic resource] ] : contribution to health and safety / / Stuart D. Summerhayes
Design risk management [[electronic resource] ] : contribution to health and safety / / Stuart D. Summerhayes
Autore Summerhayes Stuart
Pubbl/distr/stampa Chichester, West Sussex, U.K. ; ; Ames, Iowa, : Blackwell, c2010
Descrizione fisica 1 online resource (176 p.)
Disciplina 363.119624
690/.22
Soggetto topico Construction industry - Safety measures
Safety factor in engineering
Architecture - Human factors
ISBN 1-282-68446-9
9786612684463
1-61344-920-8
1-4443-1889-6
1-4443-1890-X
Formato Materiale a stampa
Livello bibliografico Monografia
Lingua di pubblicazione eng
Nota di contenuto Design Risk Management Contribution to Health and Safety; Contents; Section 1: INTRODUCTION; Table 1.1: DESIGN FAILURES; 1.1 Major design failures in British history; 1.2 Additional Reports (The Bragg Report and HSE Research Report 218) into design failure; Table 1.2: PRINCIPAL RECOMMENDATIONS OF THE BRAGG COMMITTEE; Table 1.3: CONTRIBUTORY FACTORS TO HISTORICAL FAILURES; Section 2: PROJECT RISK MANAGEMENT AND DESIGN RISK MANAGEMENT; 2.1 Key players in project management; 2.2 Stages of the contract and their achievement; Table 2.1: CDM DUTY HOLDER ACTIONS
Section 3: CONSTRUCTION-RELATED HEALTH AND SAFETY LEGISLATION3.1 Approved code of practice and guidance; 3.2 Health and Safety at Work, etc. Act 1974; 3.3 The Management of Health and Safety at Work Regulations 1999; 3.4 The Workplace (Health, Safety and Welfare) Regulations 1992; 3.5 The Manual Handling Operations Regulations 1992; 3.6 The Confined Spaces Regulations 1997; 3.7 The Work at Height Regulations 2005; 3.8 The Control of Vibration at Work Regulations 2005; 3.9 The Control of Noise at Work Regulations 2005
3.10 The Control of Substances Hazardous to Health Regulations (amended 2005)Section 4: THE CDM PROCESS; 4.1 Timing; 4.2 Pre-construction information; Figure 4.1: HOLISTIC DIAGRAM OF THE CONSTRUCTION PROCESS; 4.3 Construction phase plan; 4.4 Health and safety file; Figure 4.2: SYSTEMS APPROACH; Table 4.1: APPLICABLE REGULATIONS FOR DUTY HOLDER COMPLIANCE; Table 4.2: CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2007; Section 5: ROLE OF THE DESIGNER; 5.1 Who are designers?; Figure 5.1: THE DESIGNER'S DUTIES; Table 5.1a: DESIGNER DUTIES (ALL PROJECTS)
Table 5.1b: DESIGNER DUTIES (ADDITIONAL DUTIES ON NOTIFIABLE PROJECTS)Section 6: THE DESIGN RISK MANAGEMENT PROCESS; 6.1 Additional interfaces; 6.2 Design change; Section 7: DOCUMENTATION; Table 7.1: RISK ASSESSMENT METHODS; Table 7.2: EXAMPLES OF POTENTIAL HAZARDS FOR DESIGNERS TO CONSIDER; 7.1 Red, amber and green lists; Table 7.3: DESIGN RISK ASSESSMENT; Figure 7.1: EXAMPLE OF A DESIGN RISK ASSESSMENT PROFORMA; Figure 7.2: ANNOTATED NOTES (HEALTH AND SAFETY) ON DRAWING; Figure 7.3: HAZARD MANAGEMENT REGISTER AND DESIGN RISK ASSESSMENT; 7.2 Project (health and safety) risk register
Table 7.4: PROJECT RISK REGISTER (HEALTH AND SAFETY)7.3 Design philosophy statements; Section 8: INFORMATION FLOW; Table 8.1: COMMUNICATION LINKS; 8.1 Pre-construction information; Figure 8.1: INFORMATION FLOW; Figure 8.2: DESIGN INTERFACE WITH OTHER DUTY HOLDERS; 8.2 Construction phase plan; 8.3 Health and safety file; Table 8.2: DESIGN INFORMATION FOR THE HEALTH AND SAFETY FILE; Figure 8.3: PLANNING/PROGRAMMING INTEGRATION; Appendix One: ROADMAP; Appendix Two: REFERENCES AND BIBLIOGRAPHY; Appendix Three: WEB PAGE DIRECTORY
Appendix Four: WORKPLACE (HEALTH, SAFETY AND WELFARE) REGULATIONS 1992
Record Nr. UNISA-996212792503316
Summerhayes Stuart  
Chichester, West Sussex, U.K. ; ; Ames, Iowa, : Blackwell, c2010
Materiale a stampa
Lo trovi qui: Univ. di Salerno
Opac: Controlla la disponibilità qui
Design risk management [[electronic resource] ] : contribution to health and safety / / Stuart D. Summerhayes
Design risk management [[electronic resource] ] : contribution to health and safety / / Stuart D. Summerhayes
Autore Summerhayes Stuart
Pubbl/distr/stampa Chichester, West Sussex, U.K. ; ; Ames, Iowa, : Blackwell, c2010
Descrizione fisica 1 online resource (176 p.)
Disciplina 363.119624
690/.22
Soggetto topico Construction industry - Safety measures
Safety factor in engineering
Architecture - Human factors
ISBN 1-282-68446-9
9786612684463
1-61344-920-8
1-4443-1889-6
1-4443-1890-X
Formato Materiale a stampa
Livello bibliografico Monografia
Lingua di pubblicazione eng
Nota di contenuto Design Risk Management Contribution to Health and Safety; Contents; Section 1: INTRODUCTION; Table 1.1: DESIGN FAILURES; 1.1 Major design failures in British history; 1.2 Additional Reports (The Bragg Report and HSE Research Report 218) into design failure; Table 1.2: PRINCIPAL RECOMMENDATIONS OF THE BRAGG COMMITTEE; Table 1.3: CONTRIBUTORY FACTORS TO HISTORICAL FAILURES; Section 2: PROJECT RISK MANAGEMENT AND DESIGN RISK MANAGEMENT; 2.1 Key players in project management; 2.2 Stages of the contract and their achievement; Table 2.1: CDM DUTY HOLDER ACTIONS
Section 3: CONSTRUCTION-RELATED HEALTH AND SAFETY LEGISLATION3.1 Approved code of practice and guidance; 3.2 Health and Safety at Work, etc. Act 1974; 3.3 The Management of Health and Safety at Work Regulations 1999; 3.4 The Workplace (Health, Safety and Welfare) Regulations 1992; 3.5 The Manual Handling Operations Regulations 1992; 3.6 The Confined Spaces Regulations 1997; 3.7 The Work at Height Regulations 2005; 3.8 The Control of Vibration at Work Regulations 2005; 3.9 The Control of Noise at Work Regulations 2005
3.10 The Control of Substances Hazardous to Health Regulations (amended 2005)Section 4: THE CDM PROCESS; 4.1 Timing; 4.2 Pre-construction information; Figure 4.1: HOLISTIC DIAGRAM OF THE CONSTRUCTION PROCESS; 4.3 Construction phase plan; 4.4 Health and safety file; Figure 4.2: SYSTEMS APPROACH; Table 4.1: APPLICABLE REGULATIONS FOR DUTY HOLDER COMPLIANCE; Table 4.2: CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2007; Section 5: ROLE OF THE DESIGNER; 5.1 Who are designers?; Figure 5.1: THE DESIGNER'S DUTIES; Table 5.1a: DESIGNER DUTIES (ALL PROJECTS)
Table 5.1b: DESIGNER DUTIES (ADDITIONAL DUTIES ON NOTIFIABLE PROJECTS)Section 6: THE DESIGN RISK MANAGEMENT PROCESS; 6.1 Additional interfaces; 6.2 Design change; Section 7: DOCUMENTATION; Table 7.1: RISK ASSESSMENT METHODS; Table 7.2: EXAMPLES OF POTENTIAL HAZARDS FOR DESIGNERS TO CONSIDER; 7.1 Red, amber and green lists; Table 7.3: DESIGN RISK ASSESSMENT; Figure 7.1: EXAMPLE OF A DESIGN RISK ASSESSMENT PROFORMA; Figure 7.2: ANNOTATED NOTES (HEALTH AND SAFETY) ON DRAWING; Figure 7.3: HAZARD MANAGEMENT REGISTER AND DESIGN RISK ASSESSMENT; 7.2 Project (health and safety) risk register
Table 7.4: PROJECT RISK REGISTER (HEALTH AND SAFETY)7.3 Design philosophy statements; Section 8: INFORMATION FLOW; Table 8.1: COMMUNICATION LINKS; 8.1 Pre-construction information; Figure 8.1: INFORMATION FLOW; Figure 8.2: DESIGN INTERFACE WITH OTHER DUTY HOLDERS; 8.2 Construction phase plan; 8.3 Health and safety file; Table 8.2: DESIGN INFORMATION FOR THE HEALTH AND SAFETY FILE; Figure 8.3: PLANNING/PROGRAMMING INTEGRATION; Appendix One: ROADMAP; Appendix Two: REFERENCES AND BIBLIOGRAPHY; Appendix Three: WEB PAGE DIRECTORY
Appendix Four: WORKPLACE (HEALTH, SAFETY AND WELFARE) REGULATIONS 1992
Record Nr. UNINA-9910829848503321
Summerhayes Stuart  
Chichester, West Sussex, U.K. ; ; Ames, Iowa, : Blackwell, c2010
Materiale a stampa
Lo trovi qui: Univ. Federico II
Opac: Controlla la disponibilità qui