Construction adjudication [[electronic resource] /] / John L. Riches and Christopher Dancaster |
Autore | Riches John L |
Edizione | [2nd ed.] |
Pubbl/distr/stampa | Oxford ; ; Malden, MA, : Blackwell Pub., c2004 |
Descrizione fisica | 1 online resource (426 p.) |
Disciplina | 343.42078624 |
Altri autori (Persone) | DancasterChristopher |
Soggetto topico |
Construction contracts - Great Britain
Arbitration and award - Great Britain |
Soggetto genere / forma | Electronic books. |
ISBN |
1-280-74323-9
9786610743230 0-470-79526-3 0-470-75908-9 1-4051-7206-1 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto | What is adjudication? -- The act : the overarching provisions -- The act : the adjudication provisions -- The act : the payment provisions -- The secondary legislation -- Adjudication clauses, rules, and procedures -- The appointment -- Adjudicators' agreements -- Jurisdiction, powers, and duties -- The process -- The decision -- Enforcement and appeals. |
Record Nr. | UNINA-9910143288403321 |
Riches John L | ||
Oxford ; ; Malden, MA, : Blackwell Pub., c2004 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
Construction adjudication [[electronic resource] /] / John L. Riches and Christopher Dancaster |
Autore | Riches John L |
Edizione | [2nd ed.] |
Pubbl/distr/stampa | Oxford ; ; Malden, MA, : Blackwell Pub., c2004 |
Descrizione fisica | 1 online resource (426 p.) |
Disciplina | 343.42078624 |
Altri autori (Persone) | DancasterChristopher |
Soggetto topico |
Construction contracts - Great Britain
Arbitration and award - Great Britain |
ISBN |
1-280-74323-9
9786610743230 0-470-79526-3 0-470-75908-9 1-4051-7206-1 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto | What is adjudication? -- The act : the overarching provisions -- The act : the adjudication provisions -- The act : the payment provisions -- The secondary legislation -- Adjudication clauses, rules, and procedures -- The appointment -- Adjudicators' agreements -- Jurisdiction, powers, and duties -- The process -- The decision -- Enforcement and appeals. |
Record Nr. | UNISA-996211217403316 |
Riches John L | ||
Oxford ; ; Malden, MA, : Blackwell Pub., c2004 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. di Salerno | ||
|
Construction adjudication [[electronic resource] /] / John L. Riches and Christopher Dancaster |
Autore | Riches John L |
Edizione | [2nd ed.] |
Pubbl/distr/stampa | Oxford ; ; Malden, MA, : Blackwell Pub., c2004 |
Descrizione fisica | 1 online resource (426 p.) |
Disciplina | 343.42078624 |
Altri autori (Persone) | DancasterChristopher |
Soggetto topico |
Construction contracts - Great Britain
Arbitration and award - Great Britain |
ISBN |
1-280-74323-9
9786610743230 0-470-79526-3 0-470-75908-9 1-4051-7206-1 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto | What is adjudication? -- The act : the overarching provisions -- The act : the adjudication provisions -- The act : the payment provisions -- The secondary legislation -- Adjudication clauses, rules, and procedures -- The appointment -- Adjudicators' agreements -- Jurisdiction, powers, and duties -- The process -- The decision -- Enforcement and appeals. |
Record Nr. | UNINA-9910829934503321 |
Riches John L | ||
Oxford ; ; Malden, MA, : Blackwell Pub., c2004 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
The JCT major project form [[electronic resource] /] / Neil F. Jones |
Autore | Jones Neil F |
Pubbl/distr/stampa | Oxford, Eng. ; ; Malden, MA, : Blackwell, 2004 |
Descrizione fisica | 1 online resource (458 p.) |
Disciplina | 343.42078624 |
Soggetto topico |
Construction contracts - Great Britain
Construction contracts - Law and legislation - England Construction contracts - Law and legislation - Wales |
ISBN |
1-281-31874-4
9786611318741 0-470-79724-X 0-470-69085-2 0-470-68056-3 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
The JCT Major Project Form; Contents; 3 Time; Commencement and completion - clause 9; Access - clause 9.1; Commencing execution of the project - clause 9.2; Use of reasonable endeavours - clause 9.3; Procedure leading to practical completion - clause 9.4; Damages for delay - clause 10; Liquidated damages - clause 10.1; Repayment - clause 10.2; Taking over parts of the project - clause 11; Summary; Comparison with sectional completion; Taking over part with consent - clause 11.1; Statement of part taken over - clause 11.2; Reduction of liquidated damages - clause 11.3; Matters not covered
IntroductionIntroductory words - clause 12.1; The events giving rise to an adjustment to the completion date; 7 Assignment and Third Party Rights; Background; Extensions of time - clause 12; Preface; Abbreviations; 1 Introduction and background; Introduction and background to the Major Project Form; The reduction in length; Who is this contract for?; Some significant features; The contract documents; The requirements; The proposals; 2 General obligations; General obligations of the contractor - clause 1; Execution and completion - clause 1.1 Contractor as planning supervisor and principal contractor -clauses 1.2 and 1.3The Construction (Design and Management) Regulations 1994; Instructions - clause 2; Compliance with instructions - clause 2.1; Instructions to be treated as not giving rise to a Change - clause 2.2; Contractor failing to comply with instruction - clause 2.3; Statutory requirements - clause 3; Compliance with statutory requirements - clause 3.1; Applications made and notices given by contractor in connection with statutory requirements; Fees and charges - clause 3.2 Civil liability for breach of 'Statutory Requirements'Conflict and discrepancy - clause 4; Introduction; Notification of discrepancies - clause 4.1; Discrepancies within the requirements - clause 4.2; Discrepancies within the proposals - clause 4.3; Discrepancies between the requirements, proposals and statutory requirements - clause 4.4; Alterations to statutory requirements after the base date - clause 4.5; Standards of design, materials and workmanship - clause 5; Background law - design - workmanship and materials; Materials and workmanship The contractor's responsibility for the requirements - clause 5.1Contractor's design warranties - clause 5.2; Contractor to use skill and care - clause 5.3; Kinds and standards of materials and goods - clause 5.4; Standards of workmanship - clause 5.5; Design submission procedure - clause 6; Introduction; Contractor to prepare the design documents - clause 6.1; Content and timing of submission of design documents - clause 6.2; Employer's response - clause 6.3; Employer not responding to a submitted design document - clause 6.4 Employer's explanation of why it considers that the design document is non-compliant - clause 6.5 |
Record Nr. | UNINA-9910145251103321 |
Jones Neil F | ||
Oxford, Eng. ; ; Malden, MA, : Blackwell, 2004 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
The JCT major project form [[electronic resource] /] / Neil F. Jones |
Autore | Jones Neil F |
Edizione | [1st ed.] |
Pubbl/distr/stampa | Oxford, Eng. ; ; Malden, MA, : Blackwell, 2004 |
Descrizione fisica | 1 online resource (458 p.) |
Disciplina | 343.42078624 |
Soggetto topico |
Construction contracts - Great Britain
Construction contracts - Law and legislation - England Construction contracts - Law and legislation - Wales |
ISBN |
1-281-31874-4
9786611318741 0-470-79724-X 0-470-69085-2 0-470-68056-3 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
The JCT Major Project Form; Contents; 3 Time; Commencement and completion - clause 9; Access - clause 9.1; Commencing execution of the project - clause 9.2; Use of reasonable endeavours - clause 9.3; Procedure leading to practical completion - clause 9.4; Damages for delay - clause 10; Liquidated damages - clause 10.1; Repayment - clause 10.2; Taking over parts of the project - clause 11; Summary; Comparison with sectional completion; Taking over part with consent - clause 11.1; Statement of part taken over - clause 11.2; Reduction of liquidated damages - clause 11.3; Matters not covered
IntroductionIntroductory words - clause 12.1; The events giving rise to an adjustment to the completion date; 7 Assignment and Third Party Rights; Background; Extensions of time - clause 12; Preface; Abbreviations; 1 Introduction and background; Introduction and background to the Major Project Form; The reduction in length; Who is this contract for?; Some significant features; The contract documents; The requirements; The proposals; 2 General obligations; General obligations of the contractor - clause 1; Execution and completion - clause 1.1 Contractor as planning supervisor and principal contractor -clauses 1.2 and 1.3The Construction (Design and Management) Regulations 1994; Instructions - clause 2; Compliance with instructions - clause 2.1; Instructions to be treated as not giving rise to a Change - clause 2.2; Contractor failing to comply with instruction - clause 2.3; Statutory requirements - clause 3; Compliance with statutory requirements - clause 3.1; Applications made and notices given by contractor in connection with statutory requirements; Fees and charges - clause 3.2 Civil liability for breach of 'Statutory Requirements'Conflict and discrepancy - clause 4; Introduction; Notification of discrepancies - clause 4.1; Discrepancies within the requirements - clause 4.2; Discrepancies within the proposals - clause 4.3; Discrepancies between the requirements, proposals and statutory requirements - clause 4.4; Alterations to statutory requirements after the base date - clause 4.5; Standards of design, materials and workmanship - clause 5; Background law - design - workmanship and materials; Materials and workmanship The contractor's responsibility for the requirements - clause 5.1Contractor's design warranties - clause 5.2; Contractor to use skill and care - clause 5.3; Kinds and standards of materials and goods - clause 5.4; Standards of workmanship - clause 5.5; Design submission procedure - clause 6; Introduction; Contractor to prepare the design documents - clause 6.1; Content and timing of submission of design documents - clause 6.2; Employer's response - clause 6.3; Employer not responding to a submitted design document - clause 6.4 Employer's explanation of why it considers that the design document is non-compliant - clause 6.5 |
Record Nr. | UNISA-996218604803316 |
Jones Neil F | ||
Oxford, Eng. ; ; Malden, MA, : Blackwell, 2004 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. di Salerno | ||
|
The JCT major project form / / Neil F. Jones |
Autore | Jones Neil F |
Edizione | [1st ed.] |
Pubbl/distr/stampa | Oxford, Eng. ; ; Malden, MA, : Blackwell, 2004 |
Descrizione fisica | 1 online resource (458 p.) |
Disciplina | 343.42078624 |
Soggetto topico |
Construction contracts - Great Britain
Construction contracts - Law and legislation - England Construction contracts - Law and legislation - Wales |
ISBN |
1-281-31874-4
9786611318741 0-470-79724-X 0-470-69085-2 0-470-68056-3 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
The JCT Major Project Form; Contents; 3 Time; Commencement and completion - clause 9; Access - clause 9.1; Commencing execution of the project - clause 9.2; Use of reasonable endeavours - clause 9.3; Procedure leading to practical completion - clause 9.4; Damages for delay - clause 10; Liquidated damages - clause 10.1; Repayment - clause 10.2; Taking over parts of the project - clause 11; Summary; Comparison with sectional completion; Taking over part with consent - clause 11.1; Statement of part taken over - clause 11.2; Reduction of liquidated damages - clause 11.3; Matters not covered
IntroductionIntroductory words - clause 12.1; The events giving rise to an adjustment to the completion date; 7 Assignment and Third Party Rights; Background; Extensions of time - clause 12; Preface; Abbreviations; 1 Introduction and background; Introduction and background to the Major Project Form; The reduction in length; Who is this contract for?; Some significant features; The contract documents; The requirements; The proposals; 2 General obligations; General obligations of the contractor - clause 1; Execution and completion - clause 1.1 Contractor as planning supervisor and principal contractor -clauses 1.2 and 1.3The Construction (Design and Management) Regulations 1994; Instructions - clause 2; Compliance with instructions - clause 2.1; Instructions to be treated as not giving rise to a Change - clause 2.2; Contractor failing to comply with instruction - clause 2.3; Statutory requirements - clause 3; Compliance with statutory requirements - clause 3.1; Applications made and notices given by contractor in connection with statutory requirements; Fees and charges - clause 3.2 Civil liability for breach of 'Statutory Requirements'Conflict and discrepancy - clause 4; Introduction; Notification of discrepancies - clause 4.1; Discrepancies within the requirements - clause 4.2; Discrepancies within the proposals - clause 4.3; Discrepancies between the requirements, proposals and statutory requirements - clause 4.4; Alterations to statutory requirements after the base date - clause 4.5; Standards of design, materials and workmanship - clause 5; Background law - design - workmanship and materials; Materials and workmanship The contractor's responsibility for the requirements - clause 5.1Contractor's design warranties - clause 5.2; Contractor to use skill and care - clause 5.3; Kinds and standards of materials and goods - clause 5.4; Standards of workmanship - clause 5.5; Design submission procedure - clause 6; Introduction; Contractor to prepare the design documents - clause 6.1; Content and timing of submission of design documents - clause 6.2; Employer's response - clause 6.3; Employer not responding to a submitted design document - clause 6.4 Employer's explanation of why it considers that the design document is non-compliant - clause 6.5 |
Altri titoli varianti | Joint Contracts Tribunal major project form |
Record Nr. | UNINA-9910813519603321 |
Jones Neil F | ||
Oxford, Eng. ; ; Malden, MA, : Blackwell, 2004 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
The party wall casebook [[electronic resource] /] / Paul Chynoweth ; foreword by the Earl of Lytton |
Autore | Chynoweth Paul |
Edizione | [[Updated ed.].] |
Pubbl/distr/stampa | Oxford [England] ; ; Malden, MA, : Blackwell Pub., 2003 |
Descrizione fisica | 1 online resource (viii, 486 p. ) : ill |
Disciplina | 343.42078624 |
Soggetto topico |
Party walls - Great Britain
Construction contracts - Great Britain |
Soggetto genere / forma | Electronic books. |
ISBN |
1-280-21385-X
9786610213856 0-470-79356-2 0-470-75907-0 1-4051-4765-2 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto | What is a party wall?; What is 'Work in pursuance of the Act'?; Identifying the owners; The validity of notices; The nature of the surveyor's role; Proper constitution of the surveyors' tribunal; Surveyors' jurisdiction; Surveyors' powers; Damage to adjoining property at common law; Surveyors' power to award compensation and making good; Challenges to surveyors' decisions; Appendices - Statutes |
Record Nr. | UNINA-9910145699403321 |
Chynoweth Paul | ||
Oxford [England] ; ; Malden, MA, : Blackwell Pub., 2003 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
The party wall casebook [[electronic resource] /] / Paul Chynoweth ; foreword by the Earl of Lytton |
Autore | Chynoweth Paul |
Edizione | [[Updated ed.].] |
Pubbl/distr/stampa | Oxford [England] ; ; Malden, MA, : Blackwell Pub., 2003 |
Descrizione fisica | 1 online resource (viii, 486 p. ) : ill |
Disciplina | 343.42078624 |
Soggetto topico |
Party walls - Great Britain
Construction contracts - Great Britain |
ISBN |
1-280-21385-X
9786610213856 0-470-79356-2 0-470-75907-0 1-4051-4765-2 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto | What is a party wall?; What is 'Work in pursuance of the Act'?; Identifying the owners; The validity of notices; The nature of the surveyor's role; Proper constitution of the surveyors' tribunal; Surveyors' jurisdiction; Surveyors' powers; Damage to adjoining property at common law; Surveyors' power to award compensation and making good; Challenges to surveyors' decisions; Appendices - Statutes |
Record Nr. | UNISA-996208283603316 |
Chynoweth Paul | ||
Oxford [England] ; ; Malden, MA, : Blackwell Pub., 2003 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. di Salerno | ||
|
The party wall casebook [[electronic resource] /] / Paul Chynoweth ; foreword by the Earl of Lytton |
Autore | Chynoweth Paul |
Edizione | [[Updated ed.].] |
Pubbl/distr/stampa | Oxford [England] ; ; Malden, MA, : Blackwell Pub., 2003 |
Descrizione fisica | 1 online resource (viii, 486 p. ) : ill |
Disciplina | 343.42078624 |
Soggetto topico |
Party walls - Great Britain
Construction contracts - Great Britain |
ISBN |
1-280-21385-X
9786610213856 0-470-79356-2 0-470-75907-0 1-4051-4765-2 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto | What is a party wall?; What is 'Work in pursuance of the Act'?; Identifying the owners; The validity of notices; The nature of the surveyor's role; Proper constitution of the surveyors' tribunal; Surveyors' jurisdiction; Surveyors' powers; Damage to adjoining property at common law; Surveyors' power to award compensation and making good; Challenges to surveyors' decisions; Appendices - Statutes |
Record Nr. | UNINA-9910829837703321 |
Chynoweth Paul | ||
Oxford [England] ; ; Malden, MA, : Blackwell Pub., 2003 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
Subcontracting under the JCT 2005 forms [[electronic resource] /] / Peter Barnes and Matthew Davies |
Autore | Barnes Peter <1954-> |
Pubbl/distr/stampa | Oxford, U.K. ; ; Ames, Iowa, : Wiley-Blackwell, 2008 |
Descrizione fisica | 1 online resource (422 p.) |
Disciplina |
343.42078624
624.068 |
Altri autori (Persone) | DaviesMatthew <1970-> |
Soggetto topico |
Construction contracts - England
Construction industry - Subcontracting - England |
Soggetto genere / forma | Electronic books. |
ISBN |
1-282-03440-5
9786612034404 1-4443-0116-0 1-4443-0117-9 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Contents; Preface; Abbreviations; Chapter 1: Background and Introduction; The purpose and use of JCT sub-contracts; Sub-contracting generally; Contract formation; Chapter 2: The Sub-contract Agreement; The recitals; The articles; The sub-contract particulars; Summary of interim and final payment provisions; Attestation forms; Schedule of information; Supplementary particulars (containing information needed for formula adjustment); Chapter 3: Definitions and Interpretations; Definitions; Interpretation; Chapter 4: Sub-contractors' General Obligations; Sub-contractor's design
Materials, goods and workmanshipCompliance with main contract and indemnity; Errors, discrepancies and divergences; Chapter 5: Time; Time and the adjustment to the period for completion; Practical completion and lateness; Chapter 6: Defects, Design Documents and Warranties; Defects; Sub-contractor's design documents; Collateral warranties; Chapter 7: Control of the Sub-contract Works; Assignment and sub-letting; Person-in-charge; Access provided by the sub-contractor; Opening up the works and remedial measures; Attendance and site conduct; Health and safety and CDM The CDM Regulations (i.e. the Construction (Design and Management) Regulations 2007)Suspension of main contract by contractor; Certificates/statements or notices under the main contract; Chapter 8: Payment; Payment generally; Retention and retention bonds; Counterclaim, set-off and abatement; Interest; Sub-contractor's right of suspension; Fluctuations; Chapter 9: Loss and Expense; What is loss and expense?; Common law damages claims (in respect of a breach of contract); Liquidated damages; Chapter 10: Variations; Chapter 11: Injury, Damage and Insurance Chapter 12: Termination of Sub-contractChapter 13: Settlement of Disputes; Mediation; Adjudication; Arbitration; Litigation; Table of Cases; Table of Statutes and Regulations; Subject Index |
Record Nr. | UNINA-9910146116403321 |
Barnes Peter <1954-> | ||
Oxford, U.K. ; ; Ames, Iowa, : Wiley-Blackwell, 2008 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|