Defective construction work [[electronic resource] /] / Kevin Barrett
| Defective construction work [[electronic resource] /] / Kevin Barrett |
| Autore | Barrett Kevin |
| Pubbl/distr/stampa | Chichester, West Sussex, UK ; ; Ames, Iowa, : Blackwell Science, c2008 |
| Descrizione fisica | 1 online resource (224 p.) |
| Disciplina |
343.42
343.42/07869 624 |
| Soggetto topico |
Construction contracts - England
Liability for building accidents - England Premises liability - England |
| ISBN |
1-282-00932-X
9786612009327 1-4443-0236-1 1-4443-0237-X |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
Contents; Preface; Abbreviations; Chapter 1: Definition and Categorisation of Defects; 1.1 Definition of 'defect'; 1.2 Qualitative defects; 1.3 Patent/latent defects; 1.4 Reasonable examination; 1.5 Importance of the distinction between patent and latent defects; 1.6 The 'purchaser', the 'project team' and other terminology; Chapter 2: Common Law, Statutory and Contractual Rights; 2.1 Common law; 2.2 Statute; 2.3 Contractual rights; Chapter 3: Contracts: An Overview; 3.1 Function; 3.2 The basics; 3.3 Express terms; 3.4 Implied terms; 3.5 Exclusion of implied terms; 3.6 Exclusion clauses
3.7 Risk allocation3.8 Model conditions of contract; Chapter 4: No Contract/Restitution; 4.1 Restitution; 4.2 Restitution and defects; Chapter 5: Letters of Intent; 5.1 Function; 5.2 Legal analysis; 5.3 The implications where defects occur; Chapter 6: Tort: An Overview; 6.1 Negligence; 6.2 Complex structures; 6.3 Economic harm; 6.4 Builders and professional consultants; Chapter 7: The Defective Premises Act 1972; 7.1 Application; 7.2 Fitness for habitation; 7.3 Exclusion; Chapter 8: Third Party Rights; 8.1 The exception; 8.2 Agency; 8.3 Assignment; 8.4 Novation 8.5 Statutory third party rights8.6 Collateral contracts; 8.7 Tort; Chapter 9: Statutory Requirements; 9.1 The Building Act 1984; 9.2 Building regulations; 9.3 Construction products; 9.4 Workplace safety regulations; 9.5 CDM regulations; 9.6 The relationship with contractual obligations; Chapter 10: The Builder's Obligations: Design, Workmanship and Materials; 10.1 Buildability, durability and maintenance; 10.2 Workmanship; 10.3 Materials; 10.4 Design; Chapter 11: The Builder's Obligations: Defects Before Completion; 11.1 Temporary disconformities; 11.2 Opening up the work 11.3 Defects and interim paymentChapter 12: The Builder's Obligations: Defects at Completion; 12.1 Scope of work to be completed; 12.2 Completion; 12.3 Snagging; 12.4 The effect of practical completion; 12.5 The ICE, NEC3 and MF/1 conditions; 12.6 The JCT Major Project Construction Contract; 12.7 The provision of information prior to practical completion; Chapter 13: The Builder's Obligations: Defects Post Completion; 13.1 The common law; 13.2 Defects liability period; 13.3 Retention money; 13.4 Retention bonds; 13.5 Final certificates; Chapter 14: The Professional Team 14.1 Membership of a professional body14.2 The structure of the team; 14.3 Duties; 14.4 Buildability, durability and maintenance; Chapter 15: Architects and Engineers; 15.1 Design; 15.2 Selecting builders and other specialists; 15.3 Supervision; 15.4 Periodic inspection; 15.5 Certification; 15.6 Design review; 15.7 Defects investigations; 15.8 Honest reporting; 15.9 Termination of performance; Chapter 16: Project Managers, Surveyors and Others; 16.1 Project managers; 16.2 Quantity surveyors; 16.3 CDM coordinators; 16.4 Clerk of works/engineer's representative; Chapter 17: Compensation 17.1 Abatement |
| Record Nr. | UNISA-996208656303316 |
Barrett Kevin
|
||
| Chichester, West Sussex, UK ; ; Ames, Iowa, : Blackwell Science, c2008 | ||
| Lo trovi qui: Univ. di Salerno | ||
| ||
Defective construction work [[electronic resource] /] / Kevin Barrett
| Defective construction work [[electronic resource] /] / Kevin Barrett |
| Autore | Barrett Kevin |
| Pubbl/distr/stampa | Chichester, West Sussex, UK ; ; Ames, Iowa, : Blackwell Science, c2008 |
| Descrizione fisica | 1 online resource (224 p.) |
| Disciplina |
343.42
343.42/07869 624 |
| Soggetto topico |
Construction contracts - England
Liability for building accidents - England Premises liability - England |
| ISBN |
1-282-00932-X
9786612009327 1-4443-0236-1 1-4443-0237-X |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
Contents; Preface; Abbreviations; Chapter 1: Definition and Categorisation of Defects; 1.1 Definition of 'defect'; 1.2 Qualitative defects; 1.3 Patent/latent defects; 1.4 Reasonable examination; 1.5 Importance of the distinction between patent and latent defects; 1.6 The 'purchaser', the 'project team' and other terminology; Chapter 2: Common Law, Statutory and Contractual Rights; 2.1 Common law; 2.2 Statute; 2.3 Contractual rights; Chapter 3: Contracts: An Overview; 3.1 Function; 3.2 The basics; 3.3 Express terms; 3.4 Implied terms; 3.5 Exclusion of implied terms; 3.6 Exclusion clauses
3.7 Risk allocation3.8 Model conditions of contract; Chapter 4: No Contract/Restitution; 4.1 Restitution; 4.2 Restitution and defects; Chapter 5: Letters of Intent; 5.1 Function; 5.2 Legal analysis; 5.3 The implications where defects occur; Chapter 6: Tort: An Overview; 6.1 Negligence; 6.2 Complex structures; 6.3 Economic harm; 6.4 Builders and professional consultants; Chapter 7: The Defective Premises Act 1972; 7.1 Application; 7.2 Fitness for habitation; 7.3 Exclusion; Chapter 8: Third Party Rights; 8.1 The exception; 8.2 Agency; 8.3 Assignment; 8.4 Novation 8.5 Statutory third party rights8.6 Collateral contracts; 8.7 Tort; Chapter 9: Statutory Requirements; 9.1 The Building Act 1984; 9.2 Building regulations; 9.3 Construction products; 9.4 Workplace safety regulations; 9.5 CDM regulations; 9.6 The relationship with contractual obligations; Chapter 10: The Builder's Obligations: Design, Workmanship and Materials; 10.1 Buildability, durability and maintenance; 10.2 Workmanship; 10.3 Materials; 10.4 Design; Chapter 11: The Builder's Obligations: Defects Before Completion; 11.1 Temporary disconformities; 11.2 Opening up the work 11.3 Defects and interim paymentChapter 12: The Builder's Obligations: Defects at Completion; 12.1 Scope of work to be completed; 12.2 Completion; 12.3 Snagging; 12.4 The effect of practical completion; 12.5 The ICE, NEC3 and MF/1 conditions; 12.6 The JCT Major Project Construction Contract; 12.7 The provision of information prior to practical completion; Chapter 13: The Builder's Obligations: Defects Post Completion; 13.1 The common law; 13.2 Defects liability period; 13.3 Retention money; 13.4 Retention bonds; 13.5 Final certificates; Chapter 14: The Professional Team 14.1 Membership of a professional body14.2 The structure of the team; 14.3 Duties; 14.4 Buildability, durability and maintenance; Chapter 15: Architects and Engineers; 15.1 Design; 15.2 Selecting builders and other specialists; 15.3 Supervision; 15.4 Periodic inspection; 15.5 Certification; 15.6 Design review; 15.7 Defects investigations; 15.8 Honest reporting; 15.9 Termination of performance; Chapter 16: Project Managers, Surveyors and Others; 16.1 Project managers; 16.2 Quantity surveyors; 16.3 CDM coordinators; 16.4 Clerk of works/engineer's representative; Chapter 17: Compensation 17.1 Abatement |
| Record Nr. | UNINA-9910145832203321 |
Barrett Kevin
|
||
| Chichester, West Sussex, UK ; ; Ames, Iowa, : Blackwell Science, c2008 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||
Defective construction work [[electronic resource] /] / Kevin Barrett
| Defective construction work [[electronic resource] /] / Kevin Barrett |
| Autore | Barrett Kevin |
| Pubbl/distr/stampa | Chichester, West Sussex, UK ; ; Ames, Iowa, : Blackwell Science, c2008 |
| Descrizione fisica | 1 online resource (224 p.) |
| Disciplina |
343.42
343.42/07869 624 |
| Soggetto topico |
Construction contracts - England
Liability for building accidents - England Premises liability - England |
| ISBN |
1-282-00932-X
9786612009327 1-4443-0236-1 1-4443-0237-X |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
Contents; Preface; Abbreviations; Chapter 1: Definition and Categorisation of Defects; 1.1 Definition of 'defect'; 1.2 Qualitative defects; 1.3 Patent/latent defects; 1.4 Reasonable examination; 1.5 Importance of the distinction between patent and latent defects; 1.6 The 'purchaser', the 'project team' and other terminology; Chapter 2: Common Law, Statutory and Contractual Rights; 2.1 Common law; 2.2 Statute; 2.3 Contractual rights; Chapter 3: Contracts: An Overview; 3.1 Function; 3.2 The basics; 3.3 Express terms; 3.4 Implied terms; 3.5 Exclusion of implied terms; 3.6 Exclusion clauses
3.7 Risk allocation3.8 Model conditions of contract; Chapter 4: No Contract/Restitution; 4.1 Restitution; 4.2 Restitution and defects; Chapter 5: Letters of Intent; 5.1 Function; 5.2 Legal analysis; 5.3 The implications where defects occur; Chapter 6: Tort: An Overview; 6.1 Negligence; 6.2 Complex structures; 6.3 Economic harm; 6.4 Builders and professional consultants; Chapter 7: The Defective Premises Act 1972; 7.1 Application; 7.2 Fitness for habitation; 7.3 Exclusion; Chapter 8: Third Party Rights; 8.1 The exception; 8.2 Agency; 8.3 Assignment; 8.4 Novation 8.5 Statutory third party rights8.6 Collateral contracts; 8.7 Tort; Chapter 9: Statutory Requirements; 9.1 The Building Act 1984; 9.2 Building regulations; 9.3 Construction products; 9.4 Workplace safety regulations; 9.5 CDM regulations; 9.6 The relationship with contractual obligations; Chapter 10: The Builder's Obligations: Design, Workmanship and Materials; 10.1 Buildability, durability and maintenance; 10.2 Workmanship; 10.3 Materials; 10.4 Design; Chapter 11: The Builder's Obligations: Defects Before Completion; 11.1 Temporary disconformities; 11.2 Opening up the work 11.3 Defects and interim paymentChapter 12: The Builder's Obligations: Defects at Completion; 12.1 Scope of work to be completed; 12.2 Completion; 12.3 Snagging; 12.4 The effect of practical completion; 12.5 The ICE, NEC3 and MF/1 conditions; 12.6 The JCT Major Project Construction Contract; 12.7 The provision of information prior to practical completion; Chapter 13: The Builder's Obligations: Defects Post Completion; 13.1 The common law; 13.2 Defects liability period; 13.3 Retention money; 13.4 Retention bonds; 13.5 Final certificates; Chapter 14: The Professional Team 14.1 Membership of a professional body14.2 The structure of the team; 14.3 Duties; 14.4 Buildability, durability and maintenance; Chapter 15: Architects and Engineers; 15.1 Design; 15.2 Selecting builders and other specialists; 15.3 Supervision; 15.4 Periodic inspection; 15.5 Certification; 15.6 Design review; 15.7 Defects investigations; 15.8 Honest reporting; 15.9 Termination of performance; Chapter 16: Project Managers, Surveyors and Others; 16.1 Project managers; 16.2 Quantity surveyors; 16.3 CDM coordinators; 16.4 Clerk of works/engineer's representative; Chapter 17: Compensation 17.1 Abatement |
| Record Nr. | UNINA-9910830047903321 |
Barrett Kevin
|
||
| Chichester, West Sussex, UK ; ; Ames, Iowa, : Blackwell Science, c2008 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||
Defective construction work / / Kevin Barrett
| Defective construction work / / Kevin Barrett |
| Autore | Barrett Kevin |
| Pubbl/distr/stampa | Chichester, West Sussex, UK ; ; Ames, Iowa, : Blackwell Science, c2008 |
| Descrizione fisica | 1 online resource (224 p.) |
| Disciplina |
343.42
343.42/07869 624 |
| Soggetto topico |
Construction contracts - England
Liability for building accidents - England Premises liability - England |
| ISBN |
9786612009327
9781282009325 128200932X 9781444302363 1444302361 9781444302370 144430237X |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
Contents; Preface; Abbreviations; Chapter 1: Definition and Categorisation of Defects; 1.1 Definition of 'defect'; 1.2 Qualitative defects; 1.3 Patent/latent defects; 1.4 Reasonable examination; 1.5 Importance of the distinction between patent and latent defects; 1.6 The 'purchaser', the 'project team' and other terminology; Chapter 2: Common Law, Statutory and Contractual Rights; 2.1 Common law; 2.2 Statute; 2.3 Contractual rights; Chapter 3: Contracts: An Overview; 3.1 Function; 3.2 The basics; 3.3 Express terms; 3.4 Implied terms; 3.5 Exclusion of implied terms; 3.6 Exclusion clauses
3.7 Risk allocation3.8 Model conditions of contract; Chapter 4: No Contract/Restitution; 4.1 Restitution; 4.2 Restitution and defects; Chapter 5: Letters of Intent; 5.1 Function; 5.2 Legal analysis; 5.3 The implications where defects occur; Chapter 6: Tort: An Overview; 6.1 Negligence; 6.2 Complex structures; 6.3 Economic harm; 6.4 Builders and professional consultants; Chapter 7: The Defective Premises Act 1972; 7.1 Application; 7.2 Fitness for habitation; 7.3 Exclusion; Chapter 8: Third Party Rights; 8.1 The exception; 8.2 Agency; 8.3 Assignment; 8.4 Novation 8.5 Statutory third party rights8.6 Collateral contracts; 8.7 Tort; Chapter 9: Statutory Requirements; 9.1 The Building Act 1984; 9.2 Building regulations; 9.3 Construction products; 9.4 Workplace safety regulations; 9.5 CDM regulations; 9.6 The relationship with contractual obligations; Chapter 10: The Builder's Obligations: Design, Workmanship and Materials; 10.1 Buildability, durability and maintenance; 10.2 Workmanship; 10.3 Materials; 10.4 Design; Chapter 11: The Builder's Obligations: Defects Before Completion; 11.1 Temporary disconformities; 11.2 Opening up the work 11.3 Defects and interim paymentChapter 12: The Builder's Obligations: Defects at Completion; 12.1 Scope of work to be completed; 12.2 Completion; 12.3 Snagging; 12.4 The effect of practical completion; 12.5 The ICE, NEC3 and MF/1 conditions; 12.6 The JCT Major Project Construction Contract; 12.7 The provision of information prior to practical completion; Chapter 13: The Builder's Obligations: Defects Post Completion; 13.1 The common law; 13.2 Defects liability period; 13.3 Retention money; 13.4 Retention bonds; 13.5 Final certificates; Chapter 14: The Professional Team 14.1 Membership of a professional body14.2 The structure of the team; 14.3 Duties; 14.4 Buildability, durability and maintenance; Chapter 15: Architects and Engineers; 15.1 Design; 15.2 Selecting builders and other specialists; 15.3 Supervision; 15.4 Periodic inspection; 15.5 Certification; 15.6 Design review; 15.7 Defects investigations; 15.8 Honest reporting; 15.9 Termination of performance; Chapter 16: Project Managers, Surveyors and Others; 16.1 Project managers; 16.2 Quantity surveyors; 16.3 CDM coordinators; 16.4 Clerk of works/engineer's representative; Chapter 17: Compensation 17.1 Abatement |
| Record Nr. | UNINA-9911018883903321 |
Barrett Kevin
|
||
| Chichester, West Sussex, UK ; ; Ames, Iowa, : Blackwell Science, c2008 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||
The JCT design and build contract 2005 [[electronic resource] /] / David Chappell
| The JCT design and build contract 2005 [[electronic resource] /] / David Chappell |
| Autore | Chappell David (David M.) |
| Edizione | [3rd ed.] |
| Pubbl/distr/stampa | Oxford, UK ; ; Malden, MA, USA, : Blackwell, 2007 |
| Descrizione fisica | 1 online resource (290 p.) |
| Disciplina | 343.42/07869 |
| Soggetto topico | Construction contracts - England |
| ISBN |
1-281-32159-1
9786611321598 0-470-75978-X 0-470-75974-7 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
The JCT Design and Build Contract 2005; Contents; Preface to the Third Edition; Chapter 1: Introduction; 1.1 Definitions; 1.2 Advantages and disadvantages; 1.3 The architect's role; 1.4 Standard forms available; 1.5 Tendering procedures; Chapter 2: Contract Documents; 2.1 The documents; 2.2 Completing the form; 2.3 Employer's Requirements; 2.4 Contractor's Proposals; 2.5 Contract Sum Analysis; 2.6 Supplementary provisions; 2.7 Priority, discrepancies, errors; 2.8 Custody and copies; 2.9 Notices; Chapter 3: Design Liability; 3.1 General principles of design liability
3.2 Liability under the contract3.3 Design liability optional arrangements and consequences; 3.4 Consultant switch and novation; 3.5 Novation agreements; 3.6 In-house or sub-let; 3.7 Consultant warranties; Chapter 4: The Contractor's Obligations; 4.1 Express and implied terms; 4.2 Implied terms; 4.3 Express terms; 4.4 Other obligations; Chapter 5: The Employer's Powers and Duties; 5.1 Employer's agent; 5.2 Express and implied terms; 5.3 Instructions; 5.4 Powers; 5.5 Employer's duties; Chapter 6: Sub-contractors and Statutory Requirements; 6.1 General; 6.2 Sub-contractors 6.3 Statutory requirements6.4 The Construction (Design and Management) Regulations 2007; 6.5 Work not forming part of the contract; 6.6 Third party rights and collateral warranties; Chapter 7: Possession, Practical Completion and Rectification; 7.1 Possession and deferment; 7.2 Progress; 7.3 Practical completion; 7.4 Partial possession; 7.5 Rectification period; Chapter 8: Extension of Time; 8.1 Principles; 8.2 Contract procedure; 8.3 Relevant events; 8.4 Liquidated damages; Chapter 9: Financial Claims; 9.1 Types of claim; 9.2 Application for direct loss and/or expense 9.3 Supplemental provision procedures (para. 5)9.4 Grounds for direct loss and/or expense; 9.5 Antiquities; Chapter 10: Payment; 10.1 Contract sum; 10.2 Interim payments; 10.3 Applications; 10.4 Employer's right to withhold payment or to deduct; 10.5 Retention; 10.6 Final payment; 10.7 Advance payment; 10.8 Changes; 10.9 Valuation of changes under the supplemental provisions; 10.10 Fluctuations; 10.11 VAT; Chapter 11: Insurance and Indemnities; 11.1 Injury to persons and property; 11.2 Employer's liability; 11.3 Insurance of the Works; 11.4 Insurance of the Works: new building 11.5 Insurance of the Works: existing building11.6 Terrorism cover; 11.7 The Joint Fire Code; 11.8 Professional indemnity insurance; Chapter 12: Termination; 12.1 Common law position; 12.2 Termination generally; 12.3 Termination by the employer; 12.4 Termination by the contractor; Chapter 13: Dispute Resolution; 13.1 General; 13.2 Adjudication; 13.3 Arbitration; 13.4 Legal proceedings; Table of Cases; Clause Index; Subject Index |
| Record Nr. | UNINA-9910784987103321 |
Chappell David (David M.)
|
||
| Oxford, UK ; ; Malden, MA, USA, : Blackwell, 2007 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||
The JCT design and build contract 2005 [[electronic resource] /] / David Chappell
| The JCT design and build contract 2005 [[electronic resource] /] / David Chappell |
| Autore | Chappell David (David M.) |
| Edizione | [3rd ed.] |
| Pubbl/distr/stampa | Oxford, UK ; ; Malden, MA, USA, : Blackwell, 2007 |
| Descrizione fisica | 1 online resource (290 p.) |
| Disciplina | 343.42/07869 |
| Soggetto topico | Construction contracts - England |
| ISBN |
1-281-32159-1
9786611321598 0-470-75978-X 0-470-75974-7 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
The JCT Design and Build Contract 2005; Contents; Preface to the Third Edition; Chapter 1: Introduction; 1.1 Definitions; 1.2 Advantages and disadvantages; 1.3 The architect's role; 1.4 Standard forms available; 1.5 Tendering procedures; Chapter 2: Contract Documents; 2.1 The documents; 2.2 Completing the form; 2.3 Employer's Requirements; 2.4 Contractor's Proposals; 2.5 Contract Sum Analysis; 2.6 Supplementary provisions; 2.7 Priority, discrepancies, errors; 2.8 Custody and copies; 2.9 Notices; Chapter 3: Design Liability; 3.1 General principles of design liability
3.2 Liability under the contract3.3 Design liability optional arrangements and consequences; 3.4 Consultant switch and novation; 3.5 Novation agreements; 3.6 In-house or sub-let; 3.7 Consultant warranties; Chapter 4: The Contractor's Obligations; 4.1 Express and implied terms; 4.2 Implied terms; 4.3 Express terms; 4.4 Other obligations; Chapter 5: The Employer's Powers and Duties; 5.1 Employer's agent; 5.2 Express and implied terms; 5.3 Instructions; 5.4 Powers; 5.5 Employer's duties; Chapter 6: Sub-contractors and Statutory Requirements; 6.1 General; 6.2 Sub-contractors 6.3 Statutory requirements6.4 The Construction (Design and Management) Regulations 2007; 6.5 Work not forming part of the contract; 6.6 Third party rights and collateral warranties; Chapter 7: Possession, Practical Completion and Rectification; 7.1 Possession and deferment; 7.2 Progress; 7.3 Practical completion; 7.4 Partial possession; 7.5 Rectification period; Chapter 8: Extension of Time; 8.1 Principles; 8.2 Contract procedure; 8.3 Relevant events; 8.4 Liquidated damages; Chapter 9: Financial Claims; 9.1 Types of claim; 9.2 Application for direct loss and/or expense 9.3 Supplemental provision procedures (para. 5)9.4 Grounds for direct loss and/or expense; 9.5 Antiquities; Chapter 10: Payment; 10.1 Contract sum; 10.2 Interim payments; 10.3 Applications; 10.4 Employer's right to withhold payment or to deduct; 10.5 Retention; 10.6 Final payment; 10.7 Advance payment; 10.8 Changes; 10.9 Valuation of changes under the supplemental provisions; 10.10 Fluctuations; 10.11 VAT; Chapter 11: Insurance and Indemnities; 11.1 Injury to persons and property; 11.2 Employer's liability; 11.3 Insurance of the Works; 11.4 Insurance of the Works: new building 11.5 Insurance of the Works: existing building11.6 Terrorism cover; 11.7 The Joint Fire Code; 11.8 Professional indemnity insurance; Chapter 12: Termination; 12.1 Common law position; 12.2 Termination generally; 12.3 Termination by the employer; 12.4 Termination by the contractor; Chapter 13: Dispute Resolution; 13.1 General; 13.2 Adjudication; 13.3 Arbitration; 13.4 Legal proceedings; Table of Cases; Clause Index; Subject Index |
| Record Nr. | UNISA-996203965903316 |
Chappell David (David M.)
|
||
| Oxford, UK ; ; Malden, MA, USA, : Blackwell, 2007 | ||
| Lo trovi qui: Univ. di Salerno | ||
| ||
The JCT design and build contract 2005 / / David Chappell
| The JCT design and build contract 2005 / / David Chappell |
| Autore | Chappell David (David M.) |
| Edizione | [3rd ed.] |
| Pubbl/distr/stampa | Oxford, UK ; ; Malden, MA, USA, : Blackwell, 2007 |
| Descrizione fisica | 1 online resource (290 p.) |
| Disciplina | 343.42/07869 |
| Soggetto topico | Construction contracts - England |
| ISBN |
9786611321598
9781281321596 1281321591 9780470759783 047075978X 9780470759745 0470759747 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
The JCT Design and Build Contract 2005; Contents; Preface to the Third Edition; Chapter 1: Introduction; 1.1 Definitions; 1.2 Advantages and disadvantages; 1.3 The architect's role; 1.4 Standard forms available; 1.5 Tendering procedures; Chapter 2: Contract Documents; 2.1 The documents; 2.2 Completing the form; 2.3 Employer's Requirements; 2.4 Contractor's Proposals; 2.5 Contract Sum Analysis; 2.6 Supplementary provisions; 2.7 Priority, discrepancies, errors; 2.8 Custody and copies; 2.9 Notices; Chapter 3: Design Liability; 3.1 General principles of design liability
3.2 Liability under the contract3.3 Design liability optional arrangements and consequences; 3.4 Consultant switch and novation; 3.5 Novation agreements; 3.6 In-house or sub-let; 3.7 Consultant warranties; Chapter 4: The Contractor's Obligations; 4.1 Express and implied terms; 4.2 Implied terms; 4.3 Express terms; 4.4 Other obligations; Chapter 5: The Employer's Powers and Duties; 5.1 Employer's agent; 5.2 Express and implied terms; 5.3 Instructions; 5.4 Powers; 5.5 Employer's duties; Chapter 6: Sub-contractors and Statutory Requirements; 6.1 General; 6.2 Sub-contractors 6.3 Statutory requirements6.4 The Construction (Design and Management) Regulations 2007; 6.5 Work not forming part of the contract; 6.6 Third party rights and collateral warranties; Chapter 7: Possession, Practical Completion and Rectification; 7.1 Possession and deferment; 7.2 Progress; 7.3 Practical completion; 7.4 Partial possession; 7.5 Rectification period; Chapter 8: Extension of Time; 8.1 Principles; 8.2 Contract procedure; 8.3 Relevant events; 8.4 Liquidated damages; Chapter 9: Financial Claims; 9.1 Types of claim; 9.2 Application for direct loss and/or expense 9.3 Supplemental provision procedures (para. 5)9.4 Grounds for direct loss and/or expense; 9.5 Antiquities; Chapter 10: Payment; 10.1 Contract sum; 10.2 Interim payments; 10.3 Applications; 10.4 Employer's right to withhold payment or to deduct; 10.5 Retention; 10.6 Final payment; 10.7 Advance payment; 10.8 Changes; 10.9 Valuation of changes under the supplemental provisions; 10.10 Fluctuations; 10.11 VAT; Chapter 11: Insurance and Indemnities; 11.1 Injury to persons and property; 11.2 Employer's liability; 11.3 Insurance of the Works; 11.4 Insurance of the Works: new building 11.5 Insurance of the Works: existing building11.6 Terrorism cover; 11.7 The Joint Fire Code; 11.8 Professional indemnity insurance; Chapter 12: Termination; 12.1 Common law position; 12.2 Termination generally; 12.3 Termination by the employer; 12.4 Termination by the contractor; Chapter 13: Dispute Resolution; 13.1 General; 13.2 Adjudication; 13.3 Arbitration; 13.4 Legal proceedings; Table of Cases; Clause Index; Subject Index |
| Record Nr. | UNINA-9910966154703321 |
Chappell David (David M.)
|
||
| Oxford, UK ; ; Malden, MA, USA, : Blackwell, 2007 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||
The JCT minor works building contracts 2005 [[electronic resource] /] / David Chappell
| The JCT minor works building contracts 2005 [[electronic resource] /] / David Chappell |
| Autore | Chappell David (David M.) |
| Edizione | [4th ed.] |
| Pubbl/distr/stampa | Oxford ; ; Malden, MA, : Blackwell Pub., 2006 |
| Descrizione fisica | 1 online resource (264 p.) |
| Disciplina | 343.42/07869 |
| Altri autori (Persone) | ChappellDavid (David M.). |
| Soggetto topico | Construction contracts - England |
| ISBN |
1-281-32158-3
9786611321581 0-470-75977-1 0-470-75973-9 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
The JCT Minor Works Building Contracts 2005; Contents; Preface to the Fourth Edition; Chapter 1 The Purpose and Use of MW and MWD; 1.1 The background; 1.2 The use of MW and MWD; 1.3 Arrangement and contents of MW and MWD; 1.4 Contractual formalities; 1.5 Problems with the contract documents; 1.6 Notices, time and the law; Chapter 2 Contract Comparisons; 2.1 Introduction; 2.2 JCT contracts compared; Chapter 3 Contract Documents and Insurance; 3.1 Contract documents; 3.1.1 Types and uses; 3.1.2 Importance and priority; 3.1.3 Custody and copies; 3.1.4 Limits to use; 3.2 Insurance
3.2.1 Injury to or death of persons3.2.2 Damage to property; 3.2.3 Insurance of the Works against fire etc.; 3.2.4 A new building where the contractor is required to insure; 3.2.5 Alterations or extensions to existing structures; 3.3 Summary; Chapter 4 Architect; 4.1 Authority and duties; 4.2 Express provisions of the contract; 4.3 Architect's instructions; 4.4 Summary; Chapter 5 Contractor; 5.1 Contractor's obligations: express and implied; 5.1.1 Legal principles; 5.1.2 Execution of the works; 5.1.3 Workmanship and materials; 5.1.4 Statutory obligations; 5.1.5 Contractor's representative 5.2 Other obligations5.2.1 Access to the works and premises; 5.2.2 Compliance with architect's instructions; 5.2.3 Suspension of obligations; 5.2.4 Other rights and obligations; 5.3 Summary; Chapter 6 Employer; 6.1 Powers and duties: express and implied; 6.2 Rights under MW and MWD; 6.2.1 General; 6.2.2 Damages for non-completion; 6.2.3 Other rights; 6.3 Duties under MW and MWD; 6.3.1 General; 6.3.2 Payment; 6.3.3 Retention; 6.3.4 Other duties; 6.4 Summary; Chapter 7 Quantity Surveyor and Clerk of Works; 7.1 Quantity surveyor; 7.1.1 Appointment; 7.1.2 Duties; 7.1.3 Responsibilities 7.2 Clerk of works7.2.1 Appointment; 7.2.2 Duties; 7.2.3 Responsibilities; 7.3 Summary; Chapter 8 Subcontractors and Suppliers; 8.1 General; 8.2 Subcontractors; 8.2.1 Assignment; 8.2.2 Subcontracting; 8.2.3 Nominated subcontractors; 8.3 Statutory authorities; 8.4 Works not forming part of the contract; 8.5 Summary; Chapter 9 Possession, Completion and Defects; 9.1 Possession; 9.1.1 Introduction; 9.1.2 Date for possession; 9.2 Practical completion; 9.2.1 Definition; 9.2.2 Consequences of practical completion; 9.3 Rectification period; 9.3.1 Definition 9.3.2 Defects, shrinkages and other faults9.3.3 Frost; 9.3.4 Procedure; 9.4 Summary; Chapter 10 Claims; 10.1 General; 10.2 Extension of time; 10.2.1 Legal principles; 10.2.2 Liquidated damages; 10.2.3 Extending the contract period; 10.3 Money claims; 10.3.1 General; 10.3.2 Types of claims; 10.4 Summary; Chapter 11 Payment; 11.1 Contract sum; 11.2 Payment before practical completion; 11.3 Penultimate certificate; 11.4 Final certificate; 11.5 Effect of certificate; 11.6 Interest and withholding payment; 11.7 Retention; 11.8 Variations; 11.9 Order of work; 11.10 Provisional sums 11.11 Fluctuations |
| Record Nr. | UNINA-9910145293903321 |
Chappell David (David M.)
|
||
| Oxford ; ; Malden, MA, : Blackwell Pub., 2006 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||
The JCT minor works building contracts 2005 [[electronic resource] /] / David Chappell
| The JCT minor works building contracts 2005 [[electronic resource] /] / David Chappell |
| Autore | Chappell David (David M.) |
| Edizione | [4th ed.] |
| Pubbl/distr/stampa | Oxford ; ; Malden, MA, : Blackwell Pub., 2006 |
| Descrizione fisica | 1 online resource (264 p.) |
| Disciplina | 343.42/07869 |
| Altri autori (Persone) | ChappellDavid (David M.). |
| Soggetto topico | Construction contracts - England |
| ISBN |
1-281-32158-3
9786611321581 0-470-75977-1 0-470-75973-9 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
The JCT Minor Works Building Contracts 2005; Contents; Preface to the Fourth Edition; Chapter 1 The Purpose and Use of MW and MWD; 1.1 The background; 1.2 The use of MW and MWD; 1.3 Arrangement and contents of MW and MWD; 1.4 Contractual formalities; 1.5 Problems with the contract documents; 1.6 Notices, time and the law; Chapter 2 Contract Comparisons; 2.1 Introduction; 2.2 JCT contracts compared; Chapter 3 Contract Documents and Insurance; 3.1 Contract documents; 3.1.1 Types and uses; 3.1.2 Importance and priority; 3.1.3 Custody and copies; 3.1.4 Limits to use; 3.2 Insurance
3.2.1 Injury to or death of persons3.2.2 Damage to property; 3.2.3 Insurance of the Works against fire etc.; 3.2.4 A new building where the contractor is required to insure; 3.2.5 Alterations or extensions to existing structures; 3.3 Summary; Chapter 4 Architect; 4.1 Authority and duties; 4.2 Express provisions of the contract; 4.3 Architect's instructions; 4.4 Summary; Chapter 5 Contractor; 5.1 Contractor's obligations: express and implied; 5.1.1 Legal principles; 5.1.2 Execution of the works; 5.1.3 Workmanship and materials; 5.1.4 Statutory obligations; 5.1.5 Contractor's representative 5.2 Other obligations5.2.1 Access to the works and premises; 5.2.2 Compliance with architect's instructions; 5.2.3 Suspension of obligations; 5.2.4 Other rights and obligations; 5.3 Summary; Chapter 6 Employer; 6.1 Powers and duties: express and implied; 6.2 Rights under MW and MWD; 6.2.1 General; 6.2.2 Damages for non-completion; 6.2.3 Other rights; 6.3 Duties under MW and MWD; 6.3.1 General; 6.3.2 Payment; 6.3.3 Retention; 6.3.4 Other duties; 6.4 Summary; Chapter 7 Quantity Surveyor and Clerk of Works; 7.1 Quantity surveyor; 7.1.1 Appointment; 7.1.2 Duties; 7.1.3 Responsibilities 7.2 Clerk of works7.2.1 Appointment; 7.2.2 Duties; 7.2.3 Responsibilities; 7.3 Summary; Chapter 8 Subcontractors and Suppliers; 8.1 General; 8.2 Subcontractors; 8.2.1 Assignment; 8.2.2 Subcontracting; 8.2.3 Nominated subcontractors; 8.3 Statutory authorities; 8.4 Works not forming part of the contract; 8.5 Summary; Chapter 9 Possession, Completion and Defects; 9.1 Possession; 9.1.1 Introduction; 9.1.2 Date for possession; 9.2 Practical completion; 9.2.1 Definition; 9.2.2 Consequences of practical completion; 9.3 Rectification period; 9.3.1 Definition 9.3.2 Defects, shrinkages and other faults9.3.3 Frost; 9.3.4 Procedure; 9.4 Summary; Chapter 10 Claims; 10.1 General; 10.2 Extension of time; 10.2.1 Legal principles; 10.2.2 Liquidated damages; 10.2.3 Extending the contract period; 10.3 Money claims; 10.3.1 General; 10.3.2 Types of claims; 10.4 Summary; Chapter 11 Payment; 11.1 Contract sum; 11.2 Payment before practical completion; 11.3 Penultimate certificate; 11.4 Final certificate; 11.5 Effect of certificate; 11.6 Interest and withholding payment; 11.7 Retention; 11.8 Variations; 11.9 Order of work; 11.10 Provisional sums 11.11 Fluctuations |
| Record Nr. | UNISA-996218271603316 |
Chappell David (David M.)
|
||
| Oxford ; ; Malden, MA, : Blackwell Pub., 2006 | ||
| Lo trovi qui: Univ. di Salerno | ||
| ||
The JCT minor works building contracts 2005 / / David Chappell
| The JCT minor works building contracts 2005 / / David Chappell |
| Autore | Chappell David (David M.) |
| Edizione | [4th ed.] |
| Pubbl/distr/stampa | Oxford ; ; Malden, MA, : Blackwell Pub., 2006 |
| Descrizione fisica | 1 online resource (264 p.) |
| Disciplina | 343.42/07869 |
| Altri autori (Persone) | ChappellDavid (David M.). |
| Soggetto topico | Construction contracts - England |
| ISBN |
9786611321581
9781281321589 1281321583 9780470759776 0470759771 9780470759738 0470759739 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
The JCT Minor Works Building Contracts 2005; Contents; Preface to the Fourth Edition; Chapter 1 The Purpose and Use of MW and MWD; 1.1 The background; 1.2 The use of MW and MWD; 1.3 Arrangement and contents of MW and MWD; 1.4 Contractual formalities; 1.5 Problems with the contract documents; 1.6 Notices, time and the law; Chapter 2 Contract Comparisons; 2.1 Introduction; 2.2 JCT contracts compared; Chapter 3 Contract Documents and Insurance; 3.1 Contract documents; 3.1.1 Types and uses; 3.1.2 Importance and priority; 3.1.3 Custody and copies; 3.1.4 Limits to use; 3.2 Insurance
3.2.1 Injury to or death of persons3.2.2 Damage to property; 3.2.3 Insurance of the Works against fire etc.; 3.2.4 A new building where the contractor is required to insure; 3.2.5 Alterations or extensions to existing structures; 3.3 Summary; Chapter 4 Architect; 4.1 Authority and duties; 4.2 Express provisions of the contract; 4.3 Architect's instructions; 4.4 Summary; Chapter 5 Contractor; 5.1 Contractor's obligations: express and implied; 5.1.1 Legal principles; 5.1.2 Execution of the works; 5.1.3 Workmanship and materials; 5.1.4 Statutory obligations; 5.1.5 Contractor's representative 5.2 Other obligations5.2.1 Access to the works and premises; 5.2.2 Compliance with architect's instructions; 5.2.3 Suspension of obligations; 5.2.4 Other rights and obligations; 5.3 Summary; Chapter 6 Employer; 6.1 Powers and duties: express and implied; 6.2 Rights under MW and MWD; 6.2.1 General; 6.2.2 Damages for non-completion; 6.2.3 Other rights; 6.3 Duties under MW and MWD; 6.3.1 General; 6.3.2 Payment; 6.3.3 Retention; 6.3.4 Other duties; 6.4 Summary; Chapter 7 Quantity Surveyor and Clerk of Works; 7.1 Quantity surveyor; 7.1.1 Appointment; 7.1.2 Duties; 7.1.3 Responsibilities 7.2 Clerk of works7.2.1 Appointment; 7.2.2 Duties; 7.2.3 Responsibilities; 7.3 Summary; Chapter 8 Subcontractors and Suppliers; 8.1 General; 8.2 Subcontractors; 8.2.1 Assignment; 8.2.2 Subcontracting; 8.2.3 Nominated subcontractors; 8.3 Statutory authorities; 8.4 Works not forming part of the contract; 8.5 Summary; Chapter 9 Possession, Completion and Defects; 9.1 Possession; 9.1.1 Introduction; 9.1.2 Date for possession; 9.2 Practical completion; 9.2.1 Definition; 9.2.2 Consequences of practical completion; 9.3 Rectification period; 9.3.1 Definition 9.3.2 Defects, shrinkages and other faults9.3.3 Frost; 9.3.4 Procedure; 9.4 Summary; Chapter 10 Claims; 10.1 General; 10.2 Extension of time; 10.2.1 Legal principles; 10.2.2 Liquidated damages; 10.2.3 Extending the contract period; 10.3 Money claims; 10.3.1 General; 10.3.2 Types of claims; 10.4 Summary; Chapter 11 Payment; 11.1 Contract sum; 11.2 Payment before practical completion; 11.3 Penultimate certificate; 11.4 Final certificate; 11.5 Effect of certificate; 11.6 Interest and withholding payment; 11.7 Retention; 11.8 Variations; 11.9 Order of work; 11.10 Provisional sums 11.11 Fluctuations |
| Record Nr. | UNINA-9910818613203321 |
Chappell David (David M.)
|
||
| Oxford ; ; Malden, MA, : Blackwell Pub., 2006 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||