Autore |
Vilventhan Aneetha
|
Edizione | [1st ed. 2023.] |
Pubbl/distr/stampa |
Singapore : , : Springer Nature Singapore : , : Imprint : Springer, , 2023
|
Descrizione fisica |
1 online resource (528 pages)
|
Disciplina |
624.068
|
Altri autori (Persone) |
SinghShamsher Bahadur
DelhiVenkata Santosh Kumar
|
Collana |
Lecture Notes in Civil Engineering
|
Soggetto topico |
Buildings - Design and construction
Construction industry - Management
Building materials
Building Construction and Design
Construction Management
Building Materials
|
ISBN |
981-9925-52-5
|
Formato |
Materiale a stampa ![](img/format/mas.png) |
Livello bibliografico |
Monografia |
Lingua di pubblicazione |
eng
|
Nota di contenuto |
Intro -- Preface -- Contents -- About the Editors -- Advances in Construction Management -- Gaining Competitive Advantage Using Human Resource Management in Indian Construction Industry -- 1 Introduction -- 1.1 Human Resource Management in Construction -- 1.2 Competitive Advantage -- 2 Literature Review -- 3 Objectives -- 3.1 Research Methodology -- 3.2 Hypothesis Testing -- 3.3 Descriptive Analysis of Responses -- 4 Path Analysis -- 4.1 Inference of Path Analysis -- 5 Recommendation -- 6 Conclusion -- References -- Mapping the Project Complexity of Metro Rail Project Using DEMATEL Technique -- 1 Introduction -- 2 Literature Review -- 2.1 Project Complexity Measurement -- 3 Research Methodology -- 3.1 Complexity in the Context of Bangalore Metro Rail Projects -- 3.2 Application of the DEMATEL Method -- 4 Results and Discussion -- 5 Conclusions -- References -- Contractor Selection Approaches and Pre-qualification Criteria on Construction Projects: A Review -- 1 Introduction -- 1.1 General -- 1.2 Need of the Study -- 1.3 Research Gap -- 2 Literature Survey -- 2.1 Pre-qualification Criteria -- 2.2 Contractor Selection Approaches -- 3 Discussion -- 3.1 Prequalification Criteria -- 3.2 Contractor Selection Approaches -- 3.3 Significant Issues in Contractor Selection Process -- 4 Conclusion -- References -- Delay Analysis of Residential Construction by Using Augmented Reality and Virtual Reality -- 1 Introduction -- 1.1 General -- 2 Literature Survey -- 2.1 Research Gap -- 3 Methodology -- 4 AR and VR in the Construction Industry -- 4.1 Augmented Reality in Construction -- 4.2 Virtual Reality in Construction -- 5 Case Study -- 5.1 Observations and Results -- 6 Conclusion -- References -- Identification of Challenges Influencing the Adoption of Building Information Modelling (BIM) and Facility Management for Metro Rail Projects in India.
1 Introduction -- 2 Literature Review -- 2.1 Review of the Indian Metro Rail Projects -- 2.2 Overview of BIM in FM Applications -- 3 Research Methodology -- 3.1 Identification of the Challenges of BIM-FM for Metro Rail Projects -- 4 Research Results -- 4.1 Questionnaire Results -- 4.2 Status of BIM Enables FM for Metro Projects Practices -- 5 Discussion and Analysis -- 6 Conclusions and Recommendations -- References -- Evaluation of Operational Energy for Institutional Building - A Case Study -- 1 Introduction -- 2 Literature Review -- 3 Methodology -- 3.1 Methodology Flow Chart -- 4 Results -- 4.1 All Summer Simulation -- 4.2 Simulation for Hottest Week -- 4.3 Base Case -- 4.4 CASE 1: Change of Lighting (LED) -- 4.5 Case 2 Change of Window Glazing -- 4.6 Case 3 Change of Roof Materials -- 5 Conclusions -- References -- Interactions of Lean and BIM Integrated Augmented Reality in Underground Utility Relocation Projects -- 1 Introduction -- 2 Literature Review -- 3 Methodology -- 4 BIM Model Development and Application -- 5 BIM Lean Interaction -- 6 BIM-AR Functionalities -- 7 AR-BIM Lean Interactions -- 8 Discussion -- 9 Conclusion -- References -- Inventory Management of Construction Project Through ABC Analysis: A Case Study -- 1 Introduction -- 1.1 ABC Analysis -- 2 Objectives of the Study -- 3 Research Methodology -- 4 Results and Discussion -- 4.1 Earning Level of Selected Projects -- 4.2 Categories the Material Through ABC Analysis -- 4.3 Evaluation of Inventory Management Practices -- 5 Conclusions -- References -- Crisis Management Due to Covid-19 in Indian Construction Industry - An Overview -- 1 Introduction -- 2 Crisis Management -- 3 Impact of Covid-19 on the Construction Industry -- 3.1 Loss of Life -- 3.2 Economic Setback -- 3.3 Reputation Loss -- 3.4 Labour Loss -- 4 Coronavirus Crisis Management Opportunities -- 5 Conclusions.
References -- Studies on the Factors Influencing Occupational Accidents on Health Hazards of Labours in Thermal Power Plant Construction -- 1 Introduction -- 2 Study Objectives -- 3 Research Methodology -- 3.1 Labor Demographic Profile -- 3.2 Data Internal Consistency -- 3.3 Socio-Demographic Wise Occupational Accidents -- 4 Results -- 5 Discussion -- 6 Conclusion -- References -- Studies on the Status of the Women Construction Workers Before and During Covid-19 Situation in Warangal Districts -- 1 Introduction -- 2 Methodology of the Study -- 3 Results and Discussion -- 3.1 Age Composition -- 3.2 Marital Status -- 3.3 Educational Status -- 3.4 Present Scenario of Women Workers Due to Covid-19 Lockdown -- 3.5 Present Income Scenario of Women Workers -- 3.6 Families Depends on the Women Wages -- 4 Suggestions -- 5 Conclusions -- References -- Comparative Study on the Cost Analysis of Embodied Energy of Construction Materials: Cellular Lightweight Concrete (CLC) Versus Conventional Brick Systems -- 1 Introduction -- 2 Green Processes -- 3 Limitations in Burnt Bricks Walling System -- 3.1 Erosion of Top Soil -- 3.2 Power and Fuel Consumption -- 3.3 Small Size -- 3.4 Inadequate Supply -- 3.5 Different Quality -- 4 Advantages of CLC Walling Process -- 4.1 Reduced Dead Weight of Building Components -- 4.2 Cost and Material Savings -- 4.3 Reduced Costs of Transportation -- 4.4 Ease of Handling -- 4.5 Hilly Construction Sites -- 4.6 Environment Friendly -- 4.7 Thermal Insulation -- 4.8 Fire Protection -- 4.9 Fast-track Construction -- 4.10 Saving of Steel -- 4.11 Embodied Energy in CLC -- 5 Methodology and Case Application -- 6 Results and Discussions -- 6.1 Direct Cost Savings Due to Onsite CLC Block Production and Walling System -- 6.2 Indirect Cost Savings -- 7 Conclusions -- References.
An Exploratory Study on the Integration of Digital BIM and IOT in Structural Health Monitoring Practices -- 1 Introduction -- 1.1 Objectives -- 2 Literature Review -- 3 Methodology -- 3.1 Integration of IoT and BIM -- 4 Case Study -- 4.1 Data Capturing and Analysis -- 4.2 Data Transformation -- 4.3 Monitoring, Communication and Hardware Setup -- 4.4 Developing a Digital BIM Model with Dynamo -- 4.5 Results and Summary -- 5 Conclusion -- References -- Quantitative and Qualitative Benefits of BIM Implementation in Hospital Management: A Case Study Analysis -- 1 Introduction -- 2 Literature Review -- 2.1 Cost-Benefit Analysis -- 2.2 Time-Effort Distribution Method -- 3 Research Methodology -- 3.1 Collecting Data to Develop the Time-Effort Distribution Curves -- 3.2 Data Processing and Developing Time-Effort Distribution Curves -- 3.3 Determining Costs/Benefits of BIM Implementation -- 3.4 Data Collection -- 3.5 Quantitative Assessment -- 3.6 Qualitative Assessment -- 4 Results and Discussion -- 4.1 Result Significance -- 5 Conclusion -- References -- Advances in Construction Materials -- Effective Reuse of Concrete Debris in Soil-Column Study -- 1 Introduction -- 2 Material and Methodology -- 3 Results and Discussion -- 3.1 Experimental Results -- 3.2 Numerical Analysis -- 4 Conclusion -- References -- Comparative Study to Investigate the Suitability of Sustainable Alternatives in Enhancing Strength Characteristics of Black Cotton Soil -- 1 Introduction -- 2 Methodology -- 3 Materials -- 4 Experimental Studies -- 5 Experimental Results -- 5.1 Effect of Lime on BC Soil -- 5.2 Effect of Sisal Fiber Content on BC Soil -- 5.3 Effect of Brick Powder Mix on Lime Blended BC Soil -- 5.4 Effect of Phosphogypsum on Lime Blended BC Soil -- 6 Discussion on Test Results -- 7 Conclusions -- 8 Scope for Further Work -- References.
Effect of Compressive Strength and Reinforcing Bar Diameter on Tensile and Cracking Aspects of Reinforced Concrete Prisms -- 1 Introduction -- 2 Experimental Program -- 2.1 Materials Used -- 2.2 Mix Proportioning, Casting and Curing of Specimens -- 2.3 Tests Conducted -- 2.4 Uni-axial Tension Test on RC Prisms -- 3 Results and Discussion -- 3.1 Tensile Behavior -- 3.2 Tension Stiffening Effect and Tension Stiffening Bond Factor -- 3.3 Cracking Behavior -- 4 Conclusions -- References -- Shear Strength and Settlement Analysis of Stabilized Soil with GGBS and Cement -- 1 Introduction -- 2 Materials and Methods -- 3 Results and Discussion -- 4 Conclusion -- References -- A Study on the Effect of Alccofine on the Stability of Soil Slopes -- 1 Introduction -- 2 Materials and Methods -- 2.1 Red Soil -- 2.2 Amended Red Soil -- 2.3 Slope Stability Analyses -- 3 Results and Discussions -- 3.1 Amended Red Soil -- 3.2 Results of Undrained Triaxial Tests -- 3.3 Factors of Safety -- 4 Conclusion -- References -- Evaluation of Axial Load Carrying Capacity of CFST Columns for Geometrical Cross-Sections -- 1 Introduction -- 2 Design Codes -- 2.1 Euro Code-4(2004) -- 2.2 AISC Code (2005) -- 3 Experimental and Analytical modelling of CFST Columns -- 3.1 Materials -- 3.2 Experimental Set Up -- 3.3 FEM Modeling -- 3.4 Discussion and Outcomes -- 4 Data Validation using Design Codes -- 5 Conclusions -- References -- Upgrading Recycled Aggregates in Concrete by Using Waste Plastics -- 1 Introduction -- 2 Materials and Methods -- 2.1 Waste Plastic (Polypropylene) -- 2.2 Recycled Aggregates (RA) -- 2.3 Preparation of Plastic-Coated Aggregates (PCA) -- 2.4 Aggregate Analyses -- 2.5 Analyses of Concrete Cubes -- 3 Results and Discussion -- 3.1 Relative Aggregate Properties -- 3.2 Relative Concrete Cubes Performance -- 4 Conclusion -- References.
Mechanical Performance of Rice Husk Ash Made Geopolymer Concrete with Partially Replaced Steel Slag as Fine Aggregate.
|
Record Nr. | UNINA-9910736002503321 |