top

  Info

  • Utilizzare la checkbox di selezione a fianco di ciascun documento per attivare le funzionalità di stampa, invio email, download nei formati disponibili del (i) record.

  Info

  • Utilizzare questo link per rimuovere la selezione effettuata.
Building contract claims [[electronic resource]]
Building contract claims [[electronic resource]]
Autore Chappell David
Edizione [4th ed. /]
Pubbl/distr/stampa Oxford, : Blackwell, 2005
Descrizione fisica 1 online resource (xi, 552 p. ) : ill
Disciplina 343.41078624
Altri autori (Persone) Powell-SmithVincent
SimsJohn <1929->
ChappellDavid
Soggetto topico Construction contracts - Great Britain
Breach of contract - Great Britain
Actions and defenses - Great Britain
Damages - Great Britain
Law
Construction contracts - England
Breach of contract - England
Actions and defenses - England
Damages - England
Law - Great Britain
Law - Non-U.S
Law, Politics & Government
Soggetto genere / forma Electronic books.
ISBN 1-280-21296-9
9786610212965
0-470-79917-X
0-470-75932-1
1-4051-4808-X
Formato Materiale a stampa
Livello bibliografico Monografia
Lingua di pubblicazione eng
Nota di contenuto PART 1.1 Introduction.1.1 Structure of the book.1.2 Definitions.1.3 The basis of claims.1.4 Architect's and Contract Administrator's powers and liability to the contractor.1.5 Quantity surveyor's powers.2 Time.2.1 Time of the essence.2.2 Time at large.2.3 Extension of time clauses in contracts.2.4 Concurrency.2.5 Acceleration.2.6 Sectional completion.2.7 The SCL extension of time protocol.3 Liquidated damages.3.1 The meaning and purpose of liquidated damages.3.2 Liquidated damages or penalty.3.3 Liquidated damages as limitation of liability.3.4 Sums greater than a genuine pre-estimate.3.5 Liquidated damages as an exhaustive remedy.3.6 Injunction.3.7 Liquidated damages in relation to loss.3.8 Where there is no breach of contract.3.9 Calculation of liquidated damages.3.10 Maximum recovery if sum is a penalty.3.11 Maximum recovery if liquidated damages do not apply.3.12 Bonus clauses.4 Basis for common law claims.4.1 General.4.2 Implied terms in building contracts.4.3 Variation of contract.4.4 Omission of work to give it to others.4.5 Extra work.4.6 Possession of site.4.7 Site conditions.5 Direct loss and/or expense.5.1 Introduction.5.2 Direct v indirect.6 Potential heads of claim.6.1 Basic principles.6.2 Two basic claims situations.6.3 Foreshortened programme.6.4 The 'knock-on' effect.6.5 The more common heads of loss.6.6 Cost of a claim.7 Causation.7.1 Theory.7.2 Use of networks.7.3 Float.8 The global approach.9 Substantiation of claims.9.1 Principles.9.2 Nature of supporting evidence.9.3 'Scott Schedule'.PART 2.10 Extension of time under JCT standard form contracts.10.1 Extension of time position under JCT 98.10.2 Extension of time position under IFC 98.10.3 Extension of time position under MW 98.10.4 Extension of time position under WCD 98.10.5 Extension of time position under PCC 98.10.6 Extension of time position under MC 98.10.7 Extension of time position under TC/C 02.10.8 Extension of time position under MPF 03.11 Liquidated damages under JCT standard form contracts.11.1 Liquidated damages position under JCT 98.11.2 Liquidated damages position under IFC 98.11.3 Liquidated damages position under MW 98.11.4 Liquidated damages position under WCD 98.11.5 Liquidated damages position under PCC 98.11.6 Liquidated damages position under MC 98.11.7 Liquidated damages position under TC/C 02.11.8 Liquidated damages position under MPF 03.12 Loss and/or expense under JCT standard form contracts.12.1 Introduction.12.2 Under JCT 98.12.3 Under JCT IFC 98.12.4 Under JCT MW 98.12.5 Under JCT WCD 98.12.6 Under JCT PCC 98.12.7 Under JCT MC 98.12.8 Under JCT TC/C 02.12.9 Under JCT MPF 03.13 Variations.13.1 Introduction.13.2 The baseline.13.3 Bills of quantities.13.4 Functions of the architect and the quantity surveyor.13.5 Variations position under JCT 98.13.6 Variations position under IFC 98.13.7 Variations position under MW 98.13.8 Variations position under WCD 98.13.9 Variations position under PCC 98.13.10 Variations position under MC 98.13.11 Variations position under TC/C 02.13.12 Variations position under MPF 03.PART 3.14 Claims under GC/Works/1 (1998).14.1 Introduction.14.2 Valuation of instructions.14.3 Prolongation and disruption.14.4 Extension of time and liquidated damages.15 Variations and claims under ACA 3.15.1 Introduction.15.2 Monetary claims under ACA 3.15.3 Architect's instructions.15.4 Extension of time and liquidated damages.15.5 Claims on the final certificate.16 Claims under NEC.16.1 Introduction.16.2 Compensation events.16.3 Delay damages.17 Sub-contract claims.17.1 Introduction.17.2 Nominated sub-contract form NSC/C.17.3 Domestic sub-contract form DSC.17.4 Sub-contract conditions for sub-contractors named under IFC 98 (NAM/SC).17.5 The IN/SC form of domestic sub-contract for use with IFC 98.17.6 The Works Contract/2 for use with MC 98.17.7 The ACA form of sub-contract.Appendix A: Example of build up of contractor's entitlement to reimbursement of direct loss and/or expense under JCT 98, clause 26.Appendix B: Extension of time and money claims under DOM/1.Table of cases.Table of standard form contract clauses.Index
Altri titoli varianti Building Contract Claims 4e
Record Nr. UNISA-996214615303316
Chappell David  
Oxford, : Blackwell, 2005
Materiale a stampa
Lo trovi qui: Univ. di Salerno
Opac: Controlla la disponibilità qui
Contract documentation for contractors [[electronic resource] /] / Vincent Powell-Smith, John Sims, and Christopher Dancaster
Contract documentation for contractors [[electronic resource] /] / Vincent Powell-Smith, John Sims, and Christopher Dancaster
Autore Powell-Smith Vincent
Edizione [3rd ed.]
Pubbl/distr/stampa Malden, Mass., : Blackwell Science, 2000
Descrizione fisica 1 online resource (330 p.)
Disciplina 346.4102/2
692.80941
Altri autori (Persone) SimsJohn <1929->
DancasterChristopher
Soggetto topico Contracts for work and labor - Great Britain
Contractors - Legal status, laws, etc - Great Britain
Soggetto genere / forma Electronic books.
ISBN 1-282-35981-9
9786612359811
0-470-69606-0
0-470-69531-5
Formato Materiale a stampa
Livello bibliografico Monografia
Lingua di pubblicazione eng
Nota di contenuto Contract Documentation for Contractors; Contents; Acknowledgements; Preface to the First Edition; Preface to the Third Edition; 1 Introduction; 1.01 General; 1.02 Letters and notices; 1.03 Tabular summary of mandatory requirements; 2 Pre-contract Documentation; 2.01 Introduction; 2.02 Qualification; 2.03 Preliminary enquiry; 2.04 Formal invitation to tender; 2.05 Errors in tender documents; 2.06 Time for tendering; 2.07 Onerous conditions in tender documents; 2.08 Submission of tender; 2.09 Subcontractorsand suppliers; 2.10 Letters of intent; 2.11 Signing the contract; 2.12 Performance bonds
2.13 Advance payment bonds and bonds in respect of payment for off-site materials and/or goods3 Commencement and Progress; 3.01 Pre-commencement meeting; 3.02 Site and progress meetings; 3.03 Site diaries; 3.04 The master programme; 3.05 Discrepancies in documents; 3.06 Compliance with statutory requirements; 3.07 Problems with materials; 3.08 Information necessary for the works; 3.09 Instructions generally; 3.10 Variations; 3.11 Work done by others; 3.12 Other matters; 4 Certificates and Payments; 4.01 Introduction; 4.02 Application for payment; 4.03 Late payment; 4.04 The withholding notice
4.05 Wrongful deductions from the certificate by the employer4.06 Right of suspension of obligations by contractor; 4.07 Problems with interim certificates; 4.08 Off-site goods and materials; 4.09 Retention; 4.10 The Construction Industry Scheme; 5 Delays and Disruptions; 5.01 General; 5.02 Possession of the site and commencement of work; 5.03 Delay in general; 5.04 Detailed procedures under JCT 98 or WCD 98; 5.05 The grant of the extension; 5.06 Procedures under IFC 98; 5.07 Liquidated and ascertained damages; 5.08 Reimbursement of loss and expense under JCT 98 and WCD 98
5.09 Machinery for recovery5.10 Common law claims; 5.11 Reimbursement of loss and expense under IFC 98; 5.12 Delays and disruptions under the JCT Minor Works Form 1998; 6 Completion and Defects Liability; 6.01 Practical completion; 6.02 Sectional completion and partial possession; 6.03 Defects liability; 6.04 Final certificate; 7 Determination; 7.01 Introduction; 7.02 Determination by the employer; 7.03 Determination by the contractor; 7.04 Determination by the employer or contractor: no-fault determination; 7.05 Determination under the Minor Works Form; 8 Subcontractors and Suppliers
8.01 Introduction8.02 Assignment; 8.03 Sub-letting: domestic subcontractors; 8.04 Letters of intent to subcontractors or suppliers; 8.05 Signing the subcontract; 8.06 Nominated suppliers; 8.07 Nominated subcontractors under JCT 98; 8.08 Right of objection; 8.09 Procedures after nomination; 8.10 Re-nomination; 8.11 Named subcontractors under IFC 98; 8.12 Subcontract notices in general; 8.13 Extensions of time; 8.14 Money claims; 8.15 Withholding notices; 8.16 Determination; 9 Settlement of Disputes; 9.01 Introduction; 9.02 Adjudication generally; 9.03 Appointing an adjudicator
9.04 Arbitration generally
Record Nr. UNINA-9910144526803321
Powell-Smith Vincent  
Malden, Mass., : Blackwell Science, 2000
Materiale a stampa
Lo trovi qui: Univ. Federico II
Opac: Controlla la disponibilità qui
Contract documentation for contractors [[electronic resource] /] / Vincent Powell-Smith, John Sims, and Christopher Dancaster
Contract documentation for contractors [[electronic resource] /] / Vincent Powell-Smith, John Sims, and Christopher Dancaster
Autore Powell-Smith Vincent
Edizione [3rd ed.]
Pubbl/distr/stampa Malden, Mass., : Blackwell Science, 2000
Descrizione fisica 1 online resource (330 p.)
Disciplina 346.4102/2
692.80941
Altri autori (Persone) SimsJohn <1929->
DancasterChristopher
Soggetto topico Contracts for work and labor - Great Britain
Contractors - Legal status, laws, etc - Great Britain
ISBN 1-282-35981-9
9786612359811
0-470-69606-0
0-470-69531-5
Formato Materiale a stampa
Livello bibliografico Monografia
Lingua di pubblicazione eng
Nota di contenuto Contract Documentation for Contractors; Contents; Acknowledgements; Preface to the First Edition; Preface to the Third Edition; 1 Introduction; 1.01 General; 1.02 Letters and notices; 1.03 Tabular summary of mandatory requirements; 2 Pre-contract Documentation; 2.01 Introduction; 2.02 Qualification; 2.03 Preliminary enquiry; 2.04 Formal invitation to tender; 2.05 Errors in tender documents; 2.06 Time for tendering; 2.07 Onerous conditions in tender documents; 2.08 Submission of tender; 2.09 Subcontractorsand suppliers; 2.10 Letters of intent; 2.11 Signing the contract; 2.12 Performance bonds
2.13 Advance payment bonds and bonds in respect of payment for off-site materials and/or goods3 Commencement and Progress; 3.01 Pre-commencement meeting; 3.02 Site and progress meetings; 3.03 Site diaries; 3.04 The master programme; 3.05 Discrepancies in documents; 3.06 Compliance with statutory requirements; 3.07 Problems with materials; 3.08 Information necessary for the works; 3.09 Instructions generally; 3.10 Variations; 3.11 Work done by others; 3.12 Other matters; 4 Certificates and Payments; 4.01 Introduction; 4.02 Application for payment; 4.03 Late payment; 4.04 The withholding notice
4.05 Wrongful deductions from the certificate by the employer4.06 Right of suspension of obligations by contractor; 4.07 Problems with interim certificates; 4.08 Off-site goods and materials; 4.09 Retention; 4.10 The Construction Industry Scheme; 5 Delays and Disruptions; 5.01 General; 5.02 Possession of the site and commencement of work; 5.03 Delay in general; 5.04 Detailed procedures under JCT 98 or WCD 98; 5.05 The grant of the extension; 5.06 Procedures under IFC 98; 5.07 Liquidated and ascertained damages; 5.08 Reimbursement of loss and expense under JCT 98 and WCD 98
5.09 Machinery for recovery5.10 Common law claims; 5.11 Reimbursement of loss and expense under IFC 98; 5.12 Delays and disruptions under the JCT Minor Works Form 1998; 6 Completion and Defects Liability; 6.01 Practical completion; 6.02 Sectional completion and partial possession; 6.03 Defects liability; 6.04 Final certificate; 7 Determination; 7.01 Introduction; 7.02 Determination by the employer; 7.03 Determination by the contractor; 7.04 Determination by the employer or contractor: no-fault determination; 7.05 Determination under the Minor Works Form; 8 Subcontractors and Suppliers
8.01 Introduction8.02 Assignment; 8.03 Sub-letting: domestic subcontractors; 8.04 Letters of intent to subcontractors or suppliers; 8.05 Signing the subcontract; 8.06 Nominated suppliers; 8.07 Nominated subcontractors under JCT 98; 8.08 Right of objection; 8.09 Procedures after nomination; 8.10 Re-nomination; 8.11 Named subcontractors under IFC 98; 8.12 Subcontract notices in general; 8.13 Extensions of time; 8.14 Money claims; 8.15 Withholding notices; 8.16 Determination; 9 Settlement of Disputes; 9.01 Introduction; 9.02 Adjudication generally; 9.03 Appointing an adjudicator
9.04 Arbitration generally
Record Nr. UNISA-996212480303316
Powell-Smith Vincent  
Malden, Mass., : Blackwell Science, 2000
Materiale a stampa
Lo trovi qui: Univ. di Salerno
Opac: Controlla la disponibilità qui
Contract documentation for contractors [[electronic resource] /] / Vincent Powell-Smith, John Sims, and Christopher Dancaster
Contract documentation for contractors [[electronic resource] /] / Vincent Powell-Smith, John Sims, and Christopher Dancaster
Autore Powell-Smith Vincent
Edizione [3rd ed.]
Pubbl/distr/stampa Malden, Mass., : Blackwell Science, 2000
Descrizione fisica 1 online resource (330 p.)
Disciplina 346.4102/2
692.80941
Altri autori (Persone) SimsJohn <1929->
DancasterChristopher
Soggetto topico Contracts for work and labor - Great Britain
Contractors - Legal status, laws, etc - Great Britain
ISBN 1-282-35981-9
9786612359811
0-470-69606-0
0-470-69531-5
Formato Materiale a stampa
Livello bibliografico Monografia
Lingua di pubblicazione eng
Nota di contenuto Contract Documentation for Contractors; Contents; Acknowledgements; Preface to the First Edition; Preface to the Third Edition; 1 Introduction; 1.01 General; 1.02 Letters and notices; 1.03 Tabular summary of mandatory requirements; 2 Pre-contract Documentation; 2.01 Introduction; 2.02 Qualification; 2.03 Preliminary enquiry; 2.04 Formal invitation to tender; 2.05 Errors in tender documents; 2.06 Time for tendering; 2.07 Onerous conditions in tender documents; 2.08 Submission of tender; 2.09 Subcontractorsand suppliers; 2.10 Letters of intent; 2.11 Signing the contract; 2.12 Performance bonds
2.13 Advance payment bonds and bonds in respect of payment for off-site materials and/or goods3 Commencement and Progress; 3.01 Pre-commencement meeting; 3.02 Site and progress meetings; 3.03 Site diaries; 3.04 The master programme; 3.05 Discrepancies in documents; 3.06 Compliance with statutory requirements; 3.07 Problems with materials; 3.08 Information necessary for the works; 3.09 Instructions generally; 3.10 Variations; 3.11 Work done by others; 3.12 Other matters; 4 Certificates and Payments; 4.01 Introduction; 4.02 Application for payment; 4.03 Late payment; 4.04 The withholding notice
4.05 Wrongful deductions from the certificate by the employer4.06 Right of suspension of obligations by contractor; 4.07 Problems with interim certificates; 4.08 Off-site goods and materials; 4.09 Retention; 4.10 The Construction Industry Scheme; 5 Delays and Disruptions; 5.01 General; 5.02 Possession of the site and commencement of work; 5.03 Delay in general; 5.04 Detailed procedures under JCT 98 or WCD 98; 5.05 The grant of the extension; 5.06 Procedures under IFC 98; 5.07 Liquidated and ascertained damages; 5.08 Reimbursement of loss and expense under JCT 98 and WCD 98
5.09 Machinery for recovery5.10 Common law claims; 5.11 Reimbursement of loss and expense under IFC 98; 5.12 Delays and disruptions under the JCT Minor Works Form 1998; 6 Completion and Defects Liability; 6.01 Practical completion; 6.02 Sectional completion and partial possession; 6.03 Defects liability; 6.04 Final certificate; 7 Determination; 7.01 Introduction; 7.02 Determination by the employer; 7.03 Determination by the contractor; 7.04 Determination by the employer or contractor: no-fault determination; 7.05 Determination under the Minor Works Form; 8 Subcontractors and Suppliers
8.01 Introduction8.02 Assignment; 8.03 Sub-letting: domestic subcontractors; 8.04 Letters of intent to subcontractors or suppliers; 8.05 Signing the subcontract; 8.06 Nominated suppliers; 8.07 Nominated subcontractors under JCT 98; 8.08 Right of objection; 8.09 Procedures after nomination; 8.10 Re-nomination; 8.11 Named subcontractors under IFC 98; 8.12 Subcontract notices in general; 8.13 Extensions of time; 8.14 Money claims; 8.15 Withholding notices; 8.16 Determination; 9 Settlement of Disputes; 9.01 Introduction; 9.02 Adjudication generally; 9.03 Appointing an adjudicator
9.04 Arbitration generally
Record Nr. UNINA-9910829933303321
Powell-Smith Vincent  
Malden, Mass., : Blackwell Science, 2000
Materiale a stampa
Lo trovi qui: Univ. Federico II
Opac: Controlla la disponibilità qui
Contract documentation for contractors / / Vincent Powell-Smith, John Sims, and Christopher Dancaster
Contract documentation for contractors / / Vincent Powell-Smith, John Sims, and Christopher Dancaster
Autore Powell-Smith Vincent
Edizione [3rd ed.]
Pubbl/distr/stampa Malden, Mass., : Blackwell Science, 2000
Descrizione fisica 1 online resource (330 p.)
Disciplina 346.4102/2
Altri autori (Persone) SimsJohn <1929->
DancasterChristopher
Soggetto topico Contracts for work and labor - Great Britain
Contractors - Legal status, laws, etc - Great Britain
ISBN 1-282-35981-9
9786612359811
0-470-69606-0
0-470-69531-5
Formato Materiale a stampa
Livello bibliografico Monografia
Lingua di pubblicazione eng
Nota di contenuto Contract Documentation for Contractors; Contents; Acknowledgements; Preface to the First Edition; Preface to the Third Edition; 1 Introduction; 1.01 General; 1.02 Letters and notices; 1.03 Tabular summary of mandatory requirements; 2 Pre-contract Documentation; 2.01 Introduction; 2.02 Qualification; 2.03 Preliminary enquiry; 2.04 Formal invitation to tender; 2.05 Errors in tender documents; 2.06 Time for tendering; 2.07 Onerous conditions in tender documents; 2.08 Submission of tender; 2.09 Subcontractorsand suppliers; 2.10 Letters of intent; 2.11 Signing the contract; 2.12 Performance bonds
2.13 Advance payment bonds and bonds in respect of payment for off-site materials and/or goods3 Commencement and Progress; 3.01 Pre-commencement meeting; 3.02 Site and progress meetings; 3.03 Site diaries; 3.04 The master programme; 3.05 Discrepancies in documents; 3.06 Compliance with statutory requirements; 3.07 Problems with materials; 3.08 Information necessary for the works; 3.09 Instructions generally; 3.10 Variations; 3.11 Work done by others; 3.12 Other matters; 4 Certificates and Payments; 4.01 Introduction; 4.02 Application for payment; 4.03 Late payment; 4.04 The withholding notice
4.05 Wrongful deductions from the certificate by the employer4.06 Right of suspension of obligations by contractor; 4.07 Problems with interim certificates; 4.08 Off-site goods and materials; 4.09 Retention; 4.10 The Construction Industry Scheme; 5 Delays and Disruptions; 5.01 General; 5.02 Possession of the site and commencement of work; 5.03 Delay in general; 5.04 Detailed procedures under JCT 98 or WCD 98; 5.05 The grant of the extension; 5.06 Procedures under IFC 98; 5.07 Liquidated and ascertained damages; 5.08 Reimbursement of loss and expense under JCT 98 and WCD 98
5.09 Machinery for recovery5.10 Common law claims; 5.11 Reimbursement of loss and expense under IFC 98; 5.12 Delays and disruptions under the JCT Minor Works Form 1998; 6 Completion and Defects Liability; 6.01 Practical completion; 6.02 Sectional completion and partial possession; 6.03 Defects liability; 6.04 Final certificate; 7 Determination; 7.01 Introduction; 7.02 Determination by the employer; 7.03 Determination by the contractor; 7.04 Determination by the employer or contractor: no-fault determination; 7.05 Determination under the Minor Works Form; 8 Subcontractors and Suppliers
8.01 Introduction8.02 Assignment; 8.03 Sub-letting: domestic subcontractors; 8.04 Letters of intent to subcontractors or suppliers; 8.05 Signing the subcontract; 8.06 Nominated suppliers; 8.07 Nominated subcontractors under JCT 98; 8.08 Right of objection; 8.09 Procedures after nomination; 8.10 Re-nomination; 8.11 Named subcontractors under IFC 98; 8.12 Subcontract notices in general; 8.13 Extensions of time; 8.14 Money claims; 8.15 Withholding notices; 8.16 Determination; 9 Settlement of Disputes; 9.01 Introduction; 9.02 Adjudication generally; 9.03 Appointing an adjudicator
9.04 Arbitration generally
Record Nr. UNINA-9910877155303321
Powell-Smith Vincent  
Malden, Mass., : Blackwell Science, 2000
Materiale a stampa
Lo trovi qui: Univ. Federico II
Opac: Controlla la disponibilità qui