Formulas and calculations for drilling, production, and workover : all the formulas you need to solve drilling and production problems / / William Lyons, Tom Carter, Norton J. Lapeyrouse
| Formulas and calculations for drilling, production, and workover : all the formulas you need to solve drilling and production problems / / William Lyons, Tom Carter, Norton J. Lapeyrouse |
| Autore | Lyons William C |
| Edizione | [3rd ed.] |
| Pubbl/distr/stampa | Amsterdam ; ; Boston, : Elsevier/GPP, c2012 |
| Descrizione fisica | 1 online resource (304 p.) |
| Disciplina |
500
622.3381 |
| Altri autori (Persone) |
CarterTom
LapeyrouseNorton J |
| Soggetto topico | Oil wells - Management - Mathematics |
| ISBN |
1-283-29381-1
9786613293817 1-85617-930-3 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
Front Cover; Formulas and Calculations for Drilling, Production, and Workover: All the Formulas You Need to Solve Drilling and Production Problems; Copyright; Contents; Preface; Chapter 1: Basic Equations; 1.0. Terminology; 1.1. Mud Weight MW (lb/ft3), Mud Weight MW (ppg), and Specific Gravity (SG) [USCS/British]; 1.2. Density ρ (kg/m3 or kg/liter), Mud Weight MW (N/m3 or N/liter), and Specific Gravity (SG) [SI-Metric]; 1.3. Hydrostatic Pressure (P) and (p) [USCS/British]; 1.4. Hydrostatic Pressure (P) and (p) [SI-Metric]; 1.5. Pressure Gradient (psi/ft), G (ppg) [USCS/British]
1.6. Pressure Gradient G (SG) [SI-Metric]1.7. Equivalent Circulating ""Density"" ECD (ppg) [USCS/British]; 1.8. Equivalent Circulating ""Density"" ECD (N/liter) and ECD (SG) [SI-Metric]; 1.9. Mud Pump Output Q (bbl/stk) and q (gpm) [USCS/British]; 1.9.1. Triplex Pump; 1.9.2. Duplex Pump; 1.9.3. Hydraulic Horsepower; 1.10. Capacity Formulas; 1.10.1. Annular Capacity between Casing or Hole and Drill Pipe, Tubing, or Casing; 1.10.2. Annular Capacity between Casing and Multiple Strings of Tubing 1.10.3. Capacity of Tubulars and Open Hole: Drill Pipe, Drill Collars, Tubing, Casing, Hole, and Any Cylindrical Object1.10.4. Amount of Cuttings Drilled per Foot of Hole Drilled; 1.11. Annular Velocity Van (ft/min); Metric Calculations; SI Unit Calculations; 1.12. Strokes per Minute (SPM) Required for a Given Annular Velocity; 1.13. Control Drilling; 1.14. Buoyancy Factor (BF); 1.15. Decrease When Pulling Pipe Out of the Hole; 1.15.1. When Pulling DRY Pipe; 1.15.2. When Pulling WET Pipe; 1.16. Loss of Overbalance Due to Falling Mud Level; 1.16.1. Feet of Pipe Pulled DRY to Lost Overbalance 1.16.2. Feet of Pipe Pulled WET to Lose OverbalanceMetric Calculations; SI Unit Calculations; Formation Temperature (Tf); 1.17. Circulating Hydraulic Horsepower (HHP); 1.17.1. Rule of Thumb Formulas; 1.18. Pump Pressure/Pump Stroke Relationship (the Roughneck's Formula); Metric Calculation; SI Unit Calculation; 1.19. Cost per Foot; 1.20. Temperature Conversion Formulas; Convert Temperature, Fahrenheit (F) to Centigrade or Celsius (C); Convert Temperature, Centigrade or Celsius (C) to Fahrenheit; Convert Temperature, Centigrade, Celsius (C) to Kelvin (K) Convert Temperature, Fahrenheit (F) to Rankine (R)Rule of Thumb Formulas for Temperature Conversion; Chapter 2: Basic Calculations; 2.0. Capacity, Volumes, and Strokes; 2.0.1. Capacity of Drill Pipe, HWDP, Casing, or Open Hole in bbl/ft; 2.0.2. Capacity of Casing or Open Hole between Drill Pipe, HWDP, or Casing in bbl/ft; 2.0.3. Capacity of Drill Pipe, HWDP, Casing, or Open Hole in ft/bbl; 2.0.4. Capacity of Casing or Open Hole between Drill Pipe, HWDP, or Casing in ft/bbl; 2.0.5. Volume of Drill Pipe, HWDP, Drill Collar, or Casing in bbl 2.0.6. Volume between Drill Pipe, HWDP, or Casing, and the Casing or Open Hole in bbl |
| Record Nr. | UNINA-9911006551403321 |
Lyons William C
|
||
| Amsterdam ; ; Boston, : Elsevier/GPP, c2012 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||
Working guide to drilling equipment and operations / / William Lyons
| Working guide to drilling equipment and operations / / William Lyons |
| Autore | Lyons William C |
| Edizione | [1st ed.] |
| Pubbl/distr/stampa | Amsterdam ; ; Boston, : Gulf Professional, c2010 |
| Descrizione fisica | 1 online resource (617 p.) |
| Disciplina | 622.338190284 |
| Soggetto topico |
Oil well drilling - Equipment and supplies
Gas well drilling - Equipment and supplies |
| ISBN |
1-282-32935-9
9786612329357 1-85617-844-7 |
| Formato | Materiale a stampa |
| Livello bibliografico | Monografia |
| Lingua di pubblicazione | eng |
| Nota di contenuto |
Front Cover; Working Guide to Drilling Equipment and Operations; Copyright Page; Table of Contents; Chapter 1. DRILLING MUDS AND COMPLETION SYSTEMS; 1.1 Functions of Drilling Muds; 1.2 Classifications; 1.3 Testing of Drilling Systems; 1.4 Completion and Workover Fluids; 1.5 Safety Aspects of Handling Brines; 1.6 Preventing Contamination; Chapter 2. DRILL STRING: COMPOSITION AND DESIGN; 2.1 Drill Collar; 2.2 Drill Pipe; 2.3 Drill String Inspection Procedure; Chapter 3. AIR AND GAS DRILLING; 3.1 Bottomhole Pressure; 3.2 Minimum Volumetric Flow Rate; 3.3 Drill Bit Orifices or Nozzles
3.4 Injection Pressure3.5 Water Injection; 3.6 Saturation of Gas; 3.7 Eliminate Stickiness; 3.8 Suppression of Hydrocarbon Combustion; 3.9 Aerated Drilling (Gasified Fluid Drilling); 3.10 Stable Foam Drilling; 3.11 Completions Operations; 3.12 Compressor and Inert Air Generator Units; 3.13 Highly Deviated Well Drilling and Completions; 3.14 Downhole Motors; Chapter 4. DIRECTIONAL DRILLING; 4.1 Glossary of Terms used in Directional Drilling; 4.2 Dogleg Severity (Hole Curvature) Calculations; Chapter 5. SELECTION OF DRILLING PRACTICES; 5.1 Health, Safety and Environment; 5.2 Production Capacity 5.3 Well Planning and Implementation5.4 Drilling Implementation; 5.5 Post-Run Evaluation; Chapter 6. WELL PRESSURE CONTROL; 6.1 Introduction; 6.2 Surface Equipment; 6.3 When and How to Close the Well; 6.4 Gas-Cut Mud; 6.5 The Closed Well; 6.6 Kick Control Procedures; 6.7 Maximum Casing Pressure; 6.8 Maximum Borehole Pressure; Chapter 7. FISHING OPERATIONS AND EQUIPMENT; 7.1 Causes and Prevention; 7.2 Pipe Recovery and Free Point; 7.3 Parting the Pipe; 7.4 Jars, Bumper Subs and Intensifiers; 7.5 Attachment Devices; 7.6 Fishing for Junk; 7.7 Abandonment; 7.8 Wirelines Chapter 8. CASING AND CASING STRING DESIGN8.1 Types of Casing; 8.2 Casing Data; 8.3 Combination Casing Strings; 8.4 Running and Pulling Casing; Chapter 9. WELL CEMENTING; 9.1 Introduction; 9.2 Chemistry of Cements; 9.3 Cementing Principles; 9.4 Standardization and Properties of Cements; 9.5 Properties of Cement Slurry and Set Cement; 9.6 Cement Additives; 9.7 Primary Cementing; 9.8 Secondary Cementing; Chapter 10. TUBING AND TUBING STRING DESIGN; 10.1 API Physical Property Specifications; 10.2 Running and Pulling Tubing; 10.3 Preparation and Inspection before Running; 10.4 Packers Chapter 11. ENVIRONMENTAL CONSIDERATIONS FOR DRILLING OPERATIONS11.1 Introduction; 11.2 Well Site; 11.3 Environmental Regulations; 11.4 Site Assessment and Construction; 11.5 Environmental Concerns While in Operation; Index |
| Record Nr. | UNINA-9911004823303321 |
Lyons William C
|
||
| Amsterdam ; ; Boston, : Gulf Professional, c2010 | ||
| Lo trovi qui: Univ. Federico II | ||
| ||