Chemical and process plant commissioning handbook [[electronic resource] ] : a practical guide to plant system and equipment installation and commissioning / / Martin Killcross |
Autore | Killcross Martin |
Edizione | [1st ed.] |
Pubbl/distr/stampa | London, : Butterworth-Heinemann/Elsevier, 2012 |
Descrizione fisica | 1 online resource (313 p.) |
Disciplina |
660.28073
681.2 681/.2 |
Soggetto topico |
Chemical plants - Management
Chemical plants - Equipment and supplies |
Soggetto genere / forma | Electronic books. |
ISBN |
1-283-27281-4
9786613272812 0-08-097175-X |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Front Cover; Chemical and Process Plant Commissioning Handbook: A Practical Guide to Plant System and Equipment Installation and Commissioning; Copyright; Contents; Acknowledgment; Introduction; What is Commissioning?; Safety and Environmental Considerations; A Simplified Commissioning Logic; Intent and Use of the Handbook; The Commissioning Approach; Chapter 1 - Commissioning Phase One - Prepare; Appointing the Commissioning Manager; Commissioning Scope and Contracts; Contracts; Budget Estimation; Prioritized Asset Systemization; Support Design
Develop an Initial Commissioning Plan or PhilosophyAppointment, Composition of the Commissioning Team, Roles, Responsibilities and Organization Chart; Documentation and Sign-Off Requirements, the Library and Electronic Filing; Devise Assignment Details, Site and Office Requirements, Consumables and Procure Commissioning Chemicals; Create Commissioning Documents and the System File; Control, Instrument, Electrical Commissioning Document Preparation; Mechanical Commissioning Document Preparation; Develop Training Materials; Develop Standard Operating Procedures (SOPs) Develop Commissioning ScheduleDevise Handover Procedure; Devise Commissioning Tagging System; Chapter 2 - Commissioning Phase Two - Implement; Factory Acceptance Testing; Check Construction and Quality of Build; Tracking Progress and System Status; Cleaning Procedures and Drying; Pre-Commissioning Procedures; Vessel Check Sheets; Instrument Loop, Electrical and Control System Testing; Commissioning Punchlisting; Handover from Construction to Commissioning; Introduction of Safe Chemicals; Pre-Commissioning HAZOP Studies or Pre-Start-Up Safety; Commissioning Leak Testing Commissioning and Initial Start-Up Plus ProceduresHandover to Operations; Chapter 3 - Commissioning Phase Three - Close-Out; Close Out Reservations; Complete Commissioning Documentation; Complete Training and Update Documents to "As Commissioned"; Update Operating Procedures to "As Commissioned"; Assist Continued Operation, Troubleshooting and/or De-bottlenecking Projects; Close Down the Commissioning Team; Complete Close-Out Hazard Study; Chapter 4 - The Commissioning System File, a Full Catalogue of Blank Commissioning Documents; Commissioning System File; Commissioning System File System 1 System P&IDs2 Decontamination Procedure and Isolation Register; 3 System Cleaning Checklist and Procedures; 4 Hazard Study Actions; 5 Equipment Check Sheets, Off- and On-Site Checks; 6 System Punchlists; 7 Action Upon Alarm Sheet; 8 Handover Certificate Construction to Commissioning; 9 Project Documentation Check Sheet Prior to Introduction of Safe Chemicals; 10 Safe Chemical Commissioning Authorization and Pre-Commissioning Procedures; 11 Leak Test Check List and Procedure; 12 Instrument Check Sheet; 13 Motor Check Sheet; 14 Interlock Check Sheet; 15 Emergency Shut-Down Check Sheet 16 DCS Sequence Test Procedure |
Record Nr. | UNINA-9910456708403321 |
Killcross Martin | ||
London, : Butterworth-Heinemann/Elsevier, 2012 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
Chemical and process plant commissioning handbook [[electronic resource] ] : a practical guide to plant system and equipment installation and commissioning / / Martin Killcross |
Autore | Killcross Martin |
Edizione | [1st ed.] |
Pubbl/distr/stampa | London, : Butterworth-Heinemann/Elsevier, 2012 |
Descrizione fisica | 1 online resource (313 p.) |
Disciplina |
660.28073
681.2 681/.2 |
Soggetto topico |
Chemical plants - Management
Chemical plants - Equipment and supplies |
ISBN |
1-283-27281-4
9786613272812 0-08-097175-X |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Front Cover; Chemical and Process Plant Commissioning Handbook: A Practical Guide to Plant System and Equipment Installation and Commissioning; Copyright; Contents; Acknowledgment; Introduction; What is Commissioning?; Safety and Environmental Considerations; A Simplified Commissioning Logic; Intent and Use of the Handbook; The Commissioning Approach; Chapter 1 - Commissioning Phase One - Prepare; Appointing the Commissioning Manager; Commissioning Scope and Contracts; Contracts; Budget Estimation; Prioritized Asset Systemization; Support Design
Develop an Initial Commissioning Plan or PhilosophyAppointment, Composition of the Commissioning Team, Roles, Responsibilities and Organization Chart; Documentation and Sign-Off Requirements, the Library and Electronic Filing; Devise Assignment Details, Site and Office Requirements, Consumables and Procure Commissioning Chemicals; Create Commissioning Documents and the System File; Control, Instrument, Electrical Commissioning Document Preparation; Mechanical Commissioning Document Preparation; Develop Training Materials; Develop Standard Operating Procedures (SOPs) Develop Commissioning ScheduleDevise Handover Procedure; Devise Commissioning Tagging System; Chapter 2 - Commissioning Phase Two - Implement; Factory Acceptance Testing; Check Construction and Quality of Build; Tracking Progress and System Status; Cleaning Procedures and Drying; Pre-Commissioning Procedures; Vessel Check Sheets; Instrument Loop, Electrical and Control System Testing; Commissioning Punchlisting; Handover from Construction to Commissioning; Introduction of Safe Chemicals; Pre-Commissioning HAZOP Studies or Pre-Start-Up Safety; Commissioning Leak Testing Commissioning and Initial Start-Up Plus ProceduresHandover to Operations; Chapter 3 - Commissioning Phase Three - Close-Out; Close Out Reservations; Complete Commissioning Documentation; Complete Training and Update Documents to "As Commissioned"; Update Operating Procedures to "As Commissioned"; Assist Continued Operation, Troubleshooting and/or De-bottlenecking Projects; Close Down the Commissioning Team; Complete Close-Out Hazard Study; Chapter 4 - The Commissioning System File, a Full Catalogue of Blank Commissioning Documents; Commissioning System File; Commissioning System File System 1 System P&IDs2 Decontamination Procedure and Isolation Register; 3 System Cleaning Checklist and Procedures; 4 Hazard Study Actions; 5 Equipment Check Sheets, Off- and On-Site Checks; 6 System Punchlists; 7 Action Upon Alarm Sheet; 8 Handover Certificate Construction to Commissioning; 9 Project Documentation Check Sheet Prior to Introduction of Safe Chemicals; 10 Safe Chemical Commissioning Authorization and Pre-Commissioning Procedures; 11 Leak Test Check List and Procedure; 12 Instrument Check Sheet; 13 Motor Check Sheet; 14 Interlock Check Sheet; 15 Emergency Shut-Down Check Sheet 16 DCS Sequence Test Procedure |
Record Nr. | UNINA-9910781793203321 |
Killcross Martin | ||
London, : Butterworth-Heinemann/Elsevier, 2012 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|
Chemical and process plant commissioning handbook : a practical guide to plant system and equipment installation and commissioning / / Martin Killcross |
Autore | Killcross Martin |
Edizione | [1st ed.] |
Pubbl/distr/stampa | London, : Butterworth-Heinemann/Elsevier, 2012 |
Descrizione fisica | 1 online resource (313 p.) |
Disciplina |
660.28073
681.2 681/.2 |
Soggetto topico |
Chemical plants - Management
Chemical plants - Equipment and supplies |
ISBN |
1-283-27281-4
9786613272812 0-08-097175-X |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Front Cover; Chemical and Process Plant Commissioning Handbook: A Practical Guide to Plant System and Equipment Installation and Commissioning; Copyright; Contents; Acknowledgment; Introduction; What is Commissioning?; Safety and Environmental Considerations; A Simplified Commissioning Logic; Intent and Use of the Handbook; The Commissioning Approach; Chapter 1 - Commissioning Phase One - Prepare; Appointing the Commissioning Manager; Commissioning Scope and Contracts; Contracts; Budget Estimation; Prioritized Asset Systemization; Support Design
Develop an Initial Commissioning Plan or PhilosophyAppointment, Composition of the Commissioning Team, Roles, Responsibilities and Organization Chart; Documentation and Sign-Off Requirements, the Library and Electronic Filing; Devise Assignment Details, Site and Office Requirements, Consumables and Procure Commissioning Chemicals; Create Commissioning Documents and the System File; Control, Instrument, Electrical Commissioning Document Preparation; Mechanical Commissioning Document Preparation; Develop Training Materials; Develop Standard Operating Procedures (SOPs) Develop Commissioning ScheduleDevise Handover Procedure; Devise Commissioning Tagging System; Chapter 2 - Commissioning Phase Two - Implement; Factory Acceptance Testing; Check Construction and Quality of Build; Tracking Progress and System Status; Cleaning Procedures and Drying; Pre-Commissioning Procedures; Vessel Check Sheets; Instrument Loop, Electrical and Control System Testing; Commissioning Punchlisting; Handover from Construction to Commissioning; Introduction of Safe Chemicals; Pre-Commissioning HAZOP Studies or Pre-Start-Up Safety; Commissioning Leak Testing Commissioning and Initial Start-Up Plus ProceduresHandover to Operations; Chapter 3 - Commissioning Phase Three - Close-Out; Close Out Reservations; Complete Commissioning Documentation; Complete Training and Update Documents to "As Commissioned"; Update Operating Procedures to "As Commissioned"; Assist Continued Operation, Troubleshooting and/or De-bottlenecking Projects; Close Down the Commissioning Team; Complete Close-Out Hazard Study; Chapter 4 - The Commissioning System File, a Full Catalogue of Blank Commissioning Documents; Commissioning System File; Commissioning System File System 1 System P&IDs2 Decontamination Procedure and Isolation Register; 3 System Cleaning Checklist and Procedures; 4 Hazard Study Actions; 5 Equipment Check Sheets, Off- and On-Site Checks; 6 System Punchlists; 7 Action Upon Alarm Sheet; 8 Handover Certificate Construction to Commissioning; 9 Project Documentation Check Sheet Prior to Introduction of Safe Chemicals; 10 Safe Chemical Commissioning Authorization and Pre-Commissioning Procedures; 11 Leak Test Check List and Procedure; 12 Instrument Check Sheet; 13 Motor Check Sheet; 14 Interlock Check Sheet; 15 Emergency Shut-Down Check Sheet 16 DCS Sequence Test Procedure |
Record Nr. | UNINA-9910816955203321 |
Killcross Martin | ||
London, : Butterworth-Heinemann/Elsevier, 2012 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|