The Fundamentals of Corrosion and Scaling for Petroleum & Environmental Engineers [[electronic resource]] |
Autore | Chilingar George V |
Pubbl/distr/stampa | Burlington, : Elsevier Science, 2013 |
Descrizione fisica | 1 online resource (253 p.) |
Disciplina |
622
622.33820284 622/.33820284 |
Altri autori (Persone) |
MourhatchRyan
Al-QahtaniAlzazi |
Soggetto topico |
Corrosion and anti-corrosives
Oil fields -- Equipment and supplies -- Corrosion Oil fields Oil fields - Equipment and supplies - Corrosion Mechanical Engineering Engineering & Applied Sciences Metallurgy & Mineralogy |
ISBN |
0-12-799991-4
1-60119-971-6 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Front Cover; The Planning Guide to Piping Design; Copyright Page; Dedication; Table of Contents; Foreword; Preface; List of Figures; List of Tables; CHAPTER 1. Before You Begin; 1.1 Introduction; 1.2 Standards; 1.3 Specifications; 1.4 Procedures; 1.5 Piping Execution Plan; 1.6 Conclusion; CHAPTER 2. Procedures; 2.1 Introduction; 2.2 Master Stick Files, Working Copies, and Inter-discipline Drawing Reviews (IDR); 2.3 Vendor Drawing Reviews; 2.4 Line Numbering; 2.5 Stress Analysis; 2.6 Model Reviews; 2.7 Checking; 2.8 Manhour Estimating and Manpower Planning; CHAPTER 3. Deliverables
3.1 Introduction3.2 Deliverables; CHAPTER 4. Detailed Design; 4.1 Introduction; 4.2 Contracting and Procurement Plan and Construction Execution Plan; 4.3 Modularized and Field Erected Piping Splits and CWP Boundaries; 4.4 Model Boundaries; 4.5 Shop and Field Material Splits; 4.6 Procurement Splits; 4.7 Issued For Bid and Bid Evaluations; 4.8 Equipment Coordinates and Elevations; 4.9 Module Design; 4.10 Module Numbering; 4.11 Drafting Practice; 4.12 Holds; 4.13 Project Binders and Lists; 4.14 Managing Standard Drawings; 4.15 Project Meetings; 4.16 Progress Monitoring 4.17 Design Change Notice (DCN)4.18 Field Change Notice (FCN); 4.19 Request For Information (RFI); CHAPTER 5. Shop Fabrication; 5.1 Introduction; 5.2 Kick-off Meetings; 5.3 Scopes of Work (SOW); 5.4 Instruction to the Fabricator; 5.5 Requests For Information (RFI); 5.6 Visits with the Fabricators; 5.7 Automatic Spool Generation; 5.8 Conclusion; CHAPTER 6. Field Construction; 6.1 Introduction; 6.2 Support From the Home Office; 6.3 Support in the Field; 6.4 Lessons Learned; 6.5 Safety; APPENDIX A: Abbreviations; Index |
Record Nr. | UNISA-996205197703316 |
Chilingar George V | ||
Burlington, : Elsevier Science, 2013 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. di Salerno | ||
|
The Fundamentals of Corrosion and Scaling for Petroleum & Environmental Engineers |
Autore | Chilingar George V |
Pubbl/distr/stampa | Burlington, : Elsevier Science, 2013 |
Descrizione fisica | 1 online resource (253 p.) |
Disciplina |
622
622.33820284 622/.33820284 |
Altri autori (Persone) |
MourhatchRyan
Al-QahtaniAlzazi |
Soggetto topico |
Corrosion and anti-corrosives
Oil fields -- Equipment and supplies -- Corrosion Oil fields Oil fields - Equipment and supplies - Corrosion Mechanical Engineering Engineering & Applied Sciences Metallurgy & Mineralogy |
ISBN |
0-12-799991-4
1-60119-971-6 |
Formato | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione | eng |
Nota di contenuto |
Front Cover; The Planning Guide to Piping Design; Copyright Page; Dedication; Table of Contents; Foreword; Preface; List of Figures; List of Tables; CHAPTER 1. Before You Begin; 1.1 Introduction; 1.2 Standards; 1.3 Specifications; 1.4 Procedures; 1.5 Piping Execution Plan; 1.6 Conclusion; CHAPTER 2. Procedures; 2.1 Introduction; 2.2 Master Stick Files, Working Copies, and Inter-discipline Drawing Reviews (IDR); 2.3 Vendor Drawing Reviews; 2.4 Line Numbering; 2.5 Stress Analysis; 2.6 Model Reviews; 2.7 Checking; 2.8 Manhour Estimating and Manpower Planning; CHAPTER 3. Deliverables
3.1 Introduction3.2 Deliverables; CHAPTER 4. Detailed Design; 4.1 Introduction; 4.2 Contracting and Procurement Plan and Construction Execution Plan; 4.3 Modularized and Field Erected Piping Splits and CWP Boundaries; 4.4 Model Boundaries; 4.5 Shop and Field Material Splits; 4.6 Procurement Splits; 4.7 Issued For Bid and Bid Evaluations; 4.8 Equipment Coordinates and Elevations; 4.9 Module Design; 4.10 Module Numbering; 4.11 Drafting Practice; 4.12 Holds; 4.13 Project Binders and Lists; 4.14 Managing Standard Drawings; 4.15 Project Meetings; 4.16 Progress Monitoring 4.17 Design Change Notice (DCN)4.18 Field Change Notice (FCN); 4.19 Request For Information (RFI); CHAPTER 5. Shop Fabrication; 5.1 Introduction; 5.2 Kick-off Meetings; 5.3 Scopes of Work (SOW); 5.4 Instruction to the Fabricator; 5.5 Requests For Information (RFI); 5.6 Visits with the Fabricators; 5.7 Automatic Spool Generation; 5.8 Conclusion; CHAPTER 6. Field Construction; 6.1 Introduction; 6.2 Support From the Home Office; 6.3 Support in the Field; 6.4 Lessons Learned; 6.5 Safety; APPENDIX A: Abbreviations; Index |
Record Nr. | UNINA-9910338751603321 |
Chilingar George V | ||
Burlington, : Elsevier Science, 2013 | ||
Materiale a stampa | ||
Lo trovi qui: Univ. Federico II | ||
|