Vai al contenuto principale della pagina

An introduction to cut-off grade estimation [[electronic resource] /] / by Jean-Michel Rendu



(Visualizza in formato marc)    (Visualizza in BIBFRAME)

Autore: Rendu J.-M Visualizza persona
Titolo: An introduction to cut-off grade estimation [[electronic resource] /] / by Jean-Michel Rendu Visualizza cluster
Pubblicazione: Littleton, Colo., : Society for Mining, Metallurgy, and Exploration, 2008
Edizione: 1st ed.
Descrizione fisica: 1 online resource (115 p.)
Disciplina: 622/.7
Soggetto topico: Ores - Grading
Ores - Sampling and estimation
Soggetto genere / forma: Electronic books.
Note generali: Description based upon print version of record.
Nota di bibliografia: Includes bibliographical references and index.
Nota di contenuto: Cover; Title; Copyright; Contents; Preface; CHAPTER 1: Introduction; CHAPTER 2: General Principles; CHAPTER 3: Minimum Cut-off Grades; CHAPTER 4: Cut-off Grade for Polymetallic Deposits; CHAPTER 5: Cut-off Grade and Optimization of Processing Plant Operating Conditions; CHAPTER 6: Cut-off Grade and Mine Planning-Open Pit and Underground Selective Mining; CHAPTER 7: Cut-off Grade and Mine Planning- Block and Panel Caving; CHAPTER 8: Which Costs Should Be Included in Cut-off Grade Calculations?; CHAPTER 9: When Marginal Analysis No Longer Applies: A Gold Leaching Operation
CHAPTER 10: Mining Capacity and Cut-off Grade When Processing Capacity Is FixedCHAPTER 11: Processing Capacity and Cut-off Grade When Mining Capacity Is Fixed; CHAPTER 12: Mining and Processing Capacity and Cut-off Grade When Sales Volume Is Fixed; CHAPTER 13: Releasing Capacity Constraints: A Base Metal Example; CHAPTER 14: Relationship Between Mine Selectivity, Deposit Modeling, Ore Control, and Cut-off Grade; CHAPTER 15: Conclusions; Bibliography; Symbols; About the Author
Sommario/riassunto: An Introduction to Cut-off Grade Estimation examines one of the most important calculations in the mining industry. Cut-off grades are essential to determining the economic feasibility and mine life of a project. Increased cut-off grades can reduce political risks by ensuring higher financial returns over a shorter period of time. Conversely, lower cut-off grades may increase project life with longer economic benefits to shareowners, employees, and local communities. Cut-off grades also impact reported reserves, which are closely monitored by stock exchanges and regulatory agencies. Author Dr.
Titolo autorizzato: An introduction to cut-off grade estimation  Visualizza cluster
ISBN: 1-61344-066-9
0-87335-284-X
Formato: Materiale a stampa
Livello bibliografico Monografia
Lingua di pubblicazione: Inglese
Record Nr.: 9910454898503321
Lo trovi qui: Univ. Federico II
Opac: Controlla la disponibilità qui