Vai al contenuto principale della pagina
Autore: | Rendu J.-M |
Titolo: | An introduction to cut-off grade estimation [[electronic resource] /] / by Jean-Michel Rendu |
Pubblicazione: | Littleton, Colo., : Society for Mining, Metallurgy, and Exploration, 2008 |
Edizione: | 1st ed. |
Descrizione fisica: | 1 online resource (115 p.) |
Disciplina: | 622/.7 |
Soggetto topico: | Ores - Grading |
Ores - Sampling and estimation | |
Note generali: | Description based upon print version of record. |
Nota di bibliografia: | Includes bibliographical references and index. |
Nota di contenuto: | Cover; Title; Copyright; Contents; Preface; CHAPTER 1: Introduction; CHAPTER 2: General Principles; CHAPTER 3: Minimum Cut-off Grades; CHAPTER 4: Cut-off Grade for Polymetallic Deposits; CHAPTER 5: Cut-off Grade and Optimization of Processing Plant Operating Conditions; CHAPTER 6: Cut-off Grade and Mine Planning-Open Pit and Underground Selective Mining; CHAPTER 7: Cut-off Grade and Mine Planning- Block and Panel Caving; CHAPTER 8: Which Costs Should Be Included in Cut-off Grade Calculations?; CHAPTER 9: When Marginal Analysis No Longer Applies: A Gold Leaching Operation |
CHAPTER 10: Mining Capacity and Cut-off Grade When Processing Capacity Is FixedCHAPTER 11: Processing Capacity and Cut-off Grade When Mining Capacity Is Fixed; CHAPTER 12: Mining and Processing Capacity and Cut-off Grade When Sales Volume Is Fixed; CHAPTER 13: Releasing Capacity Constraints: A Base Metal Example; CHAPTER 14: Relationship Between Mine Selectivity, Deposit Modeling, Ore Control, and Cut-off Grade; CHAPTER 15: Conclusions; Bibliography; Symbols; About the Author | |
Sommario/riassunto: | An Introduction to Cut-off Grade Estimation examines one of the most important calculations in the mining industry. Cut-off grades are essential to determining the economic feasibility and mine life of a project. Increased cut-off grades can reduce political risks by ensuring higher financial returns over a shorter period of time. Conversely, lower cut-off grades may increase project life with longer economic benefits to shareowners, employees, and local communities. Cut-off grades also impact reported reserves, which are closely monitored by stock exchanges and regulatory agencies. Author Dr. |
Titolo autorizzato: | An introduction to cut-off grade estimation |
ISBN: | 1-61344-066-9 |
0-87335-284-X | |
Formato: | Materiale a stampa |
Livello bibliografico | Monografia |
Lingua di pubblicazione: | Inglese |
Record Nr.: | 9910778523703321 |
Lo trovi qui: | Univ. Federico II |
Opac: | Controlla la disponibilità qui |