LEADER 01615oam 2200421zu 450 001 996280741203316 005 20210807000259.0 010 $a0-7381-1762-5 035 $a(CKB)1000000000035771 035 $a(SSID)ssj0000996494 035 $a(PQKBManifestationID)12376315 035 $a(PQKBTitleCode)TC0000996494 035 $a(PQKBWorkID)10988020 035 $a(PQKB)10503339 035 $a(NjHacI)991000000000035771 035 $a(EXLCZ)991000000000035771 100 $a20160829d1999 uy 101 0 $aeng 135 $aur||||||||||| 181 $ctxt 182 $cc 183 $acr 200 00$a1999 IEEE Guide for the Application of Insulation Coordination 210 31$a[Place of publication not identified]$cIEEE$d1999 215 $a1 online resource (v, 60 pages) 300 $aBibliographic Level Mode of Issuance: Monograph 311 $a0-7381-1761-7 330 $aThe calculation method for selection of phase-to-ground and phase-to-phase insulation withstand voltages for equipment is presented. This guide gives methods for insulation coordination of different air-insulated systems lide transmission lines and substations. the methods of analysis are illustrated by practical examples. 606 $aElectric insulators and insulation 606 $aShielding (Electricity) 615 0$aElectric insulators and insulation. 615 0$aShielding (Electricity) 676 $a621.31937 801 0$bPQKB 906 $aDOCUMENT 912 $a996280741203316 996 $a1999 IEEE Guide for the Application of Insulation Coordination$92574777 997 $aUNISA