LEADER 01495nam2-2200433li-450 001 990000115980203316 005 20180312154637.0 010 $a3-540-16436-7 035 $a0011598 035 $aUSA010011598 035 $a(ALEPH)000011598USA01 035 $a0011598 100 $a2001991051986-------y0itay0103----ba 101 0 $aeng 102 $aGW 200 1 $aMulti-stage production planning and inventory control$fedited by S. Axsäter, Ch, Schneeweiss and E. Silver 210 $aBerlin [etc.]$cSpringer-Verlag$dcopyr. 1986 215 $aIV, 264 p.$cill.$d25 cm 225 2 $aLecture notes in economics and mathematical systems$v266 410 0$1001000331581$12001$aLecture notes in economics and mathematical systems$v266 610 1 $aproduzione$aprogrammazione 610 1 $ascorte di magazzino$acontrollo 676 $a658.787 702 1$aAxsäter,$bSven 702 1$aSchneeweiss,$bChristoph 702 1$aSilver,$bEdward 801 $aSistema bibliotecario di Ateneo dell' Università di Salerno$gRICA 912 $a990000115980203316 951 $a650 LNES (266)$b12113/CBS$c650$d00328288 959 $aBK 969 $aSCI 979 $c19910520 979 $c20001110$lUSA01$h1711 979 $c20020403$lUSA01$h1619 979 $aPATRY$b90$c20040406$lUSA01$h1609 979 $aRSIAV6$b90$c20090925$lUSA01$h0851 979 $aRSIAV6$b90$c20090925$lUSA01$h0851 996 $aMulti-Stage Production Planning and Inventory Control$9457255 997 $aUNISA