LEADER 05408nam 2200709Ia 450 001 9911019107103321 005 20200520144314.0 010 $a9786612684463 010 $a9781282684461 010 $a1282684469 010 $a9781613449202 010 $a1613449208 010 $a9781444318890 010 $a1444318896 010 $a9781444318906 010 $a144431890X 035 $a(CKB)2520000000008470 035 $a(EBL)496077 035 $a(OCoLC)593355826 035 $a(SSID)ssj0000336621 035 $a(PQKBManifestationID)11223771 035 $a(PQKBTitleCode)TC0000336621 035 $a(PQKBWorkID)10282883 035 $a(PQKB)11462997 035 $a(MiAaPQ)EBC496077 035 $a(Perlego)2757292 035 $a(EXLCZ)992520000000008470 100 $a20090807d2010 uy 0 101 0 $aeng 135 $aur|n|---||||| 181 $ctxt 182 $cc 183 $acr 200 10$aDesign risk management $econtribution to health and safety /$fStuart D. Summerhayes 210 $aChichester, West Sussex, U.K. ;$aAmes, Iowa $cBlackwell$dc2010 215 $a1 online resource (176 p.) 300 $aDescription based upon print version of record. 311 08$a9781405132756 311 08$a1405132752 320 $aIncludes bibliographical references and index. 327 $aDesign Risk Management Contribution to Health and Safety; Contents; Section 1: INTRODUCTION; Table 1.1: DESIGN FAILURES; 1.1 Major design failures in British history; 1.2 Additional Reports (The Bragg Report and HSE Research Report 218) into design failure; Table 1.2: PRINCIPAL RECOMMENDATIONS OF THE BRAGG COMMITTEE; Table 1.3: CONTRIBUTORY FACTORS TO HISTORICAL FAILURES; Section 2: PROJECT RISK MANAGEMENT AND DESIGN RISK MANAGEMENT; 2.1 Key players in project management; 2.2 Stages of the contract and their achievement; Table 2.1: CDM DUTY HOLDER ACTIONS 327 $aSection 3: CONSTRUCTION-RELATED HEALTH AND SAFETY LEGISLATION3.1 Approved code of practice and guidance; 3.2 Health and Safety at Work, etc. Act 1974; 3.3 The Management of Health and Safety at Work Regulations 1999; 3.4 The Workplace (Health, Safety and Welfare) Regulations 1992; 3.5 The Manual Handling Operations Regulations 1992; 3.6 The Confined Spaces Regulations 1997; 3.7 The Work at Height Regulations 2005; 3.8 The Control of Vibration at Work Regulations 2005; 3.9 The Control of Noise at Work Regulations 2005 327 $a3.10 The Control of Substances Hazardous to Health Regulations (amended 2005)Section 4: THE CDM PROCESS; 4.1 Timing; 4.2 Pre-construction information; Figure 4.1: HOLISTIC DIAGRAM OF THE CONSTRUCTION PROCESS; 4.3 Construction phase plan; 4.4 Health and safety file; Figure 4.2: SYSTEMS APPROACH; Table 4.1: APPLICABLE REGULATIONS FOR DUTY HOLDER COMPLIANCE; Table 4.2: CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2007; Section 5: ROLE OF THE DESIGNER; 5.1 Who are designers?; Figure 5.1: THE DESIGNER'S DUTIES; Table 5.1a: DESIGNER DUTIES (ALL PROJECTS) 327 $aTable 5.1b: DESIGNER DUTIES (ADDITIONAL DUTIES ON NOTIFIABLE PROJECTS)Section 6: THE DESIGN RISK MANAGEMENT PROCESS; 6.1 Additional interfaces; 6.2 Design change; Section 7: DOCUMENTATION; Table 7.1: RISK ASSESSMENT METHODS; Table 7.2: EXAMPLES OF POTENTIAL HAZARDS FOR DESIGNERS TO CONSIDER; 7.1 Red, amber and green lists; Table 7.3: DESIGN RISK ASSESSMENT; Figure 7.1: EXAMPLE OF A DESIGN RISK ASSESSMENT PROFORMA; Figure 7.2: ANNOTATED NOTES (HEALTH AND SAFETY) ON DRAWING; Figure 7.3: HAZARD MANAGEMENT REGISTER AND DESIGN RISK ASSESSMENT; 7.2 Project (health and safety) risk register 327 $aTable 7.4: PROJECT RISK REGISTER (HEALTH AND SAFETY)7.3 Design philosophy statements; Section 8: INFORMATION FLOW; Table 8.1: COMMUNICATION LINKS; 8.1 Pre-construction information; Figure 8.1: INFORMATION FLOW; Figure 8.2: DESIGN INTERFACE WITH OTHER DUTY HOLDERS; 8.2 Construction phase plan; 8.3 Health and safety file; Table 8.2: DESIGN INFORMATION FOR THE HEALTH AND SAFETY FILE; Figure 8.3: PLANNING/PROGRAMMING INTEGRATION; Appendix One: ROADMAP; Appendix Two: REFERENCES AND BIBLIOGRAPHY; Appendix Three: WEB PAGE DIRECTORY 327 $aAppendix Four: WORKPLACE (HEALTH, SAFETY AND WELFARE) REGULATIONS 1992 330 $aThe Construction (Design and Management) Regulations 2007 (CDM Regulations 2007) is a revision of a major piece of legislation within the wide portfolio of construction-related legislation. It seeks to improve the long term health and safety performance of the UK construction industry, with ownership of health and safety proactively undertaken by the integrated project team. Good design has always embraced health and safety issues and design teams remain essential players as well as key contributors and communicators in matters of health and safety management. Designers have a legal responsi 606 $aConstruction industry$xSafety measures 606 $aSafety factor in engineering 606 $aArchitecture$xHuman factors 615 0$aConstruction industry$xSafety measures. 615 0$aSafety factor in engineering. 615 0$aArchitecture$xHuman factors. 676 $a690/.22 700 $aSummerhayes$b Stuart$0879121 801 0$bMiAaPQ 801 1$bMiAaPQ 801 2$bMiAaPQ 906 $aBOOK 912 $a9911019107103321 996 $aDesign risk management$92198424 997 $aUNINA