LEADER 01601nam 2200541 450 001 9910796420903321 005 20200520144314.0 010 $a0-12-804119-6 035 $a(CKB)3820000000017709 035 $a(EBL)4188293 035 $a(SSID)ssj0001634985 035 $a(PQKBManifestationID)16387631 035 $a(PQKBTitleCode)TC0001634985 035 $a(PQKBWorkID)14950750 035 $a(PQKB)11008600 035 $a(Au-PeEL)EBL4188293 035 $a(CaPaEBR)ebr11128654 035 $a(CaONFJC)MIL881649 035 $a(OCoLC)934622389 035 $a(MiAaPQ)EBC4188293 035 $a(PPN)193662981 035 $a(EXLCZ)993820000000017709 100 $a20160104h20162016 uy 0 101 0 $aeng 135 $aur|n|---||||| 181 $ctxt 182 $cc 183 $acr 200 10$aCuban blindness $ediary of a mysterious epidemic neuropathy /$fGustavo C. Roma?n 210 1$aAmsterdam, [Netherlands] :$cAcademic Press,$d2016. 210 4$dİ2016 215 $a1 online resource (196 p.) 300 $aDescription based upon print version of record. 311 $a0-12-804083-1 320 $aIncludes bibliographical references at the end of each chapters and index. 606 $aBlindness$zCuba$xEpidemiology 606 $aEpidemics$zCuba 615 0$aBlindness$xEpidemiology. 615 0$aEpidemics 676 $a617.712 700 $aRoma?n$b Gustavo C.$01465498 801 0$bMiAaPQ 801 1$bMiAaPQ 801 2$bMiAaPQ 906 $aBOOK 912 $a9910796420903321 996 $aCuban blindness$93675508 997 $aUNINA LEADER 04849nam 2200589Ia 450 001 9911006701003321 005 20200520144314.0 010 $a1-281-07776-3 010 $a9786611077761 010 $a0-08-050600-3 035 $a(CKB)111087028125514 035 $a(EBL)316868 035 $a(OCoLC)191727598 035 $a(SSID)ssj0000071895 035 $a(PQKBManifestationID)11123243 035 $a(PQKBTitleCode)TC0000071895 035 $a(PQKBWorkID)10091077 035 $a(PQKB)10310672 035 $a(MiAaPQ)EBC316868 035 $a(EXLCZ)99111087028125514 100 $a20060601d1999 uy 0 101 0 $aeng 135 $aur|n|---||||| 181 $ctxt 182 $cc 183 $acr 200 10$aEstimator's piping man-hour manual /$fJohn S. Page 205 $a5th ed. 210 $aHouston, TX $cGulf Professional Pub.$dc1999 215 $a1 online resource (267 p.) 300 $aDescription based upon print version of record. 311 $a0-88415-259-6 327 $aFront Cover; ESTIMATOR'S PIPING MAN-HOUR MANUAL; Copyright Page; CONTENTS; Insulation; Hand Excavate; Preface; The Human Factor in Estimating; Introduction; Section Introduction; SECTION ONE: SHOP FABRICATION OF PIPE AND FITTINGS; Shop Handling Scheduled Pipe for Fabrication; Shop Handling Large O.D. Pipe for Fabrication; Notes On Pipe Bends; Standard Types of Bends; Pipe Bends-Schedule 20 to 100 Inclusive; Pipe Bends-Schedule 120, 140 and 160; Pipe Bends-Heavy Wall-45° or Less; Pipe Bends-Heavy Wall-Over 45° to 90° Inclusive; Pipe Bends-Large O.D. Sizes; Attaching Flanges-Screwed Type 327 $aAttaching Flanges-Screwed TypeAttaching Flanges-Screwed Type; Attaching Flanges-Slip-On Type; Attaching Flanges-Weld Neck Type; Attaching Orifice Flanges-Slip-On and Threaded Types; Attaching Orifice Flanges-Weld Neck Type; General Welding Notes; Butt Welds-Inert Gas Shielded Root Pass; Machine Butt Welds; Manual Butt Welds-Scheduled; Manual Heavy Wall Butt Welds; Manual Large O.D. Butt Welds; 90° Welded Nozzles; 90° Welded Nozzles-Reinforced; Large O.D. 90° Nozzle Welds; Large O.D. 90° Nozzle Welds-Reinforced; 45° Welded Nozzles; 45° Welded Nozzles-Reinforced; Large O.D. 45° Nozzle Welds 327 $aLarge O.D. 45° Nozzle Welds-ReinforcedConcentric Swedged Ends; Eccentric Swedged Ends; End Closures-Pressure Type; Heavy Wall End Closure-Pressure Type; Large O.D. Pipe End Closures-Pressure Type; 90° Coupling Welds and Socket Welds; 'Olet Type Welds; Flame Cutting Pipe-Scheduled; Flame Cutting Pipe-Heavy Wall; Flame Cutting Pipe-Large O.D. Sizes; Machine Cutting Pipe-Scheduled; Machine Cutting Pipe-Heavy Wall; Machine Cutting Pipe-Large O.D. Sizes; Flame Beveling Pipe-""V"" Type; Machine Beveling Pipe-""U"" Type, ""V"" Type and Double Angle; Beveling Heavy Wall Pipe; Beveling Large O.D. Pipe 327 $aThreading Pipe-Including CutWelded Carbon Steel Attachments; Drilling Holes in Welded Attachments; Machining Inside of Pipe; Machining Inside of Large O.D. Pipe; Boring Inside Diameter of Pipe and Installing Straightening Vanes; Installing Flow Nozzles; Preheating Butt Welds and Any Type Flange Welds; Preheating Heavy Wall Pipe Butt Welds; Preheating Large O.D. Pipe Butt Welds; Preheating 90° Nozzle Welds; Preheating Large O.D. 90° Nozzle Welds; Local Stress Relieving-Scheduled; Local Stress Relieving-Heavy Wall; Local Stress Relieving-Large O.D. Sizes 327 $aFull Furnace Stress Relieving and Heating TreatmentRadiographic Inspection-Scheduled; Radiographic Inspection-Heavy Wall; Radiographic Inspection-Large O.D. Sizes; Magnetic or Dye Penetrant Inspection of Welded Joints; Magnetic or Dye Penetrant Inspection of Welded Joints; Testing Fabricated Assemblies-Flanged Ends; Testing Fabricated Assemblies-Plain or Beveled Ends; Testing Fabricated Assemblies-Heavy Wall; Access Holes; Miscellaneous Fabrication Operations; Man Hours Per Foot of Cylindrical Coil Fabrication Bending Only; SECTION TWO: FIELD FABRICATION AND ERECTION; Section Introduction 327 $aHandling and Erecting Straight Run Pipe-Scheduled 330 $aThis reference provides reliable piping estimating data including installation of pneumatic mechanical instrumentation used in monitoring various process systems. This new edition has been expanded and updated to include installation of pneumatic mechanical instrumentation, which is used in monitoring various process systems. 606 $aPipe fitting$xEstimates$zUnited States 606 $aLabor time 615 0$aPipe fitting$xEstimates 615 0$aLabor time. 676 $a696/.2 700 $aPage$b John S$0127704 801 0$bMiAaPQ 801 1$bMiAaPQ 801 2$bMiAaPQ 906 $aBOOK 912 $a9911006701003321 996 $aEstimator's piping man-hour manual$94390406 997 $aUNINA