LEADER 04832nam 2200637 a 450 001 9910815660103321 005 20230421050631.0 010 $a1-60086-246-2 010 $a1-60086-118-0 035 $a(CKB)2550000000072658 035 $a(EBL)3111549 035 $a(SSID)ssj0000566034 035 $a(PQKBManifestationID)12169300 035 $a(PQKBTitleCode)TC0000566034 035 $a(PQKBWorkID)10533784 035 $a(PQKB)10722473 035 $a(MiAaPQ)EBC3111549 035 $a(Au-PeEL)EBL3111549 035 $a(CaPaEBR)ebr10516653 035 $a(OCoLC)922978799 035 $a(EXLCZ)992550000000072658 100 $a19950515d1996 uy 0 101 0 $aeng 135 $aurcn||||||||| 181 $ctxt 182 $cc 183 $acr 200 10$aStructural loads analysis for commercial transport aircraft$b[electronic resource] $etheory and practice /$fTed L. Lomax 210 $aReston, Va. $cAmerican Institute of Aeronautics and Astronautics$dc1996 215 $a1 online resource (297 p.) 225 1 $aAIAA education series 300 $aDescription based upon print version of record. 311 $a1-56347-114-0 320 $aIncludes bibliographical references and index. 327 $a""Cover""; ""Title""; ""Copyright""; ""Table of Contents""; ""Preface""; ""Nomenclature""; ""Chapter 1. Introduction""; ""1.1 Applicability of the Analysis""; ""1.2 Criteria""; ""1.3 Methodogy""; ""1.4 Static Aeroelastic Phenomena""; ""1.5 Sign Convention""; ""Chapter 2. Symmetrical Maneuvering Flight""; ""2.1 Symmetrical Maneuvering Flight Definition""; ""2.2 Symmetrical Maneuver Load Factors""; ""2.3 Steady-State Symmetrical Maneuvers""; ""2.4 Abrupt Pitching Maneuvers""; ""2.5 Abrupt Unchecked Pitch Maneuvers""; ""2.6 Abrupt Checked Maneuvers (Commercial Requirements)"" 327 $a""2.7 Abrupt Checked Maneuvers (Military Requirements)""""2.8 Minimum Pitch Acceleration Requirements""; ""Chapter 3. Rolling Maneuvers""; ""3.1 Parameters Required for Structural Load Analyses""; ""3.2 Symmetrical Load Factors for Rolling Maneuvers""; ""3.3 Control Surface Deflections for Rolling Maneuvers""; ""3.4 Equations of Motion for Rolling Maneuvers""; ""3.5 Maximum Rolling Acceleration and Velocity Criteria""; ""3.6 Roll Termination Condition""; ""3.7 Nonlinear Lateral Control Inputs""; ""3.8 Aeroelastic Effects""; ""Chapter 4. Yawing Maneuvers"" 327 $a""4.1 Parameters Required for Structural Load Analyses""""4.2 Rudder Maneuver Requirements FAR 25 Criteria""; ""4.3 Engine-Out Maneuver Requirements FAR 25 Criteria""; ""4.4 Equations of Motion for Yawing Maneuvers""; ""Chapter 5. Flight in Turbulence""; ""5.1 Sharp-Edge Gust Criteria Based on Wing Loading""; ""5.2 Revised Gust Criteria Using Airplane Mass Ratio""; ""5.3 FAR/JAR Discrete Gust Design Criteria""; ""5.4 Continuous Turbulence Gust Loads Criteria""; ""5.5 Vertical Discrete Gust Considerations""; ""5.6 Transient Lift Functions"" 327 $a""5.7 Vertical Gust Continuous Turbulence Considerations""""5.8 Multiple DOF Analyses""; ""5.9 Lateral Gust Considerations""; ""5.10 Oblique Gusts""; ""5.11 Head-On Gusts""; ""Chapter 6. Landing Loads""; ""6.1 Criteria per FAR/JAR 25.473""; ""6.2 Landing Speed Calculations""; ""6.3 Two-Point Landing Conditions""; ""6.4 Three-Point Landing Conditions""; ""6.5 One-Gear Landing Conditions""; ""6.6 Side Load Conditions""; ""6.7 Rebound Landing Conditions""; ""6.8 Landing Gear Shock Absorption and Drop Tests""; ""6.9 Elastic Airplane Analysis""; ""6.10 Automatic Ground Spoilers"" 327 $a""Chapter 7. Ground-Handling Loads""""7.1 Ground-Handling Conditions""; ""7.2 Static Load Conditions""; ""7.3 Taxi, Takeoff, and Landing Roll Conditions""; ""7.4 Braked-Roll Conditions""; ""7.5 Refused Takeoff Considerations""; ""7.6 Turning Conditions""; ""7.7 Towing Conditions""; ""7.8 Jacking Loads per FAR/JAR 25.519""; ""7.9 Tethering Problem""; ""Chapter 8. Horizontal Tail Loads""; ""8.1 Horizontal Tail Design Load Envelopes""; ""8.2 Balanced Maneuver Analysis""; ""8.3 Abrupt Unchecked Elevator Conditions""; ""8.4 Checked Maneuver Conditions""; ""8.5 Vertical Gust Conditions"" 327 $a""8.6 Unsymmetrical Load Conditions"" 410 0$aAIAA education series. 606 $aAirframes$xDesign and construction 606 $aStructural dynamics 606 $aTransport planes$xDesign and construction 615 0$aAirframes$xDesign and construction. 615 0$aStructural dynamics. 615 0$aTransport planes$xDesign and construction. 676 $a629.134/31 700 $aLomax$b Ted L$0501804 801 0$bMiAaPQ 801 1$bMiAaPQ 801 2$bMiAaPQ 906 $aBOOK 912 $a9910815660103321 996 $aStructural loads analysis for commercial transport aircraft$9727734 997 $aUNINA