LEADER 05306nam 2200625Ia 450 001 9910809037203321 005 20200520144314.0 010 $a1-281-31869-8 010 $a9786611318697 010 $a0-470-69078-X 010 $a0-470-68050-4 035 $a(CKB)1000000000408223 035 $a(EBL)350994 035 $a(OCoLC)297975207 035 $a(SSID)ssj0000291083 035 $a(PQKBManifestationID)11212193 035 $a(PQKBTitleCode)TC0000291083 035 $a(PQKBWorkID)10248379 035 $a(PQKB)11744527 035 $a(MiAaPQ)EBC350994 035 $a(Au-PeEL)EBL350994 035 $a(CaPaEBR)ebr10233256 035 $a(CaONFJC)MIL131869 035 $a(EXLCZ)991000000000408223 100 $a20040317d2002 uy 0 101 0 $aeng 135 $aurcn||||||||| 181 $ctxt$2rdacontent 182 $cc$2rdamedia 183 $acr$2rdacarrier 200 10$aCDM regulations $eprocedures manual /$fStuart D. Summerhayes 205 $a2nd ed. 210 $aOxford, UK ;$aMalden, MA $cBlackwell Pub.$d2002 215 $a1 online resource (176 pages) 311 0 $a1-4051-0740-5 320 $aIncludes bibliographical references [p. 163] and index. 327 $aCDM Regulations Procedures Manual; Contents; Section 1 Introduction; How the manual works; Section 2 CDM Compliance - Or Not?; Section 3 The Client; 3.1 Client flowchart; 3.2 Client checklist; 1 Appointment of agent; 2 Appointment of planning supervisor; Competence; Allocation of adequate resources; 3 Service agreement; 4 F10 notification (initial); Relevant information; 6 Appointment of designers; Competence; Allocation of adequate resources; 7 Appointment of principal contractor; Competence; Allocation of adequate resources; 8 F10 notification (final) 327 $a9 Construction phase health and safety plan 10 Health and safety file; Confirmation of receipt; 11 Availability of health and safety file; 12 Transfer of health and safety file; Section 4 The Planning Supervisor; 4.1 Planning supervisor flowchart; 4.2 Planning supervisor checklist; 1 Service agreement; 2 F10 notification (initial); 3 Relevant information; 4 Designer; Competence; Allocation of adequate resources; 5 Confirmation of competence and resources; 6 Design considerations; 7 Adequate information; 8 Cooperation between designers; 9 Risk assessments; 10 Pre-tender health and safety plan 327 $a11 Contractor Competence; 12 Confirmation of competence; 13 Allocation of adequate resources; 14 Confirmation of adequacy of resources; 15 F10 notification (additional); Copy to principal contractor; Copy to client; 16 Construction phase health and safety plan; 17 Confirmation of suitability; 18 Health and safety agenda item; 19 Health and safety file preparation; 20 Delivery of health and safety file; 21 Confirmation of receipt of health and safety file; Section 5 The Designer; 5.1 Designer flowchart; 5.2 Designer checklist; 1 Competence/adequacy of resources questionnaire; 2 Client's duties 327 $a3 Design consideration 4 Adequate information; 5 Cooperation; 6 Risk assessments; 7 Variation orders; 8 Information to planning supervisor; 9 'As-built' record drawings; 10 Post-construction liability; Section 6 The Principal Contractor; 6.1 Principal contractor flowchart; 6.2 Principal contractor checklist; 1 Competence questionnaire; 2 Pre-tender health and safety plan; 3 Tender submission; 4 Allocation of adequate resources; 5 Minutes of resource meeting; 6 F10 notification (additional); 7 Construction phase health and safety plan; 8 Commencement of Construction (sanction to start) 327 $a9 Cooperation between contractors 10 Compliance with rules; 11 Trespass/security; 12 F10 notification-display; 13 Relevant information for planning supervisor; 14 Directions to contractors; 15 Site rules; 16 Information - to contractor; 17 Information - from contractor to employee; 18 Employees and self-employed - discussions and advice; 19 Arrangements for coordination of views; 20 Health and safety file; Section 7 The Contractor; 7.1 Contractor flowchart; 7.2 Contractor checklist; 1 Competence questionnaire; 2 Pre-tender health and safety plan; 3 Allocation of adequate resources; 4 Notification of relevant information 330 $aThe Construction (Design and Management) Regulations require all those involved in construction to adopt an integrated approach to health and safety management. Clients, designers and contractors, as well as planning supervisors, must now work together to ensure that health and safety management issues are considered throughout all phases of a project. Appropriate procedures must be established to ensure that documentation is clear and a structured approach is adopted by all those involved in a project to ensure that the requirements of the regulations are complied with. 606 $aConstruction industry$xSafety regulations$zGreat Britain 606 $aConstruction industry 615 0$aConstruction industry$xSafety regulations 615 0$aConstruction industry. 676 $a343.41/078624 700 $aSummerhayes$b Stuart$0879121 801 0$bMiAaPQ 801 1$bMiAaPQ 801 2$bMiAaPQ 906 $aBOOK 912 $a9910809037203321 996 $aCDM regulations$91963222 997 $aUNINA