LEADER 03636nam 2200637 450 001 9910797801403321 005 20230807193344.0 010 $a3-11-037541-9 010 $a3-11-039635-1 024 7 $a10.1515/9783110375411 035 $a(CKB)3710000000482387 035 $a(EBL)4006816 035 $a(SSID)ssj0001596095 035 $a(PQKBManifestationID)16295149 035 $a(PQKBTitleCode)TC0001596095 035 $a(PQKBWorkID)14884802 035 $a(PQKB)11604684 035 $a(MiAaPQ)EBC4006816 035 $a(DE-B1597)429445 035 $a(OCoLC)948656356 035 $a(DE-B1597)9783110375411 035 $a(Au-PeEL)EBL4006816 035 $a(CaPaEBR)ebr11116713 035 $a(CaONFJC)MIL838190 035 $a(OCoLC)923336881 035 $a(EXLCZ)993710000000482387 100 $a20151117h20152015 uy 0 101 0 $aeng 135 $aurnnu---|u||u 181 $ctxt 182 $cc 183 $acr 200 00$aPost-occupancy evaluation of library buildings /$fedited on behalf of IFLA by Karen Latimer and Dorothea Sommer 210 1$aBerlin, [Germany] ;$aBoston, [Massachusetts] :$cDe Gruyter Saur,$d2015. 210 4$d©2015 215 $a1 online resource (256 p.) 225 1 $aIFLA Publications,$x0344-6891 ;$vVolume 169 300 $aDescription based upon print version of record. 311 $a3-11-037521-4 327 $tFront matter --$tContents --$tAbout IFLA --$tIntroduction --$t1 Welcoming, flexible, and state of the art --$t2 Working with focus groups as a part of a post-occupancy evaluation (POE) at the German National Library of Science 2 and Technology / University Library Hannover (TIB/UB) --$t3 How to improve existing library buildings after evaluation --$t4 Post-occupancy evaluation of ten public libraries in Barcelona Province --$t5 A Review of post-occupancy evaluation of libraries in Taiwan from the perspective of the architecture profession --$t6 Post-occupancy evaluation: Fayetteville Public Library --$t7 The Law Library of Martin Luther University Halle-Wittenberg, Germany revisited --$t8 The ?Berlin Brain? --$t9 The McClay Library at Queen?s University Belfast --$t10 A Case study on a post-occupancy evaluation of the new Helsinki University Main Library --$tQuestionnaire about library buildings: characteristics ? operation ? evaluation --$tQuestionnaire sur les bâtiments de bibliothèques: caractéristiques ? fonctionnement ? évaluation --$tFragenkatalog zu Bibliotheksgebäuden: Kennzeichen ? Betrieb ? Evaluation --$tCuestionario sobre edificios de biblioteca: caracteristicas ? uso ? evaluación --$tContributors 330 $aArchitectural realisation of a building and its opening to the public with a range of services are central components of the building and design process of libraries. Post-Occupancy Evaluation (POE) is the final step in this process. It provides a opportunity to assess whether the construction and design of the building has indeed met the library's and users' requirements and how effectively the building functions. 410 0$aIFLA publications ;$vVolume 169. 606 $aLibraries$xSpace utilization 606 $aLibrary buildings$xDesign and construction 615 0$aLibraries$xSpace utilization. 615 0$aLibrary buildings$xDesign and construction. 676 $a022.3 702 $aLatimer$b Karen 702 $aSommer$b Dorothea 801 0$bMiAaPQ 801 1$bMiAaPQ 801 2$bMiAaPQ 906 $aBOOK 912 $a9910797801403321 996 $aPost- occupancy evaluation of library buildings$91502878 997 $aUNINA