LEADER 01528nam 2200337 450 001 9910729782903321 005 20230801181048.0 035 $a(CKB)5600000000605884 035 $a(NjHacI)995600000000605884 035 $a(EXLCZ)995600000000605884 100 $a20230801d2023 uy 0 101 0 $aeng 135 $aur||||||||||| 181 $ctxt$2rdacontent 182 $cc$2rdamedia 183 $acr$2rdacarrier 200 10$aDecentralized scheduling of discrete production systems with limited buffers /$fOlaf Zimmermann 210 1$aKarlsruhe, Baden :$cKIT Scientific Publishing,$d2023. 215 $a1 online resource (210 pages) 311 $a1000157036 330 $aModern production systems have become more flexible and agile. For them, a suitable control and planning method is needed. Agent-based systems offer the required characteristics. The contributions of these work are a remodeling of the Shifting Bottleneck heuristic to include limited buffers, the development of a decentralized multi-agent system for production planning, and the adaptation of the heuristic to the agent system. It concludes with evaluations of real-world production systems. 606 $aProduction planning 615 0$aProduction planning. 676 $a658.5 700 $aZimmermann$b Olaf $01378209 801 0$bNjHacI 801 1$bNjHacl 906 $aBOOK 912 $a9910729782903321 996 $aDecentralized scheduling of discrete production systems with limited buffers$93416389 997 $aUNINA