LEADER 01282oam 2200385 450 001 9910715914803321 005 20210426104517.0 035 $a(CKB)5470000002516951 035 $a(OCoLC)1247122517 035 $a(EXLCZ)995470000002516951 100 $a20210422d1981 ua 0 101 0 $aeng 135 $aur||||||||||| 181 $ctxt$2rdacontent 182 $cc$2rdamedia 183 $acr$2rdacarrier 200 00$aSafety concerns associated with pipe breaks in the BWR scram system 210 1$aWashington, D.C. :$cUnited States Nuclear Regulatory Commission,$d1981. 215 $a1 online resource 225 1 $aGeneric letter ;$v81-20 300 $a"Apr 10, 1981." 517 3 $aSafety concerns associated with pipe breaks in the boiling water reactor scram system 606 $aBoiling water reactors$xSafety measures 606 $aBoiling water reactors$xPiping 615 0$aBoiling water reactors$xSafety measures. 615 0$aBoiling water reactors$xPiping. 712 02$aU.S. Nuclear Regulatory Commission, 801 0$bGPO 801 1$bGPO 801 2$bOCLCO 801 2$bGPO 906 $aBOOK 912 $a9910715914803321 996 $aSafety concerns associated with pipe breaks in the BWR scram system$93311054 997 $aUNINA