LEADER 01324oam 2200373 450 001 9910715021403321 005 20201214160438.0 035 $a(CKB)5470000002507793 035 $a(OCoLC)1224312853 035 $a(EXLCZ)995470000002507793 100 $a20201127d1986 ua 0 101 0 $aeng 135 $aurbn||||||||| 181 $ctxt$2rdacontent 182 $cc$2rdamedia 183 $acr$2rdacarrier 200 00$aFailure of lifting rig attachment while lifting the upper guide structure at St Lucie Unit 1 210 1$aWashington, DC :$cUnited States Nuclear Regulatory Commission, Office of Inspection and Enforcement,$d1986. 215 $a1 online resource 225 1 $aInformation notice ;$vno. 86-06 300 $a"February 3, 1986." 606 $aNuclear power plants$zUnited States$xDesign and construction 606 $aLifting and carrying 615 0$aNuclear power plants$xDesign and construction. 615 0$aLifting and carrying. 712 02$aU.S. Nuclear Regulatory Commission.$bOffice of Inspection and Enforcement, 801 0$bGPO 801 1$bGPO 801 2$bOCLCO 801 2$bGPO 906 $aBOOK 912 $a9910715021403321 996 $aFailure of lifting rig attachment while lifting the upper guide structure at St Lucie Unit 1$93283384 997 $aUNINA