LEADER 00840nam0-22002771i-450- 001 990005967200403321 005 19980601 035 $a000596720 035 $aFED01000596720 035 $a(Aleph)000596720FED01 035 $a000596720 100 $a19980601d1952----km-y0itay50------ba 105 $a--------00-yy 200 1 $aEmission de obligaciones y proteccion de los obligacionistas$fJose Jgnacio De Arrilaga. 210 $aMadrid$cEd. Revista de derecho privado$d1952 215 $a337 p.$d22 cm 676 $a346.02 700 1$aArrillaga,$bJosé Ignacio : de$0404208 801 0$aIT$bUNINA$gRICA$2UNIMARC 901 $aBK 912 $a990005967200403321 952 $aVIII H 240$b41970$fFGBC 959 $aFGBC 996 $aEmission de obligaciones y proteccion de los obligacionistas$9582302 997 $aUNINA DB $aGIU01 LEADER 02025oam 2200469Ia 450 001 9910697125903321 005 20230902161910.0 035 $a(CKB)5470000002385656 035 $a(OCoLC)650524751 035 $a(EXLCZ)995470000002385656 100 $a20100728d2010 ua 0 101 0 $aeng 135 $aurmn||||||||| 181 $ctxt$2rdacontent 182 $cc$2rdamedia 183 $acr$2rdacarrier 200 10$aAnalysis and computational predictions of CHF position and post-CHF heat transfer$b[electronic resource] /$fprepared by B. Belhouachi, S.P. Walker, G.F. Hewitt 210 1$aWashington, DC :$cU. S. Nuclear Regulatory Commission,$d[2010] 215 $a1 online resource (30 pages (various pagings)) $cillustrations (some color) 225 1 $aInternational agreement report ;$vNUREG/IA-0236 300 $aTitle from PDF title screen (viewed July 28, 2010). 300 $a"Prepared as part of The Agreement on Research Participation and Technical Exchange Under the Thermal-Hydraulic Code Applications and Maintenance Program (CAMP)." 300 $a"A. Calvo, NRC Project Manager. " 300 $a"May 2010." 320 $aIncludes bibliographical references (pages 5-1 - 5-2). 410 0$aInternational agreement report ;$vNUREG/IA-0236. 606 $aPressurized water reactors$xCritical heat flux$xComputer simulation 606 $aTrace elements$xAnalysis$xComputer simulation 615 0$aPressurized water reactors$xCritical heat flux$xComputer simulation. 615 0$aTrace elements$xAnalysis$xComputer simulation. 700 $aBelhouachi$b B$01400434 701 $aWalker$b S. P$01400435 701 $aHewitt$b G. F$g(Geoffrey Frederick)$0151698 701 $aCalvo$b A$01391364 712 02$aU.S. Nuclear Regulatory Commission. 801 0$bGPO 801 1$bGPO 801 2$bGPO 906 $aBOOK 912 $a9910697125903321 996 $aAnalysis and computational predictions of CHF position and post-CHF heat transfer$93467354 997 $aUNINA LEADER 02604oam 2200685 450 001 9910707489003321 005 20160810134336.0 035 $a(CKB)5470000002464634 035 $a(OCoLC)761140225 035 $a(EXLCZ)995470000002464634 100 $a20111115j198011 ua 0 101 0 $aeng 135 $aurbn||||||||| 181 $ctxt$2rdacontent 182 $cc$2rdamedia 183 $acr$2rdacarrier 200 10$aUser's manual for MMLE3, a general FORTRAN program for maximum likelihood parameter estimation /$fRichard E. Maine and Kenneth W. Iliff 210 $a[Washington, D.C.] $cNational Aeronautics and Space Administration, Scientific and Technical Information Branch$dNovember 1980 215 $a1 online resource (iv, 85 pages) $cillustrations 225 1 $aNASA technical paper ;$v1563 300 $aTitle from title screen (viewed on Aug. 10, 2016). 300 $a"November 1980." 300 $a"Performing Organization: NASA Dryden Flight Research Center"--Report documentation page. 320 $aIncludes bibliographical references (pages 80-83). 606 $aAircraft design$2nasat 606 $aAircraft stability$2nasat 606 $aFORTRAN$2nasat 606 $aMaximum likelihood estimates$2nasat 606 $aUser manuals (computer programs)$2nasat 606 $aAerodynamics$xMathematical models$2fast 606 $aAirplanes$xFlight testing$xMathematical models$2fast 606 $aFORTRAN (Computer program language)$2fast 606 $aStability of airplanes$2fast 608 $aHandbooks and manuals.$2fast 615 7$aAircraft design. 615 7$aAircraft stability. 615 7$aFORTRAN. 615 7$aMaximum likelihood estimates. 615 7$aUser manuals (computer programs) 615 7$aAerodynamics$xMathematical models. 615 7$aAirplanes$xFlight testing$xMathematical models. 615 7$aFORTRAN (Computer program language) 615 7$aStability of airplanes. 700 $aMaine$b Richard E.$013446 702 $aIliff$b Kenneth W. 712 02$aHugh L. Dryden Flight Research Center. 712 02$aUnited States.$bNational Aeronautics and Space Administration.$bScientific and Technical Information Branch, 801 0$bOCLCE 801 1$bOCLCE 801 2$bOCLCQ 801 2$bOCLCF 801 2$bOCLCQ 801 2$bOCLCO 801 2$bOCL 801 2$bOCLCO 801 2$bGPO 906 $aBOOK 912 $a9910707489003321 996 $aUser's manual for MMLE3, a general FORTRAN program for maximum likelihood parameter estimation$93536258 997 $aUNINA LEADER 11005oam 22005893 450 001 9910795826803321 005 20220831094645.0 010 $a9781118347218$b(electronic bk.) 010 $z9781118347232 035 $a(MiAaPQ)EBC1564597 035 $a(Au-PeEL)EBL1564597 035 $a(CaPaEBR)ebr10809707 035 $a(CaONFJC)MIL546880 035 $a(OCoLC)906128733 035 $a(EXLCZ)9917692656000041 100 $a20220831d2014 uy 0 101 0 $aeng 135 $aurcnu|||||||| 181 $ctxt$2rdacontent 182 $cc$2rdamedia 183 $acr$2rdacarrier 200 10$aManaging Risk in Construction Projects 205 $a3rd ed. 210 1$aHoboken :$cJohn Wiley & Sons, Incorporated,$d2014. 210 4$d©2014. 215 $a1 online resource (254 pages) 311 08$aPrint version: Smith, Nigel J. Managing Risk in Construction Projects Hoboken : John Wiley & Sons, Incorporated,c2014 9781118347232 327 $aCover -- Title Page -- Copyright -- Contents -- Preface -- Authors' Biographies -- Acknowledgements -- Chapter 1 Projects and Risk -- 1.1 Construction projects -- 1.2 Decision making -- 1.3 Risk management strategy -- 1.4 Project planning -- 1.5 Summary -- Chapter 2 The Project Environment -- 2.1 Projects -- 2.2 The project constitution -- 2.3 Project organisation -- Single discipline projects -- Multidiscipline projects -- 2.4 Project phases -- 2.5 Effect of project phase on risk -- 2.6 Project appraisal -- 2.7 Summary -- Chapter 3 Understanding the Human Aspects -- 3.1 Risk management-context -- 3.2 Risk management-organisations -- 3.3 The risk management process -- 3.4 Some guidelines to the risk management process -- 3.5 The risk workshop -- Preparation -- Warm up exercise 1 -- Warm up exercise 2 -- Risk identification -- Quantification -- 3.6 Communication -- 3.7 Summary -- Reference -- Chapter 4 Qualitative Methods and Soft Systems Methodology -- 4.1 Qualitative risk assessment -- 4.2 Review of project programmes and budgets -- 4.3 The risk log -- 4.4 Using a risk log to formulate risk management strategy -- 4.5 Qualitative methods -- 4.6 Soft systems methodology -- 4.7 Case study: SSM in use in the procurement of construction projects -- Technical and environmental -- Commercial and operational -- Root definitions -- Root definition 1: procurement of microtunnelling projects -- Root definition 2: payment of contractors -- Root definition 3: management of construction risk -- Root definition 4: operation of construction plant -- Proposed risk allocation strategy -- 4.8 Summary -- Chapter 5 Risk and Value Management -- 5.1 Introduction -- 5.2 Approaches to the management of risk -- Informal approach to the management of risk -- Formal approach to the management of risk -- Qualitative risk assessment -- Quantitative risk assessment. 327 $a5.3 The standard risk management model -- 5.4 Applying risk and value management -- 5.5 Value management processes -- Value identification -- Value planning -- 5.6 Understanding the project risk -- Risk identification -- Risk analysis -- Sensitivity analysis -- Scenario analysis -- Probability analysis -- Probability sensitivity analysis -- Probability impact -- Priority -- Risk evaluation -- Economic parameters -- Iso-risk curves -- 5.7 Applying value and risk management -- Identification of options -- Analysis of options -- Evaluation of the options: the VFM assessment -- 5.8 Iteration of the process -- 5.9 Summary -- References -- Chapter 6 Quantitative Methods for Risk Analysis -- 6.1 Sanction -- 6.2 Project appraisal and selection -- Programme -- Risk and uncertainty -- 6.3 Project evaluation -- Cost-benefit analysis -- 6.4 Engineering risks -- 6.5 Risk management -- Risk reduction -- Contingencies -- The role of people -- 6.6 Probabilistic analysis -- Monte Carlo technique -- 6.7 Response to risks -- 6.8 Successful risk management -- 6.9 Principles of contingency fund estimation -- Appendix 6.A: Alternative methods of risk analysis -- Portfolio theory -- Delphi method -- Influence diagrams -- Decision trees -- Latin HyperCube sampling -- Chapter 7 The Contribution of Information Technology to Risk Modelling and Simulation -- 7.1 Purpose of RMS -- 7.2 When to use RMS -- 7.3 Requirements of the analyst -- 7.4 Modelling and simulation -- 7.5 Modelling using RMS -- 7.6 Data management -- 7.7 Analytical mechanisms -- 7.8 Classification of RMS -- 7.9 Selection of RMS -- 7.10 Modelling a project for risk management -- Advantages -- Limitations -- 7.11 Data requirements for realistic modelling -- Inflation rate -- Interest rate -- Discount rate -- Exchange rate -- 7.12 Choice of variable distribution -- 7.13 Case study -- Modelling -- Risk variables. 327 $a7.14 Case study simulations -- Discount rate -- Inflation rate -- Finance charge -- Sensitivity analysis -- Probability analysis -- Sanction risks -- Commissioning risks -- 7.15 Analysis of the result -- Discount rate -- Inflation rate -- Finance charge -- Sensitivity analyses -- Sanction risks -- Commissioning risks -- Probability analyses -- Sanction risks -- Commissioning risks -- 7.16 Discussion of findings -- 7.17 Summary -- Chapter 8 Risk Allocation in the Contracting and Procurement Cycle -- 8.1 Typical contracting and procurement processes -- 8.2 Value planning case study -- 8.3 Known and unknown risks in contracts -- 8.4 Risk allocation strategies -- Conventional approach -- Cost-based reimbursable approach -- Management contracting approach -- Fast-track approach -- Turnkey / package deal approach -- Framework agreements -- Partnering -- Alliances -- 8.5 Risk allocation according to payment mechanism -- Lump sum or fixed price -- Admeasure -- Cost reimbursable and target cost -- 8.6 Contract award -- 8.7 Summary -- Reference -- Chapter 9 Managing Financial Risks in Major Construction and PFI / PPP Projects -- 9.1 Project financing -- 9.2 Types of finance -- 9.3 Appraisal and validity of financing projects -- 9.4 Typical financial risks -- 9.5 Promoter -- Promoter-lender: debt financing contract -- Promoter-investor: equity financing contract -- 9.6 Financial risk in concession contracts -- 9.7 Global and elemental risks in concession contracts -- Global risks and elemental risks -- 9.8 Summary -- Chapter 10 Risks in International Construction Project Joint Ventures -- 10.1 Background -- 10.2 Concept of joint venture -- 10.3 Motives for joint venture formation -- 10.4 Assessing joint venture success -- Critical success factor influencing joint ventures -- Evaluating joint venture success -- 10.5 Case study -- Country risk assessment. 327 $aContract with client -- Party risks -- JV risk assessment -- Due diligence -- 10.6 Summary -- Acknowledgement -- References -- Chapter 11 Risk Management at Corporate, Strategic Business Unit and Project Levels -- 11.1 Risk in organisations -- 11.2 Risk management -- 11.3 The risk management process -- 11.4 Benefits of risk management -- 11.5 Recognising risks -- 11.6 Why risk management is used -- 11.7 Risk management actions at different levels -- 11.8 Summary -- References -- Chapter 12 Case Studies -- 12.1 Introduction -- 12.2 Heavy lift vessel design and fabrication programme risk assessment -- Introduction -- Main objective -- Project key data -- Project duration -- Limitations -- 12.3 Risk identification -- Risk analysis -- The schedule -- Conclusion -- 12.4 High Speed 1 -- 12.5 Brief history of HS1 -- Programme and constraints -- 12.6 The risk management process -- Risk identification -- Project-wide risks -- Advanced and enabling works -- St Pancras terminus -- Tunnels -- Route sections (excluding tunnels) -- Intermediate stations -- Mechanical and electrical equipment, including signaling -- 12.7 Risk assessment, analysis and response -- The procurement strategy -- Risk modelling -- Programme risk models -- The cost model -- 12.8 Summary of the preliminary schedule risk analysis results -- The final cost model -- Chapter 13 Risk Management in a Multi-Project Environment -- 13.1 Introduction -- 13.2 Drivers for the multi-project approach to project delivery -- 13.3 A conceptual model of the multi-project environment -- 13.4 Risks that are unique to or amplified in multi-project environments -- 13.5 The change in mindset required to manage risk in multi-project environments -- 13.6 Summary -- References -- Further reading -- Chapter 14 Key Issues and Guidance in Practical Risk Management -- 14.1 Decision making. 327 $a14.2 Preparation for risk management -- 14.3 Risk management process -- Identification -- Risk analysis -- Risk outputs -- 14.4 Models -- 14.5 Uncertainty -- 14.6 Socio-technical approach to risk -- 14.7 Summary -- References -- Index. 330 $aInvestment in any new project invariably carries risk but the construction industry is subject to more risk and uncertainty than perhaps any other industry.   This guide for construction managers, project managers and quantity surveyors as well as for students shows how the risk management process improves decision-making. Managing Risk in Construction Projects offers practical guidance on identifying, assessing and managing risk and provides a sound basis for effective decision-making in conditions of uncertainty.   The book focuses on theoretical aspects of risk management but also clarifies procedures for undertaking and utilising decisions. This blend of theory and practice is the real message of the book and, with a strong authorship team of practitioners and leading academics, the book provides an authoritative guide for practitioners having to manage real projects.   It discusses a number of general concepts, including projects, project phases, and risk attitude before introducing various risk management techniques. This third edition has been extended to recognize the reality of multi-project or programme management and the risks in this context; to highlight the particular problems of risk in international joint ventures; and to provide more coverage of PFI and PPP.     With case studies and examples of good practice, the book offers the distilled knowledge of over 100 man-years of experience in working on all aspects of project risk, giving sound practical guidance on identifying, assessing and managing risk. 606 $aBuilding -- Superintendence 606 $aBuilding -- Safety measures 606 $aConstruction industry -- Management 606 $aRisk assessment 608 $aElectronic books. 615 0$aBuilding -- Superintendence. 615 0$aBuilding -- Safety measures. 615 0$aConstruction industry -- Management. 615 0$aRisk assessment. 676 $a690/.22 700 $aSmith$b Nigel J$089582 701 $aMerna$b Tony$0847140 701 $aJobling$b Paul$01259066 801 0$bMiAaPQ 801 1$bMiAaPQ 801 2$bMiAaPQ 912 $a9910795826803321 996 $aManaging Risk in Construction Projects$93673019 997 $aUNINA