LEADER 01718oam 2200433I 450 001 9910705269903321 005 20140409150841.0 035 $a(CKB)5470000002448666 035 $a(OCoLC)876166006 035 $a(OCoLC)995470000002448666 035 $a(EXLCZ)995470000002448666 100 $a20140409d2000 ua 0 101 0 $aeng 135 $aurmn||||a|||| 181 $2rdacontent 182 $2rdamedia 183 $2rdacarrier 200 10$aPreliminary design proposal for treatment of the Hazel and Goldsmith landslides /$fprepared by Tracy Drury for United States Army Corps of Engineers and the Stillaguamish Tribe of Washington 210 1$a[Seattle, Wash.?] :$c[United States Army Corps of Engineers],$d[2000?] 215 $a1 online resource (17 unnumbered pages) $cillustrations 300 $aTitle from title screen (viewed on Apr. 9, 2014). 320 $aIncludes bibliographical references. 517 3 $aTreatment of the Hazel and Goldsmith landslides 606 $aLandslides$zWashington (State) 606 $aShorelines$zWashington (State)$zStillaguamish River$xMaintenance and repair 606 $aRiparian restoration$zWashington (State)$zStillaguamish River Valley 615 0$aLandslides 615 0$aShorelines$xMaintenance and repair. 615 0$aRiparian restoration 700 $aDrury$b Tracy$01401345 712 02$aUnited States.$bArmy.$bCorps of Engineers.$bSeattle District, 712 02$aStillaguamish Tribe of Washington. 801 0$bGPO 801 1$bGPO 801 2$bGPO 906 $aBOOK 912 $a9910705269903321 996 $aPreliminary design proposal for treatment of the Hazel and Goldsmith landslides$93469997 997 $aUNINA