LEADER 02203oam 2200601Ia 450 001 9910704907503321 005 20140404094005.0 035 $a(CKB)5470000002446675 035 $a(OCoLC)428820105 035 $a(OCoLC)995470000002446675 035 $a(EXLCZ)995470000002446675 100 $a20090731d2008 ua 0 101 0 $aeng 135 $aurcn||||||||| 181 $ctxt$2rdacontent 182 $cc$2rdamedia 183 $acr$2rdacarrier 200 10$aExamining the speed-flow-delay paradox in the Washington, DC region$b[electronic resource] $epotential impacts of reduced traffic on congestion delay and potential for reductions in discretionary travel during peak periods, final report /$fRobert M. Winick, Deborah Matherly and Dane Ismart 210 1$aWashington, DC :$cU.S. Federal Highway Administration,$d2008. 215 $a1 online resource (i, 72 pages) $ccolor illustrations, color charts 300 $aTitle from PDF title page (viewed on July 31, 2009). 300 $a"December 2008." 300 $a"FHWA-HOP-09-017." 320 $aIncludes bibliographical references. 517 $aExamining the speed-flow-delay paradox in the Washington, DC region 606 $aTraffic congestion$zWashington (D.C.) 606 $aHighway capacity$zWashington (D.C.) 606 $aTraffic flow$zWashington (D.C.) 606 $aHighway capacity$2fast 606 $aTraffic congestion$2fast 607 $aWashington (D.C.)$2fast 615 0$aTraffic congestion 615 0$aHighway capacity 615 0$aTraffic flow 615 7$aHighway capacity. 615 7$aTraffic congestion. 700 $aWinick$b Robert M$01395056 701 $aMatherly$b Deborah$01395057 701 $aIsmart$b Dane$01395058 712 02$aUnited States.$bFederal Highway Administration.$bOffice of Operations. 712 02$aLouis Berger Group. 801 0$bCBT 801 1$bCBT 801 2$bCBT 801 2$bFHATR 801 2$bOCLCQ 801 2$bOCLCA 801 2$bOCLCF 801 2$bGPO 906 $aBOOK 912 $a9910704907503321 996 $aExamining the speed-flow-delay paradox in the Washington, DC region$93453027 997 $aUNINA