LEADER 01659oam 2200421 450 001 9910702555603321 005 20140910104727.0 035 $a(CKB)5470000002428622 035 $a(OCoLC)890316293 035 $a(EXLCZ)995470000002428622 100 $a20140910d2014 ua 0 101 0 $aeng 135 $aurmn||||a|||| 181 $2rdacontent 182 $2rdamedia 183 $2rdacarrier 200 10$aPost-test analysis of Upper Plenum 11% break at PSB-VVER facility using TRACE v5.0 and RELAP5/MOD3.3 code /$fprepared by Petr Heralecky 210 1$aWashington, DC :$cU.S. Nuclear Regulatory Commission,$d2014. 215 $a1 online resource (103 unnumbered pages) $ccolor illustrations 225 1 $aNUREG/IA ;$v0449 300 $aTitle from title screen (viewed on Sept. 10, 2014). 300 $a"Manuscript completed: May 2014; date published: July 2014." 320 $aIncluded bibliographical references (pages 8-1-8-2). 606 $aPressurized water reactors$zRussia$xComputer simulation 606 $aLight water reactors$xComputer simulation 606 $aNuclear reactors$zRussia$xComputer simulation 615 0$aPressurized water reactors$xComputer simulation. 615 0$aLight water reactors$xComputer simulation. 615 0$aNuclear reactors$xComputer simulation. 700 $aHeralecky$b P$g(Petr),$01391362 712 02$aU.S. Nuclear Regulatory Commission, 801 0$bGPO 801 1$bGPO 801 2$bGPO 906 $aBOOK 912 $a9910702555603321 996 $aPost-test analysis of Upper Plenum 11% break at PSB-VVER facility using TRACE v5.0 and RELAP5$93487383 997 $aUNINA