LEADER 01998nam 2200541Ia 450 001 9910699742003321 005 20101201083923.0 035 $a(CKB)5470000002405527 035 $a(OCoLC)688469037 035 $a(EXLCZ)995470000002405527 100 $a20101201d1984 ua 0 101 0 $aeng 135 $aurbn||||||||| 181 $ctxt$2rdacontent 182 $cc$2rdamedia 183 $acr$2rdacarrier 200 10$aAnalytical and experimental investigation of rubbing interaction in labryinth seals for a liquid hydrogen fuel pump$b[electronic resource] /$fby Francis X. Dolan, Francis E. Kennedy, Erland M. Schulson 210 1$a[Hanover, N.H.] :$cCreare R&D Incorporated,$d[1984] 215 $a1 online resource (1 volumes (various pagings)) $cdigital, PDF file 225 1 $aNASA CR ;$v174657 225 1 $aCreare TN ;$v371 300 $aTitle from title screen (viewed Nov. 30, 2010). 300 $a"August 1984"--Rept. doc. p. 300 $a"Prepared for NASA Lewis Research Center, contract NAS 3-23276." 320 $aIncludes bibliographical references (pages 6-1 - 6-2). 606 $aFinite element method$2nasat 606 $aFuel pumps$2nasat 606 $aLabyrinth seals$2nasat 606 $aSliding friction$2nasat 606 $aSpace Shuttle Main Engine$2nasat 606 $aThermal fatigue$2nasat 615 7$aFinite element method. 615 7$aFuel pumps. 615 7$aLabyrinth seals. 615 7$aSliding friction. 615 7$aSpace Shuttle Main Engine. 615 7$aThermal fatigue. 700 $aDolan$b Francis X$01389231 701 $aKennedy$b Francis E$01389232 701 $aSchulson$b E. M$01389233 712 02$aCreare, inc. 712 02$aLewis Research Center. 801 0$bGPO 801 1$bGPO 906 $aBOOK 912 $a9910699742003321 996 $aAnalytical and experimental investigation of rubbing interaction in labryinth seals for a liquid hydrogen fuel pump$93440510 997 $aUNINA LEADER 01572nam 2200409 a 450 001 9910696912003321 005 20230902161734.0 035 $a(CKB)5470000002383776 035 $a(OCoLC)694406115 035 $a(EXLCZ)995470000002383776 100 $a20101228d2010 ua 0 101 0 $aeng 135 $aurcn||||a|||| 181 $ctxt$2rdacontent 182 $cc$2rdamedia 183 $acr$2rdacarrier 200 10$aAmerican Recovery and Reinvestment Act site inspection of water main extension project, Manchester Water Works, Manchester, New Hampshire$b[electronic resource] 210 1$aWashington, D.C. :$cU.S. Environmental Protection Agency, Office of Inspector General,$d[2010] 215 $a1 online resource (5 pages) $ccolor illustrations 225 1 $aSite inspection report 300 $aTitle from title screen (viewed on Dec. 28, 2010). 300 $a"March 17, 2010." 300 $a10-R-0080. 410 0$aSite inspection report. 517 1 $aCatalyst for improving the environment 606 $aMunicipal water supply$zNew Hampshire$zManchester 606 $aWater-supply engineering$zNew Hampshire$zManchester 606 $aWater$xDistribution 615 0$aMunicipal water supply 615 0$aWater-supply engineering 615 0$aWater$xDistribution. 801 0$bGPO 801 1$bGPO 906 $aBOOK 912 $a9910696912003321 996 $aAmerican Recovery and Reinvestment Act site inspection of water main extension project, Manchester Water Works, Manchester, New Hampshire$93136181 997 $aUNINA