LEADER 01020nam0-2200313 --450 001 9910468355603321 005 20210504123536.0 010 $a978-88-339-1811-2 100 $a20210504d2007----kmuy0itay5050 ba 101 0 $aita 102 $aIT 105 $aa 001yy 200 1 $a<>demoniaco nell'arte$eil significato filosofico del demoniaco nell'arte$fEnrico Castelli$ga cura di Enrico Castelli Gattinara$gintroduzione di Corrado Bologna 210 $aTorino$cBollati Boringhieri$d2007 215 $aLII, 329 p.$cill.$d22 cm 225 1 $aNuova cultura$v166 610 0 $aDemonio nell'arte 610 0 $aDemoniaco nell'arte 676 $a704.9487$v19$zita 700 1$aCastelli,$bEnrico$f<1900-1977>$0102272 702 1$aBologna,$bCorrado 702 1$aCastelli Gattinara,$bEnrico 801 0$aIT$bUNINA$gREICAT$2UNIMARC 901 $aBK 912 $a9910468355603321 952 $aCOLLEZ. 1164 (166)$b2456/2020$fFSPBC 959 $aFSPBC 996 $aDemoniaco nell'arte$9203982 997 $aUNINA LEADER 04867nam 2200709Ia 450 001 9910827995303321 005 20200520144314.0 010 $a9786612009334 010 $a9781282009332 010 $a1282009338 010 $a9781444302554 010 $a1444302558 010 $a9781444302561 010 $a1444302566 035 $a(CKB)1000000000715936 035 $a(EBL)416382 035 $a(OCoLC)437096833 035 $a(SSID)ssj0000119079 035 $a(PQKBManifestationID)11131636 035 $a(PQKBTitleCode)TC0000119079 035 $a(PQKBWorkID)10056815 035 $a(PQKB)10243166 035 $a(MiAaPQ)EBC416382 035 $a(Au-PeEL)EBL416382 035 $a(CaPaEBR)ebr10279131 035 $a(CaONFJC)MIL200933 035 $a(Perlego)2754180 035 $a(EXLCZ)991000000000715936 100 $a20070907d2008 uy 0 101 0 $aeng 135 $aur|n|---||||| 181 $ctxt 182 $cc 183 $acr 200 10$aCDM regulations 2007 $eprocedures manual /$fStuart D. Summerhayes 205 $a3rd ed., Rev. 210 $aOxford, UK ;$aMalden, MA $cBlackwell Pub.$d2008 215 $a1 online resource (203 p.) 300 $aDescription based upon print version of record. 311 08$a9781405140027 311 08$a140514002X 320 $aIncludes bibliographical references (p. [191]) and index. 327 $aContents; HOW THIS MANUAL WORKS; Section 1: INTRODUCTION; Section 2: APPLICATION AND INTERPRETATION; 2.1 Application; Table 2.1 THE MAIN RESPONSIBILITIES OF DUTY HOLDERS; 2.2 Interpretation; 2.3 Additional exclusions; Section 3: ALL DUTY HOLDERS; 3.1 Introduction; Table 3.1 PROJECT MANAGEMENT DESCRIPTORS FOUND IN THE REGULATIONS; Figure 3.1 HOLISTIC DIAGRAM; Section 4: THE CLIENT; 4.1 CLIENT FLOWCHART: ALL PROJECTS; 4.2 CLIENT FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; 4.3: CLIENT CHECKLIST; 4.4: CLIENT CHECKLIST: NOTIFIABLE PROJECTS; Section 5: THE DESIGNER; 5.1 Introduction 327 $aFigure 5.1 REGULATIONS TO BE DISCHARGED BY DESIGNERS5.2 All projects; 5.3 Identification; 5.4 Evaluation; 5.5 Contribution; 5.6 Design change; Figure 5.2 SYSTEMS APPROACH FOR THE DESIGNER; 5.1 DESIGNER FLOWCHART: ALL PROJECTS; 5.2 DESIGNER FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; 5.3 DESIGNER CHECKLIST: ALL PROJECTS; 5.4 DESIGNER CHECKLIST: ADDITIONAL DUTIES FOR NOTIFIABLE PROJECTS; Section 6: THE CONTRACTOR; Figure 6.1 CONTRACTOR DUTIES: ALL PROJECTS; 6.1 CONTRACTOR FLOWCHART: ALL PROJECTS; Figure 6.2 CONTRACTOR: ADDITIONAL DUTIES ON NOTIFIABLE PROJECTS 327 $a6.2 CONTRACTOR FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES6.3 CONTRACTOR CHECKLIST: ALL PROJECTS; 6.4 CONTRACTOR CHECKLIST: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; Section 7: THE CDM CO-ORDINATOR; 7.1 Introduction; 7.2 Appointment; Figure 7.1 CDM CO-ORDINATION DUTIES; 7.1 CDM CO-ORDINATOR FLOWCHART; 7.2 CDM CO-ORDINATOR CHECKLIST; Section 8: THE PRINCIPAL CONTRACTOR; Figure 8.1 REGULATIONS TO BE DISCHARGED BY PRINCIPAL CONTRACTOR; 8.1 PRINCIPAL CONTRACTOR FLOWCHART; 8.2 PRINCIPAL CONTRACTOR CHECKLIST; Section 9: DOCUMENTATION; 9.1 Introduction; 9.2 Pre-construction information 327 $aFigure 9.1 FLOW OF PRE-CONSTRUCTION INFORMATION9.3 Construction phase plan; 9.4 Health and safety file; 9.5 Project risk register; 9.1 PROJECT RISK REGISTER (HEALTH AND SAFETY); Section 10: CHECKLISTS AND AGENDAS; 10.1 CHECKLIST FOR NON-NOTIFIABLE PROJECTS; 10.2 CHECKLIST OF ADDITIONAL DUTIES FOR NOTIFIABLE PROJECTS; 10.3 INITIAL DESIGN/CLIENT MEETING: PROMPT LIST; 10.4 PRE-START MEETING: PROMPT LIST (NON NOTIFIABLE PROJECTS); 10.5 PRE-START MEETINGS: PROMPT LIST (NOTIFIABLE PROJECTS) AND ADDITIONAL POINTS; 10.6 PROGRESS MEETING: PROMPT LIST; Section 11: COMPETENCE; WEB PAGE DIRECTORY 327 $aBibliographyINDEX 330 $aThis Procedures Manual provides a documentation system which has been developed by a practising CDM co-ordinator for use with the Construction (Design and Management) Regulations 2007.It addresses the full range of obligations on all parties for compliance with the statutory requirements and features:* flow charts* checklists* model formsThe revised Third Edition of the Manual reflects the extensive changes to the CDM Regulations 2007, including:* the new role of CDM co-ordinator* wider and more onerous duties on clients* changes 606 $aConstruction industry$xSafety regulations$zGreat Britain 606 $aIndustrial safety$zGreat Britain 615 0$aConstruction industry$xSafety regulations 615 0$aIndustrial safety 676 $a343.41/078624 676 $a363.119624 700 $aSummerhayes$b Stuart$0879121 801 0$bMiAaPQ 801 1$bMiAaPQ 801 2$bMiAaPQ 906 $aBOOK 912 $a9910827995303321 996 $aCDM regulations 2007$92154189 997 $aUNINA