LEADER 00905cam0-2200325---450- 001 990004512950403321 005 20140205112010.0 035 $a000451295 035 $aFED01000451295 035 $a(Aleph)000451295FED01 035 $a000451295 100 $a19990604f19001960km-y0itay50------ba 101 2 $aita$anor 102 $aIT 105 $a-f------001gy 200 1 $a<>canto del sogno$fAnonino norvegese$g[a cura di Gianni Selvani] 210 $aFirenze$cFussi$d[1951?] 215 $a92 p., [2] c. di tav.$d18 cm 225 1 $a<>melagrano$v101 300 $aTesto originale a fronte 454 0$12001$aDraumkvaede$958846 676 $a839.821 702 1$aSelvani,$bGianni 801 0$aIT$bUNINA$gRICA$2UNIMARC 901 $aBK 912 $a990004512950403321 952 $a839.821 SEL 1$bBibl.25699$fFLFBC 959 $aFLFBC 996 $aDraumkvaede$958846 997 $aUNINA LEADER 04667nam 2200625Ia 450 001 9910461265003321 005 20200520144314.0 010 $a1-61761-623-0 035 $a(CKB)2670000000091409 035 $a(EBL)3017821 035 $a(SSID)ssj0000472412 035 $a(PQKBManifestationID)12165348 035 $a(PQKBTitleCode)TC0000472412 035 $a(PQKBWorkID)10433612 035 $a(PQKB)10643487 035 $a(MiAaPQ)EBC3017821 035 $a(Au-PeEL)EBL3017821 035 $a(CaPaEBR)ebr10654792 035 $a(OCoLC)923653703 035 $a(EXLCZ)992670000000091409 100 $a20100722d2011 uy 0 101 0 $aeng 135 $aur|n|---||||| 181 $ctxt 182 $cc 183 $acr 200 00$aProject management$b[electronic resource] /$fRobert J. Collins, editor 210 $aHauppauge, NY $cNova Science Publishers, Inc.$d2011 215 $a1 online resource (222 p.) 225 0 $aConstruction materials and engineering 300 $aDescription based upon print version of record. 311 $a1-61761-460-2 320 $aIncludes bibliographical references and index. 327 $a""PROJECT MANAGEMENT""; ""PROJECT MANAGEMENT ""; ""CONTENTS ""; ""PREFACE""; ""SUSTAINABLE PROJECT MANAGEMENT ASSESSMENT IN BUILDING AND INFRASTRUCTURE PROJECTS ""; ""1. INTRODUCTION ""; ""1.1. Background of Sustainability and the Construction Industry ""; ""1.2. Research Question ""; ""1.3. Research Objectives ""; ""1.4. Chapter Structure ""; ""2. LITERATURE REVIEW ""; ""2.1. Corporate Sustainability and Stakeholder Theory ""; ""2.2. The Link between Strategy and Sustainability Management ""; ""2.3. Sustainability in Construction Projects "" 327 $a""2.4. Certification Systems for Sustainability """"2.5. Advantages of Measuring and Reporting Sustainability Performance ""; ""2.6. Concluding Remarks""; ""3. DEVELOPMENT OF SUSTAINABLE PROJECT MANAGEMENT ASSESSMENT MODEL ""; ""3.1. Sustainability Transformation of the Iron Triangle to the Global Context""; ""3.2. Generic Reference Model and New Evaluation Model ""; ""3.3. Sustainable Project Management Assessment Model ""; ""4. RESEARCH METHOD ""; ""4.1. Methodological Approach ""; ""4.2. Research Strategy ""; ""4.3. Data Collection ""; ""4.4. Data Analysis "" 327 $a""4.5. Reliability, Validity and Generalisability """"5. FINDINGS ""; ""5.1. Stakeholder Relations and Impacts ""; ""5.2. Program Strategy and Operations ""; ""5.3. Education, Research and Development ""; ""5.4. Assessment, Measuring and Reporting""; ""6. DISCUSSION""; ""6.1. Managing Stakeholder Relations and Impacts""; ""6.2. Managing Program Strategy and Operations ""; ""6.3. Managing Education, Research and Development ""; ""6.4. Assessment, Measuring and Reporting ""; ""7. EMERGENT ISSUES ""; ""7.1. Corporate Sustainability Company Strategies ""; ""7.2. Sustainable Cost Strategy "" 327 $a""7.3. Sustainable Market Development """"8. CONCLUSIONS AND AREAS FOR FUTURE RESEARCH ""; ""APPENDIX A: INTERVIEW QUESTIONS ""; ""Interview Questionnaire ""; ""Part One: ""; ""Stakeholders and community ""; ""Part Two: ""; ""Definitions of sustainable practices ""; ""Part Three: ""; ""Sustainability as part of the core management ""; ""Part Four: ""; ""Sustainability in Projects ""; ""Part Five: ""; ""Project life cycle""; ""APPENDIX B: SUMMARY OF KEY FINDINGS ""; ""APPENDIX C: DETAILED INTERVIEW RESPONSES ""; ""REFERENCES "" 327 $a""ASSESSING MODULARITY IN THE CONSTRUCTION PROJECT OF A NUCLEAR POWER PLANT """"ABSTRACT""; ""1. INTRODUCTION ""; ""2. REAL OPTIONS ""; ""3. THE MODEL ""; ""4. APPLICATION OF THE MODEL TO A NUCLEAR POWER PLANT ""; ""5. COMPARISON BETWEEN LARGE REACTOR AND SMALL MEDIUM REACTORS ""; ""6. ASSESSMENT OF THE SEQUENTIAL OPTIONS VALUE ""; ""7. CONCLUSION ""; ""8. LIST OF MAIN ABBREVIATION AND ACRONYMS ""; ""REFERENCES ""; ""THE PROJECT MANAGEMENT CONSULTANT a??? DEVELOPING THE CONSULTING PLAN ""; ""ABSTRACT ""; ""INTRODUCTION""; ""CONSULTING COMPETENCIES "" 327 $a""Overview and Evaluation of Personal Consulting Competencies "" 410 0$aConstruction Materials and Engineering 606 $aBuilding$xSuperintendence 606 $aConstruction industry$xManagement 608 $aElectronic books. 615 0$aBuilding$xSuperintendence. 615 0$aConstruction industry$xManagement. 676 $a690.068/4 676 $a690.068/4 701 $aCollins$b Robert J.$f1950-$0887511 801 0$bMiAaPQ 801 1$bMiAaPQ 801 2$bMiAaPQ 906 $aBOOK 912 $a9910461265003321 996 $aProject management$91982632 997 $aUNINA LEADER 01693oam 2200469 450 001 9910713689603321 005 20200612100404.0 035 $a(CKB)5470000002502774 035 $a(OCoLC)966434784 035 $a(OCoLC)995470000002502774 035 $a(EXLCZ)995470000002502774 100 $a20161219d1990 ua 0 101 0 $aeng 135 $aurbn||||||||| 181 $ctxt$2rdacontent 182 $cc$2rdamedia 183 $acr$2rdacarrier 200 10$aStreamflow losses and ground-water level changes along the Big Lost River at the Idaho National Engineering Laboratory, Idaho /$fby C.M. Bennett 210 1$aIdaho Falls, Idaho :$cU.S. Geological Survey,$d1990. 215 $a1 online resource (v, 49 pages) $cillustrations, maps 225 1 $aWater-resources investigations report ;$v90-4067 300 $a"April 1990." 300 $a"Prepared in cooperation with the U.S. Department of Energy." 320 $aIncludes bibliographical references (page 37). 606 $aStream measurements$zIdaho$zBig Lost River 606 $aStream measurements$2fast 607 $aBig Lost River (Idaho) 607 $aIdaho$zBig Lost River$2fast 615 0$aStream measurements 615 7$aStream measurements. 700 $aBennett$b C. M.$01387790 712 02$aGeological Survey (U.S.), 712 02$aUnited States.$bDepartment of Energy. 801 0$bCOP 801 1$bCOP 801 2$bOCLCO 801 2$bOCLCF 801 2$bGPO 906 $aBOOK 912 $a9910713689603321 996 $aStreamflow losses and ground-water level changes along the Big Lost River at the Idaho National Engineering Laboratory, Idaho$93437951 997 $aUNINA