LEADER 03459nam 2200637Ia 450 001 9910458474403321 005 20200520144314.0 010 $a0-7844-7314-5 035 $a(CKB)2560000000053300 035 $a(EBL)3115285 035 $a(SSID)ssj0000488055 035 $a(PQKBManifestationID)12166644 035 $a(PQKBTitleCode)TC0000488055 035 $a(PQKBWorkID)10446434 035 $a(PQKB)10139286 035 $a(MiAaPQ)EBC3115285 035 $a(Au-PeEL)EBL3115285 035 $a(CaPaEBR)ebr10435206 035 $a(OCoLC)922965683 035 $a(EXLCZ)992560000000053300 100 $a20090929d2010 uy 0 101 0 $aeng 135 $aur|n|---||||| 181 $ctxt 182 $cc 183 $acr 200 00$aTrenchless renewal of culverts and storm sewers$b[electronic resource] /$fprepared by the Pipeline Infrastructure Committee of the Pipeline Division of the American Society of Civil Engineers ; edited by Lynn Osborn 210 $aReston, VA $cAmerican Society of Civil Engineers$dc2010 215 $a1 online resource (114 p.) 225 1 $aASCE manuals and reports on engineering practice ;$vno. 120 300 $aDescription based upon print version of record. 311 $a0-7844-1068-2 320 $aIncludes bibliographical references (p. 93-98) and index. 327 $a""CONTENTS""; ""1 INTRODUCTION""; ""1.1 Scope of the Manual""; ""1.2 Related Documents""; ""1.3 Glossary and Definitions""; ""A""; ""B""; ""C""; ""D""; ""E""; ""F""; ""G""; ""H""; ""J""; ""N""; ""O""; ""P""; ""R""; ""S""; ""T""; ""U""; ""V""; ""1.4 Acronyms""; ""2 SAFETY CONSIDERATIONS""; ""2.1 Introduction""; ""2.2 Potential Hazards""; ""2.3 Project Safety Assessment""; ""3 CLEANING AND INSPECTION""; ""3.1 Cleaning""; ""3.2 Inspection""; ""4 EVALUATION AND CONDITION ASSESSMENT""; ""4.1 Introduction""; ""4.2 Performance Measures""; ""4.3 Barrel Performance""; ""4.4 Additional References"" 327 $a""4.5 Life-Cycle Cost Considerations""""5 RENEWAL METHODS""; ""5.1 Introduction""; ""5.2 Cured-In-Place-Pipe""; ""5.3 Applied Shotcrete""; ""5.4 Spincast Shotcrete""; ""5.5 Sliplining with Thermoplastic Pipe""; ""5.6 Folded Thermoplastic Pipeliners""; ""5.7 HDPE Grout-In-Place Pipeliners""; ""5.8 Spiral-Wound Linings""; ""5.9 Sliplining with Fiberglass-Reinforced Resin Pipes""; ""5.10 Coatings and Linings""; ""5.11 Hydraulic Considerations""; ""6 SUMMARY""; ""REFERENCES""; ""INDEX""; ""A""; ""B""; ""C""; ""D""; ""E""; ""F""; ""G""; ""H""; ""I""; ""J""; ""L""; ""M""; ""N""; ""O""; ""P""; ""R"" 327 $a""S""""T""; ""U""; ""V""; ""W"" 410 0$aASCE manuals and reports on engineering practice ;$vno. 120. 606 $aStorm sewers$xMaintenance and repair 606 $aCulverts$xMaintenance and repair 606 $aPipelines$xMaintenance and repair 606 $aTrenchless construction 608 $aElectronic books. 615 0$aStorm sewers$xMaintenance and repair. 615 0$aCulverts$xMaintenance and repair. 615 0$aPipelines$xMaintenance and repair. 615 0$aTrenchless construction. 676 $a628.2120288 701 $aOsborn$b Lynn E$0962086 712 02$aAmerican Society of Civil Engineers.$bPipeline Infrastructure Committee. 801 0$bMiAaPQ 801 1$bMiAaPQ 801 2$bMiAaPQ 906 $aBOOK 912 $a9910458474403321 996 $aTrenchless renewal of culverts and storm sewers$92181326 997 $aUNINA