LEADER 03112nam 2200589Ia 450 001 9910298165203321 005 20200520144314.0 010 $a3-319-00843-9 024 7 $a10.1007/978-3-319-00843-1 035 $a(CKB)2550000001117841 035 $a(EBL)1398604 035 $a(OCoLC)858763929 035 $a(SSID)ssj0000962557 035 $a(PQKBManifestationID)11595011 035 $a(PQKBTitleCode)TC0000962557 035 $a(PQKBWorkID)10988853 035 $a(PQKB)11438333 035 $a(MiAaPQ)EBC1398604 035 $a(DE-He213)978-3-319-00843-1 035 $a(PPN)172423007 035 $a(EXLCZ)992550000001117841 100 $a20130711d2013 uy 0 101 0 $aeng 135 $aur|n|---||||| 181 $ctxt 182 $cc 183 $acr 200 10$aCapacity and inventory planning for make-to-order production systems $ethe impact of a customer required lead time distribution /$fKlaus Altendorfer 205 $a1st ed. 2014. 210 $aNew York $cSpringer$d2013 215 $a1 online resource (150 p.) 225 1 $aLecture Notes in Economics and Mathematical Systems,$x0075-8442 ;$v671 300 $aDescription based upon print version of record. 311 $a3-319-00842-0 311 $a1-299-85836-8 320 $aIncludes bibliographic references. 327 $aIntroduction -- Literature Review -- Single-Stage Service Level and Tardiness Model -- Simultaneous Capacity and Planned Lead Time Optimization -- Optimal Composition of Number and Size of Machines -- Service Level Constraint Models -- Conclusion. 330 $aThe book presents different models for the simultaneous optimization problem of capacity investment and work release rule parameterization. The overall costs are minimized either including backorder costs or considering a service level constraint. The available literature is extended with the integration of a distributed customer required lead time in addition to the actual demand distribution. Furthermore, an endogenous production lead time is introduced. Different models for make-to-order production systems with one or multiple serial processing stages are developed. Capacity investment is linked to the processing rates of the machines or to the number of the machines. Results are equations for service level, tardiness, and FGI lead time in such a production system. For special cases with M/M/1 and M/M/s queues explicit solutions of the optimization problems or optimality conditions concerning capacity investment and work release rule parameterization are provided. 410 0$aLecture Notes in Economics and Mathematical Systems,$x0075-8442 ;$v671 606 $aManufactures 606 $aManufacturing industries 615 0$aManufactures. 615 0$aManufacturing industries. 676 $a658.50015118 700 $aAltendorfer$b Klaus$01059220 801 0$bMiAaPQ 801 1$bMiAaPQ 801 2$bMiAaPQ 906 $aBOOK 912 $a9910298165203321 996 $aCapacity and Inventory Planning for Make-to-Order Production Systems$92504679 997 $aUNINA