LEADER 04630nam 2200589 450 001 9910146576203321 005 20170816115831.0 010 $a1-282-78433-1 010 $a9786612784330 010 $a3-527-62157-1 010 $a3-527-62156-3 035 $a(CKB)1000000000497937 035 $a(EBL)482057 035 $a(OCoLC)609855512 035 $a(SSID)ssj0000354677 035 $a(PQKBManifestationID)11275380 035 $a(PQKBTitleCode)TC0000354677 035 $a(PQKBWorkID)10315925 035 $a(PQKB)10686757 035 $a(MiAaPQ)EBC482057 035 $a(EXLCZ)991000000000497937 100 $a20160819h20082008 uy 0 101 0 $aeng 135 $aur|n|---||||| 181 $ctxt 182 $cc 183 $acr 200 10$aProcess plant design $eproject management from inquiry to acceptance /$fFrank P. Helmus ; translated by Christine Ahner 210 1$aWeinheim, [Germany] :$cWiley-VCH Verlag GmbH & Co. KGaA,$d2008. 210 4$dİ2008 215 $a1 online resource (206 p.) 300 $aIncludes index. 311 $a3-527-31313-3 327 $aProcess Plant Design; Contents; Preface; Acknowledgements; 1 Introduction; 1.1 General remarks on process plant design; 1.2 Project; 1.3 Demands on project engineers; 1.4 Overview of activities; 2 Project Planning; 2.1 Operator; 2.1.1 Product development; 2.1.2 Plant type; 2.1.2.1 Location/kind of premises; 2.1.2.2 Capacity/availability/lifespan; 2.1.2.3 Degree of automation; 2.1.2.4 Legal requirements; 2.1.3 Costs; 2.1.3.1 Investment; 2.1.3.2 Operating costs; 2.1.4 Inquiry/invitation to tender; 2.1.5 Project controlling; 2.2 Plant manufacturer; 2.2.1 Risk analysis; 2.2.2 Basic engineering 327 $a2.2.2.1 Process development2.2.2.2 Balancing; 2.2.2.3 Basic and process flow diagram; 2.2.2.4 Materials concept; 2.2.2.5 Main apparatus; 2.2.2.6 Layout; 2.2.3 Quotation; 2.2.3.1 Quotation price; 2.2.3.2 Optimization; 2.2.3.3 Contract negotiations; 3 Contract; 3.1 General; 3.1.1 Definitions; 3.1.2 Order basis; 3.1.3 Regulations; 3.1.4 Labour employment; 3.1.5 Subcontractors; 3.1.6 Project documentation; 3.2 Technical part; 3.2.1 Contractor's scope of supply and services; 3.2.2 Employer's scope of supply and services; 3.3 Commercial part; 3.3.1 Deadlines/penalties; 3.3.2 Warranties/penalties 327 $a3.3.3 Defects/acceptance3.3.4 Prices/terms of payment/bonds; 3.3.5 Alterations/claims; 3.3.6 Termination/suspension; 3.3.7 Insurance; 3.3.8 Secrecy; 3.3.9 Severability clause; 3.3.10 Coming into effect; 3.3.11 Signature policy; 4 Project execution; 4.1 Project organization; 4.1.1 Project structures; 4.1.2 Systematics; 4.1.2.1 Project manual; 4.1.2.2 Correspondence system; 4.1.2.3 Revision service; 4.1.3 Cost monitoring; 4.1.4 Time scheduling/monitoring of dates; 4.1.5 Computers in plant manufacturing; 4.2 Approval planning; 4.3 Component procurement; 4.3.1 Vessels; 4.3.2 Pumps 327 $a4.4 Piping and instrumentation diagrams4.5 E/MC-technology; 4.5.1 Electrical engineering; 4.5.2 Measurement engineering; 4.5.3 Control engineering; 4.6 Layout and building design; 4.6.1 Layout design; 4.6.2 Building design; 4.7 Piping planning; 4.8 Documentation; 4.9 Erection; 4.9.1 Excavation and civil works; 4.9.2 Component assembly; 4.9.3 Pipe assembly; 4.9.4 Assembly E/MC technology; 4.9.5 Insulations; 4.9.6 Plant marking; 4.10 Commissioning; 4.10.1 Training; 4.10.2 Cleaning; 4.10.3 Pressure tests; 4.10.4 Functional tests; 4.10.5 System tests; 4.10.6 Cold commissioning 327 $a4.10.7 Warm commissioning4.11 Warranty run/acceptance; Index 330 $aThis book describes the fascinating wealth of activities as they occur in the design, construction and commissioning of a chemical plant - a jigsaw puzzle of the work of chemical engineers, chemists, constructors, architects, electrical engineers, process automation engineers, economists and legal staff.The author first takes the reader through the conceptual phase, in which the economic relevance and environmental impact need to be considered and supplemented by accurate estimates of capital requirements and profitability. This phase ends with the choice of an appropriate engineering firm 606 $aChemical plants$xDesign and construction 608 $aElectronic books. 615 0$aChemical plants$xDesign and construction. 676 $a660.2812 700 $aHelmus$b Frank P.$0866169 702 $aAhner$b Christine 801 0$bMiAaPQ 801 1$bMiAaPQ 801 2$bMiAaPQ 906 $aBOOK 912 $a9910146576203321 996 $aProcess plant design$91933209 997 $aUNINA