LEADER 03858nam 2200601Ia 450 001 9910145418903321 005 20170815112241.0 010 $a1-281-31979-1 010 $a9786611319793 010 $a0-470-86708-6 010 $a0-470-86707-8 035 $a(CKB)1000000000405931 035 $a(EBL)351412 035 $a(OCoLC)232611443 035 $a(SSID)ssj0000238780 035 $a(PQKBManifestationID)11208340 035 $a(PQKBTitleCode)TC0000238780 035 $a(PQKBWorkID)10233924 035 $a(PQKB)10366827 035 $a(MiAaPQ)EBC351412 035 $a(EXLCZ)991000000000405931 100 $a20070720d2008 uy 0 101 0 $aeng 135 $aur|n|---||||| 181 $ctxt 182 $cc 183 $acr 200 00$aRiver restoration$b[electronic resource] $emanaging the uncertainty in restoring physical habitat /$feditors, Stephen Darby and David Sear 210 $aChichester, England ;$aHoboken, NJ $cWiley$dc2008 215 $a1 online resource (329 p.) 300 $aDescription based upon print version of record. 311 $a0-470-86706-X 320 $aIncludes bibliographical references and index. 327 $aRiver Restoration Managing the Uncertainty in Restoring Physical Habitat; Contents; Preface; List of Contributors; SECTION I: Introduction: The Nature and Significance of Uncertainty in River Restoration; 1: Uncertainty in River Restoration; 2: Sources of Uncertainty in River Restoration Research; 3: The Scope of Uncertainties in River Restoration; SECTION II: Planning and Designing Restoration Projects; 4: Planning River Restoration Projects: Social and Cultural Dimensions; 5: Conceptual and Mathematical Modelling in River Restoration: Do We Have Unreasonable Confidence? 327 $a6: Uncertainty in Riparian and Floodplain Restoration7: Hydrological and Hydraulic Aspects of River Restoration Uncertainty for Ecological Purposes; 8: Uncertainty Surrounding the Ecological Targets and Response of River and Stream Restoration; SECTION III: The Construction and Post-Construction Phases; 9: Constructing Restoration Schemes: Uncertainty, Challenges and Opportunities; 10: Measures of Success: Uncertainty and Defining the Outcomes of River Restoration Schemes 327 $a11: Methods for Evaluating the Geomorphological Performance of Naturalized Rivers: Examples from the Chicago Metropolitan Area12: Uncertainty and the Management of Restoration Projects: The Construction and Early Post-Construction Phases; SECTION IV: Uncertainty and Sustainability: Restoration in the Long Term; 13: The Sustainability of Restored Rivers: Catchment-Scale Perspectives on Long Term Response; 14: Uncertainty and the Sustainable Management of Restored Rivers; Index 330 $aRiver restoration projects are designed to recreate functional characteristics within a context of physical stability. They tend to focus on the development and application of geomorphic principles for river restoration design. Due to different models obtaining different results on the same problem, incomplete or absent data, and climatic/social/cultural changes, the designers and managers of such projects frequently face high levels of uncertainty.This book will provide a systematic overview of the issues involved in minimizing and coping with uncertainty in river restoration projects. A 606 $aStream restoration 606 $aRiparian restoration 608 $aElectronic books. 615 0$aStream restoration. 615 0$aRiparian restoration. 676 $a627.12 676 $a627/.12 701 $aDarby$b Stephen E$0989463 701 $aSear$b David$g(David A.)$0989464 801 0$bMiAaPQ 801 1$bMiAaPQ 801 2$bMiAaPQ 906 $aBOOK 912 $a9910145418903321 996 $aRiver restoration$92262970 997 $aUNINA