LEADER 01476nam 2200373 450 001 9910135895403321 005 20231207081140.0 010 $a0-7381-7114-X 035 $a(CKB)3780000000090048 035 $a(NjHacI)993780000000090048 035 $a(EXLCZ)993780000000090048 100 $a20231207d2012 uy 0 101 0 $aeng 135 $aur||||||||||| 181 $ctxt$2rdacontent 182 $cc$2rdamedia 183 $acr$2rdacarrier 200 10$aIEEE Std 1246-2011 (Revision of IEEE Std 1246-2002) - Redline /$fIEEE 210 1$a[Place of publication not identified] :$cIEEE,$d2012. 215 $a1 online resource 330 $aThe design, performance, use, testing, and installation of temporary protective grounding systems, including the connection points, as used in permanent and mobile substations, are covered in this guide. 517 $aIEEE Std 1246-2011 (Revision of IEEE Std 1246-2002) - Redline: IEEE Guide for Temporary Protective Grounding Systems Used in Substations - Redline 517 $aIEEE Std 1246-2011 606 $aElectric currents$xGrounding 606 $aElectric substations$xSafety measures 615 0$aElectric currents$xGrounding. 615 0$aElectric substations$xSafety measures. 676 $a621.317 801 0$bNjHacI 801 1$bNjHacl 906 $aDOCUMENT 912 $a9910135895403321 996 $aIEEE Std 1246-2011 (Revision of IEEE Std 1246-2002) - Redline$92575185 997 $aUNINA