04746nam 2200649Ia 450 99620865780331620230721004939.01-282-00933-897866120093341-4443-0255-81-4443-0256-6(CKB)1000000000715936(EBL)416382(OCoLC)437096833(SSID)ssj0000119079(PQKBManifestationID)11131636(PQKBTitleCode)TC0000119079(PQKBWorkID)10056815(PQKB)10243166(MiAaPQ)EBC416382(Au-PeEL)EBL416382(CaPaEBR)ebr10279131(CaONFJC)MIL200933(EXLCZ)99100000000071593620070907d2008 uy 0engur|n|---|||||txtccrCDM regulations 2007[electronic resource] procedures manual /Stuart D. Summerhayes3rd ed., Rev.Oxford, UK ;Malden, MA Blackwell Pub.20081 online resource (203 p.)Description based upon print version of record.1-4051-4002-X Includes bibliographical references (p. [191]) and index.Contents; HOW THIS MANUAL WORKS; Section 1: INTRODUCTION; Section 2: APPLICATION AND INTERPRETATION; 2.1 Application; Table 2.1 THE MAIN RESPONSIBILITIES OF DUTY HOLDERS; 2.2 Interpretation; 2.3 Additional exclusions; Section 3: ALL DUTY HOLDERS; 3.1 Introduction; Table 3.1 PROJECT MANAGEMENT DESCRIPTORS FOUND IN THE REGULATIONS; Figure 3.1 HOLISTIC DIAGRAM; Section 4: THE CLIENT; 4.1 CLIENT FLOWCHART: ALL PROJECTS; 4.2 CLIENT FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; 4.3: CLIENT CHECKLIST; 4.4: CLIENT CHECKLIST: NOTIFIABLE PROJECTS; Section 5: THE DESIGNER; 5.1 IntroductionFigure 5.1 REGULATIONS TO BE DISCHARGED BY DESIGNERS5.2 All projects; 5.3 Identification; 5.4 Evaluation; 5.5 Contribution; 5.6 Design change; Figure 5.2 SYSTEMS APPROACH FOR THE DESIGNER; 5.1 DESIGNER FLOWCHART: ALL PROJECTS; 5.2 DESIGNER FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; 5.3 DESIGNER CHECKLIST: ALL PROJECTS; 5.4 DESIGNER CHECKLIST: ADDITIONAL DUTIES FOR NOTIFIABLE PROJECTS; Section 6: THE CONTRACTOR; Figure 6.1 CONTRACTOR DUTIES: ALL PROJECTS; 6.1 CONTRACTOR FLOWCHART: ALL PROJECTS; Figure 6.2 CONTRACTOR: ADDITIONAL DUTIES ON NOTIFIABLE PROJECTS6.2 CONTRACTOR FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES6.3 CONTRACTOR CHECKLIST: ALL PROJECTS; 6.4 CONTRACTOR CHECKLIST: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; Section 7: THE CDM CO-ORDINATOR; 7.1 Introduction; 7.2 Appointment; Figure 7.1 CDM CO-ORDINATION DUTIES; 7.1 CDM CO-ORDINATOR FLOWCHART; 7.2 CDM CO-ORDINATOR CHECKLIST; Section 8: THE PRINCIPAL CONTRACTOR; Figure 8.1 REGULATIONS TO BE DISCHARGED BY PRINCIPAL CONTRACTOR; 8.1 PRINCIPAL CONTRACTOR FLOWCHART; 8.2 PRINCIPAL CONTRACTOR CHECKLIST; Section 9: DOCUMENTATION; 9.1 Introduction; 9.2 Pre-construction informationFigure 9.1 FLOW OF PRE-CONSTRUCTION INFORMATION9.3 Construction phase plan; 9.4 Health and safety file; 9.5 Project risk register; 9.1 PROJECT RISK REGISTER (HEALTH AND SAFETY); Section 10: CHECKLISTS AND AGENDAS; 10.1 CHECKLIST FOR NON-NOTIFIABLE PROJECTS; 10.2 CHECKLIST OF ADDITIONAL DUTIES FOR NOTIFIABLE PROJECTS; 10.3 INITIAL DESIGN/CLIENT MEETING: PROMPT LIST; 10.4 PRE-START MEETING: PROMPT LIST (NON NOTIFIABLE PROJECTS); 10.5 PRE-START MEETINGS: PROMPT LIST (NOTIFIABLE PROJECTS) AND ADDITIONAL POINTS; 10.6 PROGRESS MEETING: PROMPT LIST; Section 11: COMPETENCE; WEB PAGE DIRECTORYBibliographyINDEXThis Procedures Manual provides a documentation system which has been developed by a practising CDM co-ordinator for use with the Construction (Design and Management) Regulations 2007.It addresses the full range of obligations on all parties for compliance with the statutory requirements and features:* flow charts* checklists* model formsThe revised Third Edition of the Manual reflects the extensive changes to the CDM Regulations 2007, including:* the new role of CDM co-ordinator* wider and more onerous duties on clients* changes Construction industrySafety regulationsGreat BritainIndustrial safetyGreat BritainConstruction industrySafety regulationsIndustrial safety343.41/078624363.119624Summerhayes Stuart879121MiAaPQMiAaPQMiAaPQBOOK996208657803316CDM regulations 20072154189UNISA