01860oam 2200505M 450 991107987650332120200213070548.7(CKB)46366715700041(DGPO)001199510(OCoLC)1065873381(EXLCZ)994636671570004120080923d1948 ua 0engur|||||||||||txtrdacontentcrdamediacrrdacarrierIncreasing the size of the Arkansas-Mississippi Bridge Commission. June 2 (legislative day, June 1), 1948. -- Ordered to be printedWashington, DC :[publisher not identified],1948.1 online resource (1 page)Senate report / 80th Congress, 2nd session. Senate ;no. 1442[United States congressional serial set] ;[serial set no. 11207]Batch processed record: Metadata reviewed, not verified. Some fields updated by batch processes.FDLP item number not assigned.Bridge construction industryBridgesDesign and constructionToll bridgesArkansasFriars Point, MississippiHelena, ArkansasMississippi RiverMississippiLegislative materials.lcgftBridge construction industry.BridgesDesign and construction.Toll bridges.Malone George W(George Wilson),1890-1961Republican (NV)1913766WYUWYUOCLCOOCLCQBOOK9911079876503321Increasing the size of the Arkansas-Mississippi Bridge Commission. June 2 (legislative day, June 1), 1948. -- Ordered to be printed4649879UNINA