05309nam 2200625Ia 450 991078480440332120231003202331.01-281-31869-897866113186970-470-69078-X0-470-68050-4(CKB)1000000000408223(EBL)350994(OCoLC)297975207(SSID)ssj0000291083(PQKBManifestationID)11212193(PQKBTitleCode)TC0000291083(PQKBWorkID)10248379(PQKB)11744527(MiAaPQ)EBC350994(Au-PeEL)EBL350994(CaPaEBR)ebr10233256(CaONFJC)MIL131869(EXLCZ)99100000000040822320040317d2002 uy 0engurcn|||||||||txtrdacontentcrdamediacrrdacarrierCDM regulations procedures manual /Stuart D. Summerhayes2nd ed.Oxford ;Malden, Mass. Blackwell Pub.20021 online resource (176 pages)1-4051-0740-5 Includes bibliographical references [p. 163] and index.CDM Regulations Procedures Manual; Contents; Section 1 Introduction; How the manual works; Section 2 CDM Compliance - Or Not?; Section 3 The Client; 3.1 Client flowchart; 3.2 Client checklist; 1 Appointment of agent; 2 Appointment of planning supervisor; Competence; Allocation of adequate resources; 3 Service agreement; 4 F10 notification (initial); Relevant information; 6 Appointment of designers; Competence; Allocation of adequate resources; 7 Appointment of principal contractor; Competence; Allocation of adequate resources; 8 F10 notification (final)9 Construction phase health and safety plan 10 Health and safety file; Confirmation of receipt; 11 Availability of health and safety file; 12 Transfer of health and safety file; Section 4 The Planning Supervisor; 4.1 Planning supervisor flowchart; 4.2 Planning supervisor checklist; 1 Service agreement; 2 F10 notification (initial); 3 Relevant information; 4 Designer; Competence; Allocation of adequate resources; 5 Confirmation of competence and resources; 6 Design considerations; 7 Adequate information; 8 Cooperation between designers; 9 Risk assessments; 10 Pre-tender health and safety plan11 Contractor Competence; 12 Confirmation of competence; 13 Allocation of adequate resources; 14 Confirmation of adequacy of resources; 15 F10 notification (additional); Copy to principal contractor; Copy to client; 16 Construction phase health and safety plan; 17 Confirmation of suitability; 18 Health and safety agenda item; 19 Health and safety file preparation; 20 Delivery of health and safety file; 21 Confirmation of receipt of health and safety file; Section 5 The Designer; 5.1 Designer flowchart; 5.2 Designer checklist; 1 Competence/adequacy of resources questionnaire; 2 Client's duties3 Design consideration 4 Adequate information; 5 Cooperation; 6 Risk assessments; 7 Variation orders; 8 Information to planning supervisor; 9 'As-built' record drawings; 10 Post-construction liability; Section 6 The Principal Contractor; 6.1 Principal contractor flowchart; 6.2 Principal contractor checklist; 1 Competence questionnaire; 2 Pre-tender health and safety plan; 3 Tender submission; 4 Allocation of adequate resources; 5 Minutes of resource meeting; 6 F10 notification (additional); 7 Construction phase health and safety plan; 8 Commencement of Construction (sanction to start)9 Cooperation between contractors 10 Compliance with rules; 11 Trespass/security; 12 F10 notification-display; 13 Relevant information for planning supervisor; 14 Directions to contractors; 15 Site rules; 16 Information - to contractor; 17 Information - from contractor to employee; 18 Employees and self-employed - discussions and advice; 19 Arrangements for coordination of views; 20 Health and safety file; Section 7 The Contractor; 7.1 Contractor flowchart; 7.2 Contractor checklist; 1 Competence questionnaire; 2 Pre-tender health and safety plan; 3 Allocation of adequate resources; 4 Notification of relevant informationThe Construction (Design and Management) Regulations require all those involved in construction to adopt an integrated approach to health and safety management. Clients, designers and contractors, as well as planning supervisors, must now work together to ensure that health and safety management issues are considered throughout all phases of a project. Appropriate procedures must be established to ensure that documentation is clear and a structured approach is adopted by all those involved in a project to ensure that the requirements of the regulations are complied with.Construction industrySafety regulationsGreat BritainConstruction industryConstruction industrySafety regulationsConstruction industry.343.41/078624Summerhayes Stuart879121MiAaPQMiAaPQMiAaPQBOOK9910784804403321CDM regulations1963222UNINA