01519oam 2200433 450 991071521390332120210309165504.0(CKB)5470000002509889(OCoLC)1235893807(EXLCZ)99547000000250988920210202d1989 ua 0engur|||||||||||txtrdacontentcrdamediacrrdacarrierUndetected installation errors in main steam line pipe tunnel differential temperature-sensing elements at boiling water reactorsWashington, D.C. :United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation,1989.1 online resourceInformation notice ;89-10"January 27, 1989."Boiling water reactorsPipingSteam-pipesBoiling water reactorsPipingfastSteam-pipesfastBoiling water reactorsPiping.Steam-pipes.Boiling water reactorsPiping.Steam-pipes.U.S. Nuclear Regulatory Commission.Office of Nuclear Reactor Regulation.GPOGPOOCLCOOCLCFGPOBOOK9910715213903321Undetected installation errors in main steam line pipe tunnel differential temperature-sensing elements at boiling water reactors3313151UNINA