01771nam 2200409 450 991070487000332120131212135635.0(CKB)5470000002445033(OCoLC)865093870(EXLCZ)99547000000244503320131212d2013 ua 0engurmn|||||||||rdacontentrdamediardacarrierReview of revised Klamath River total maximum daily load models from Link River Dam to Keno Dam, Oregon /by Stewart A. Rounds and Annett B. Sullivan ; prepared in cooperation with the Bureau of ReclamationReston, Virginia :U.S. Department of the Interior, U.S. Geological Survey,2013.1 online resource (vi, 31 pages) color illustrations, color mapsOpen file report ;2013-1136Title from title screen (viewed Nov. 25, 2013)."Reissue of an Administrative Report prepared for the Bureau of Reclamation, 2010."Includes bibliographical references (pages 28-30).Water qualityKlamath River Watershed (Or. and Calif.)WaterPollutionTotal maximum daily loadKlamath River Watershed (Or. and Calif.)Water qualityWaterPollutionTotal maximum daily loadRounds Stewart1403245Sullivan Annett B(Annett Brigitte),1970-United States.Bureau of Reclamation,Geological Survey (U.S.),GPOGPOBOOK9910704870003321Review of revised Klamath River total maximum daily load models from Link River Dam to Keno Dam, Oregon3541133UNINA