04925nam 2200625 a 450 991046241910332120200520144314.00-7844-7250-5(CKB)2670000000240965(EBL)3115587(SSID)ssj0000721549(PQKBManifestationID)12308737(PQKBTitleCode)TC0000721549(PQKBWorkID)10688202(PQKB)11378952(MiAaPQ)EBC3115587(Au-PeEL)EBL3115587(CaPaEBR)ebr10594243(OCoLC)811238872(EXLCZ)99267000000024096520100617d2010 uy 0engur|n|---|||||txtccrProject administration for design-build contracts[electronic resource] a primer for owners, engineers, and contractors /James E. Koch, Douglas D. Gransberg, Keith R. MolenaarReston, Va. ASCE Press/American Society of Civil Engineersc20101 online resource (299 p.)Description based upon print version of record.0-7844-1075-5 Includes bibliographical references and index.""Cover""; ""Contents""; ""Foreword""; ""Preface""; ""ONE: INTRODUCTION TO DESIGN-BUILD PROJECT ADMINISTRATION""; ""Design-Build Background""; ""Summary of Recent Design-Build Research""; ""Design-Build versus Design-Bid-Build: What Is Different""; ""The Design-Build Project Team""; ""Identifying the Preeminent Factor for Using Design-Build""; ""Partnering the Design-Build Contract after Award""; ""Design-Build Success Factors""; ""References""; ""TWO: SCHEDULING DESIGN-BUILD PROJECTS""; ""Analyzing Contract Schedule Requirements""; ""Design-Build Scheduling Conference""""DB Schedule Imperatives""""References""; ""THREE: DESIGN ADMINISTRATION IN DESIGN-BUILD""; ""Changing the Design Administration Culture""; ""Design Personnel""; ""Integrating Contract Design Input""; ""Design-Build Charettes""; ""Performance Criteria Interpretation""; ""Design Submittals and Reviews""; ""Drawing Numbering System""; ""References""; ""FOUR: DESIGN QUALITY MANAGEMENT IN THE DESIGN-BUILD PROJECT""; ""Design-Build Quality Assurance Model""; ""Design Quality Defined""; ""The Economics of Quality in the Design Phase""; ""References""; ""FIVE: DESIGN ADMINISTRATION CASE STUDIES""""Case 5-1: “When Is Design Really Design?�""""Case 5-2: “Actions Speak Louder Than Words.�""; ""Case 5-3: “The Growing Design�""; ""Case 5-4: “All the Right Moves�""; ""Case 5-5: “Keep Looking until You Find the Right Answer.�""; ""SIX: CONSTRUCTION QUALITY MANAGEMENT IN THE DESIGN-BUILD PROJECT""; ""Construction Quality Defined""; ""Owner�s Role in Defining Construction Quality Requirements""; ""The Economics of Quality in the Construction Phase""; ""Construction Quality Management Planning""; ""Verification and Acceptance Testing""""Post-Award Construction Quality Plans""""Construction Quality Personnel Requirements""; ""References""; ""SEVEN: DESIGN-BUILD CHANGE ORDERS""; ""Design-Build Change Order Entitlement""; ""Design-Build Change Management""; ""Design-Build Change Order Process during Design""; ""References""; ""EIGHT: PROGRESS PAYMENTS DURING DESIGN AND CONSTRUCTION""; ""Payment for Design Progress""; ""Retainage and Final Payment""; ""Limitation on Payments""; ""Incentive Payments""; ""Design-Build Project Cost Control""; ""References""; ""NINE: CONSTRUCTION ADMINISTRATION CASE STUDIES""""Case 9-1: “Trust Me. I Know This Will Work.�""""Case 9-2: “The Winning Inspector Is . . .�""; ""Case 9-3: “If You Have Never Seen It, You Will Never Want It.�""; ""Case 9-4: “Were You Really Sure You Were Ready for This Project?�""; ""Case 9-5: “Whom Are You Trying to Satisfy?�""; ""Appendix A: Implementing Building Information Modeling in Design-Build Projects""; ""Appendix B: Implementing Sustainability in Design-Build Projects""; ""Index""; ""A""; ""B""; ""C""; ""D""; ""M""; ""O""; ""P""; ""Q""; ""R""; ""S""; ""T""; ""V""; ""About the Authors""BuildingSuperintendenceBuildingsSpecificationsConstruction contractsElectronic books.BuildingSuperintendence.BuildingsConstruction contracts.690.068Koch James Edward997549Gransberg Douglas D997550Molenaar Keith R(Keith Robert)997551MiAaPQMiAaPQMiAaPQBOOK9910462419103321Project administration for design-build contracts2287745UNINA