1.

Record Nr.

UNISA996205197703316

Autore

Chilingar George V

Titolo

The Fundamentals of Corrosion and Scaling for Petroleum & Environmental Engineers [[electronic resource]]

Pubbl/distr/stampa

Burlington, : Elsevier Science, 2013

ISBN

0-12-799991-4

1-60119-971-6

Descrizione fisica

1 online resource (253 p.)

Altri autori (Persone)

MourhatchRyan

Al-QahtaniAlzazi

Disciplina

622

622.33820284

622/.33820284

Soggetti

Corrosion and anti-corrosives

Oil fields -- Equipment and supplies -- Corrosion

Oil fields

Oil fields - Equipment and supplies - Corrosion

Mechanical Engineering

Engineering & Applied Sciences

Metallurgy & Mineralogy

Lingua di pubblicazione

Inglese

Formato

Materiale a stampa

Livello bibliografico

Monografia

Note generali

Description based upon print version of record.

Nota di contenuto

Front Cover; The Planning Guide to Piping Design; Copyright Page; Dedication; Table of Contents; Foreword; Preface; List of Figures; List of Tables; CHAPTER 1. Before You Begin; 1.1 Introduction; 1.2 Standards; 1.3 Specifications; 1.4 Procedures; 1.5 Piping Execution Plan; 1.6 Conclusion; CHAPTER 2. Procedures; 2.1 Introduction; 2.2 Master Stick Files, Working Copies, and Inter-discipline Drawing Reviews (IDR); 2.3 Vendor Drawing Reviews; 2.4 Line Numbering; 2.5 Stress Analysis; 2.6 Model Reviews; 2.7 Checking; 2.8 Manhour Estimating and Manpower Planning; CHAPTER 3. Deliverables

3.1 Introduction3.2 Deliverables; CHAPTER 4. Detailed Design; 4.1 Introduction; 4.2 Contracting and Procurement Plan and Construction Execution Plan; 4.3 Modularized and Field Erected Piping Splits and



CWP Boundaries; 4.4 Model Boundaries; 4.5 Shop and Field Material Splits; 4.6 Procurement Splits; 4.7 Issued For Bid and Bid Evaluations; 4.8 Equipment Coordinates and Elevations; 4.9 Module Design; 4.10 Module Numbering; 4.11 Drafting Practice; 4.12 Holds; 4.13 Project Binders and Lists; 4.14 Managing Standard Drawings; 4.15 Project Meetings; 4.16 Progress Monitoring

4.17 Design Change Notice (DCN)4.18 Field Change Notice (FCN); 4.19 Request For Information (RFI); CHAPTER 5. Shop Fabrication; 5.1 Introduction; 5.2 Kick-off Meetings; 5.3 Scopes of Work (SOW); 5.4 Instruction to the Fabricator; 5.5 Requests For Information (RFI); 5.6 Visits with the Fabricators; 5.7 Automatic Spool Generation; 5.8 Conclusion; CHAPTER 6. Field Construction; 6.1 Introduction; 6.2 Support From the Home Office; 6.3 Support in the Field; 6.4 Lessons Learned; 6.5 Safety; APPENDIX A: Abbreviations; Index

Sommario/riassunto

Scale, or deposits, can build up in the wellbore tubulars and other downhole components, causing considerabledamage to the life of the well. Infrastructure provides the support for the wells system and with oil andgas consumption on the rise and transportation required to feed that demand, all petroleum and pipelineengineers must have accurate corrosion and scaling information. The Fundamentals of Corrosion and Scalingfor Petroleum and Environmental Engineers will provide the quick knowledge that engineers need to not onlyenhance the reliability of corrosion and scale contr