|
|
|
|
|
|
|
|
|
1. |
Record Nr. |
UNINA9910826733803321 |
|
|
Autore |
Laplante Benoît <1960-> |
|
|
Titolo |
Economic analysis of climate-proofing investment projects / / Asian Development Bank |
|
|
|
|
|
|
|
Pubbl/distr/stampa |
|
|
Manila, Philippines : , : Asian Development Bank, , 2015 |
|
©2015 |
|
|
|
|
|
|
|
|
|
ISBN |
|
|
|
|
|
|
Descrizione fisica |
|
1 online resource (93 p.) |
|
|
|
|
|
|
Disciplina |
|
|
|
|
|
|
Soggetti |
|
Climatic changes |
Power resources |
|
|
|
|
|
|
|
|
Lingua di pubblicazione |
|
|
|
|
|
|
Formato |
Materiale a stampa |
|
|
|
|
|
Livello bibliografico |
Monografia |
|
|
|
|
|
Note generali |
|
Description based upon print version of record. |
|
|
|
|
|
|
Nota di bibliografia |
|
Includes bibliographical references. |
|
|
|
|
|
|
Nota di contenuto |
|
Cover; Contents; Tables, Figures, and Boxes; TABLES; 1 Economic Impact of Climate Change, Climate Proofing, and Residual Damage; 2 Assessment Criteria and Decision Rule; 3 Estimated Costs of Climate Proofing Investment Projects in the Transport Sector; FIGURES; 1 Flowchart for Assessing Climate Risk of Projects; 2 Steps for Climate Risk Management of Investment Projects; 3 How Will Climate Change Impact the Project?; 4 Economic Impact of Climate Change; 5 Impact of Climate Change and of Climate Proofing; 6 Decision Rule; 7 Cost-Benefit Analysis versus Least-Cost Analysis |
8 From Climate Projections to Net Present Value9 Projected Changes in Temperature and Precipitation; BOXES; 1 On the Use of Economic Analysis in World Bank Projects; 2 Climate Change Vulnerability Assessment: A Combined Cycle Power Plant in Viet Nam; 3 Examples of Climate Proofing Investment Projects; 4 Example 1: Computing the Economic Cost of Climate Change; 5 Example 2: Computing the Economic Impact of Climate Proofing; 6 Adaptation and Residual Damage; 7 Example 3: Residual Damage; 8 Cost of Climate Change, Benefits of Climate Proofing, and Residual Damages in Europe |
9 Example 4: Accounting for Ancillary Benefits of Ecosystem-Based Approaches to Climate Proofing10 Example 5: Ancillary Benefits and Project Lifetime; 11 Net Present Value versus Benefit-Cost Ratio; 12 Central Mekong Delta Connectivity Project; 13 Investing in a |
|
|
|
|
|
|
|
|
|
|
Hydropower Project: Climate Change and Monte Carlo Simulation; 14 Example 6: Optimal Timing of Implementation of a Climate-Proofing Measure; 15 Real Option; 16 Robust Adaptation to Climate Change; Abbreviations; Foreword; Executive Summary; Introduction; A Commitment to Climate Change; Asian Development Bank Response |
Scope of the ReportDefining "Climate Proofing"; Target Audience; Structure of the Report; Part A: Setting the Stage: The Role of Economic Analysis and the Impacts of Climate Change; The Role of Economic Analysis; What Economic Analysis Is; What Economic Analysis Is Not; Conducting a Climate Risk and Vulnerability Assessment of Investment Projects; Climate Proofing Investment Projects; Part B: Economic Analysis of Climate Proofing Investment Projects: Overall Concepts and Principles; Cost of Climate Change versus Benefits of Climate Proofing; Cost of Climate Change at Project Level |
Benefits of Climate ProofingResidual Damage; Ancillary Benefits and Ecosystem-Based Climate-Proofing Measures; Maladaptation; Time Horizon; Economic (Social) Discount Rate; Decision Rule; Least-Cost Analysis; Part C: Economic Analysis and Decision Making with Uncertain Climate Change; Sensitivity Analysis; Probabilistic (or Quantitative) Risk Analysis; Scenario Analysis; Real Option Analysis; Robust Adaptation to Climate Change; Economic Analysis Guiding Decision Making; Conclusions; References; Appendix 1 Time Horizons in Economic Analysis of ADB-Financed Projects |
Appendix 2 On the Discount Rate |
|
|
|
|
|
| |