|
|
|
|
|
|
|
|
1. |
Record Nr. |
UNINA9910825858403321 |
|
|
Autore |
Khalil E. E. |
|
|
Titolo |
Air distribution in buildings / / Essam E. Khalil |
|
|
|
|
|
Pubbl/distr/stampa |
|
|
Boca Raton : , : CRC Press, , [2014] |
|
©2014 |
|
|
|
|
|
|
|
|
|
ISBN |
|
1-04-005622-9 |
0-429-07361-5 |
1-4665-9463-2 |
|
|
|
|
|
|
|
|
Descrizione fisica |
|
1 online resource (264 pages) |
|
|
|
|
|
|
Collana |
|
Mechanical and aerospace engineering |
|
|
|
|
|
|
Classificazione |
|
SCI024000SCI065000TEC005050 |
|
|
|
|
|
|
Disciplina |
|
|
|
|
|
|
|
|
Soggetti |
|
Air conditioning |
Ventilation |
Ventilation - Equipment and supplies - Design and construction |
|
|
|
|
|
|
|
|
Lingua di pubblicazione |
|
|
|
|
|
|
Formato |
Materiale a stampa |
|
|
|
|
|
Livello bibliografico |
Monografia |
|
|
|
|
|
Note generali |
|
Description based upon print version of record. |
|
|
|
|
|
|
Nota di bibliografia |
|
Includes bibliographical references. |
|
|
|
|
|
|
Nota di contenuto |
|
Front Cover; Contents; Preface; Acknowledgments; About the Author; Chapter 1: Air Distribution Systems; Chapter 2: Mathematical Modeling Technique; Chapter 3: Airflow Regimes and Thermal Comfort in a Room; Chapter 4: Airflow Regimes and Thermal Pattern in Archeological Monuments; Chapter 5: Airflow in Places of Worship; Chapter 6: Airflow Patterns in Healthcare Facilities; Chapter 7: Examples of Typical Air Conditioning Projects; Chapter 8: Indoor Environmental Quality; Chapter 9: Energy Efficiency in Air-Conditioned Buildings; Appendix A: Nomenclature |
Appendix B: Climatic Conditions in LuxorAppendix C: Glossary; Back Cover |
|
|
|
|
|
|
|
|
Sommario/riassunto |
|
This book gives comprehensive guidance on the design, calculations and efficient operation of air distribution in buildings of different sizes and uses. It focuses on large buildings, starting with simple rooms and then moving to more complex configurations. A special concern is for hospitals, theatres, public buildings and sporting facilities. The book analyzes use at various stages during the whole building lifecycle. Air conditioning systems providers have the responsibility to ensure that |
|
|
|
|