|
|
|
|
|
|
|
|
1. |
Record Nr. |
UNINA9910823738003321 |
|
|
Autore |
Geitner Fred K |
|
|
Titolo |
Maximizing machinery uptime / / Fred K. Geitner and Heinz P. Bloch |
|
|
|
|
|
Pubbl/distr/stampa |
|
|
Amsterdam ; ; Boston, : Elsevier Gulf Professional Pub., c2006 |
|
|
|
|
|
|
|
ISBN |
|
1-280-62937-1 |
9786610629374 |
0-08-046580-3 |
|
|
|
|
|
|
|
|
Edizione |
[1st ed.] |
|
|
|
|
|
Descrizione fisica |
|
1 online resource (673 p.) |
|
|
|
|
|
|
Collana |
|
Practical machinery management for process plants ; ; v. 5 |
|
|
|
|
|
|
Altri autori (Persone) |
|
|
|
|
|
|
Disciplina |
|
|
|
|
|
|
Soggetti |
|
Industrial management |
Machinery in the workplace |
Organizational effectiveness |
|
|
|
|
|
|
|
|
Lingua di pubblicazione |
|
|
|
|
|
|
Formato |
Materiale a stampa |
|
|
|
|
|
Livello bibliografico |
Monografia |
|
|
|
|
|
Note generali |
|
Description based upon print version of record. |
|
|
|
|
|
|
Nota di bibliografia |
|
Includes bibliographical references and index. |
|
|
|
|
|
|
Nota di contenuto |
|
Cover; Front matter; Half Title Page; Copyright; Contents; Acknowledgments; Preface; 1. Introduction; Grooming Talent and Skills; Sound Organizational Setup Explained; PdM, TPM, TPR, and ODR/DSS Explained; Reliability-Focused Plants and Operator Involvement; Awareness of Availability Needs and Outage and Turnaround Planning; Insurance and Spare Parts Philosophies; Reliability-Focus versus Repair-Focus; Mentoring, Resources, and Networking; More Keys to a Productive Reliability Workforce; "CARE" - Deming's Method Streamlined and Adapted to Our Time; References; Bibliography |
2. The meaning of reliability System and Mission; Assembly and Part; Assembly Hierarchy; Failure; Failure Mode; Service Life; Reliability; Maintainability; Surveillability; Availability; References; 3. Uptime as probability of success; References; 4. Estimating machinery uptime; Estimation of Failure Distributions for Machinery Components; Application of Failure Distributions; Obtaining the Weibull Function; Construction of the Replacement Model; Data Sources; Analysis of Run-Time Data; Analysis of Pumps; Analysis of Motors; Analysis of Rebuild Data |
Life Comparison With Other Industrial Experience Conclusion; References; 5. Is there a universal approach to predicting machinery |
|
|
|
|