|
|
|
|
|
|
|
|
1. |
Record Nr. |
UNINA9910814636803321 |
|
|
Autore |
Matthews John |
|
|
Titolo |
Demonstration and evaluation of innovative wastewater main rehabilitation technologies / / by John Matthews |
|
|
|
|
|
|
|
Pubbl/distr/stampa |
|
|
London, England : , : IWA Publishing, , 2014 |
|
©2014 |
|
|
|
|
|
|
|
|
|
ISBN |
|
|
|
|
|
|
Edizione |
[1st ed.] |
|
|
|
|
|
Descrizione fisica |
|
1 online resource (100 p.) |
|
|
|
|
|
|
Collana |
|
|
|
|
|
|
Disciplina |
|
|
|
|
|
|
Soggetti |
|
Sewage disposal plants - Management |
|
|
|
|
|
|
Lingua di pubblicazione |
|
|
|
|
|
|
Formato |
Materiale a stampa |
|
|
|
|
|
Livello bibliografico |
Monografia |
|
|
|
|
|
Note generali |
|
Description based upon print version of record. |
|
|
|
|
|
|
Nota di bibliografia |
|
Includes bibliographical references. |
|
|
|
|
|
|
Nota di contenuto |
|
Cover -- Copyright -- Acknowledgments -- Abstract and Benefits -- Table of Contents -- List of Tables -- List of Figures -- List of Acronyms and Abbreviations -- Executive Summary -- Chapter 1.0: Introduction -- 1.1 Project Background -- 1.2 Project Objectives -- 1.3 Report Outline -- Chapter 2.0: Demonstration Approach -- 2.1 Demonstration Protocol Overview -- 2.2 Technology Selection Approach -- 2.2.1 UV-Cured CIPP -- 2.2.2 Large-Diameter WC-CIPP -- Chapter 3.0: UV-Cured CIPP Demonstration -- 3.1 Site Preparation -- 3.1.1 Safety and Logistics -- 3.1.2 Above Ground Sample -- 3.1.3 Installation of Bypass System -- 3.1.4 Pre-Lining Inspection and Cleaning -- 3.1.5 Pipe Inner Diameter -- 3.2 Technology Application -- 3.2.1 Shipping, Storage, and Handling -- 3.2.2 Liner Insertion and Inflation -- 3.2.3 Liner Curing -- 3.3 Post-Lining CCTV -- 3.3.1 Post-Lining CCTV of Lining Run #1 -- 3.3.2 Post-Lining CCTV of Lining Run #2 -- 3.3.3 Post-Lining CCTV of Lining Run #3 -- 3.4 Demonstration Results -- 3.4.1 Technology Maturity -- 3.4.2 Technology Feasibility -- 3.4.3 Technology Complexity -- 3.4.4 Technology Performance -- 3.4.5 Technology Cost -- 3.4.6 Technology Environmental Impact -- 3.5 Conclusions -- Chapter 4.0: Large-Diameter WC-CIPP Demonstration -- 4.1 Site Preparation -- 4.1.1 Safety and Logistics -- 4.1.2 Pre-Lining Inspection and Cleaning -- 4.2 Technology Application -- 4.2.1 Liner Wetout -- 4.2.2 Liner Inversion -- 4.2.3 Liner Curing and Cooling -- 4.3 Post-Lining CCTV -- 4.4 |
|
|
|
|