|
|
|
|
|
|
|
|
1. |
Record Nr. |
UNINA9910782059503321 |
|
|
Titolo |
Assessment of the continuing operability of chemical agent disposal facilities and equipment / / Committee on Continuing Operability of Chemical Agent Disposal Facilities and Equipment, Board on Army Science and Technology, Division on Engineering and Physical Sciences, National Research Council of the National Academies |
|
|
|
|
|
|
|
Pubbl/distr/stampa |
|
|
Washington, D.C., : National Academies Press, c2007 |
|
|
|
|
|
|
|
ISBN |
|
0-309-17986-6 |
1-280-84429-9 |
9786610844296 |
0-309-66663-5 |
|
|
|
|
|
|
|
|
Descrizione fisica |
|
1 online resource (xiii, 63 pages) : illustrations |
|
|
|
|
|
|
Disciplina |
|
|
|
|
|
|
Soggetti |
|
Chemical weapons disposal - Equipment and supplies |
Hazardous waste treatment facilities |
|
|
|
|
|
|
|
|
Lingua di pubblicazione |
|
|
|
|
|
|
Formato |
Materiale a stampa |
|
|
|
|
|
Livello bibliografico |
Monografia |
|
|
|
|
|
Note generali |
|
Description based upon print version of record. |
|
|
|
|
|
|
Nota di bibliografia |
|
Includes bibliographical references. |
|
|
|
|
|
|
Nota di contenuto |
|
""Front Matter""; ""Preface""; ""Acknowledgment of Reviewers""; ""Contents""; ""Tables, Figures, and Boxes""; ""Abbreviations""; ""Summary""; ""1 Introduction""; ""2 Potential Problems Relating to Obsolescence in Chemical Demilitarization Processing Operations""; ""3 Site-Related Means for Effecting Continuing Operability""; ""4 Information Management Systems""; ""5 Program wide Influences on Continuing Operability""; ""Appendixes""; ""Appendix A Committee Meetings and Site Visits""; ""Appendix B Volatility Characteristics of Information Management and Technology Systems"" |
""Appendix C Biographical Sketches of Committee Members"" |
|
|
|
|
|
|
|
|
Sommario/riassunto |
|
The US Army's Chemical Materials Agency (CMA) contracts for the operation of chemical agent stockpile incineration facilities at four disposal sites. This book presents a review of potential infrastructure and equipment weaknesses given that the facilities are being operated well beyond their original design lifetime. |
|
|
|
|
|
|
|