1.

Record Nr.

UNINA9910462419103321

Autore

Koch James Edward

Titolo

Project administration for design-build contracts [[electronic resource] ] : a primer for owners, engineers, and contractors / / James E. Koch, Douglas D. Gransberg, Keith R. Molenaar

Pubbl/distr/stampa

Reston, Va., : ASCE Press/American Society of Civil Engineers, c2010

ISBN

0-7844-7250-5

Descrizione fisica

1 online resource (299 p.)

Altri autori (Persone)

GransbergDouglas D

MolenaarKeith R (Keith Robert)

Disciplina

690.068

Soggetti

Building - Superintendence

Buildings

Construction contracts

Electronic books.

Lingua di pubblicazione

Inglese

Formato

Materiale a stampa

Livello bibliografico

Monografia

Note generali

Description based upon print version of record.

Nota di bibliografia

Includes bibliographical references and index.

Nota di contenuto

""Cover""; ""Contents""; ""Foreword""; ""Preface""; ""ONE: INTRODUCTION TO DESIGN-BUILD PROJECT ADMINISTRATION""; ""Design-Build Background""; ""Summary of Recent Design-Build Research""; ""Design-Build versus Design-Bid-Build: What Is Different""; ""The Design-Build Project Team""; ""Identifying the Preeminent Factor for Using Design-Build""; ""Partnering the Design-Build Contract after Award""; ""Design-Build Success Factors""; ""References""; ""TWO: SCHEDULING DESIGN-BUILD PROJECTS""; ""Analyzing Contract Schedule Requirements""; ""Design-Build Scheduling Conference""

""DB Schedule Imperatives""""References""; ""THREE: DESIGN ADMINISTRATION IN DESIGN-BUILD""; ""Changing the Design Administration Culture""; ""Design Personnel""; ""Integrating Contract Design Input""; ""Design-Build Charettes""; ""Performance Criteria Interpretation""; ""Design Submittals and Reviews""; ""Drawing Numbering System""; ""References""; ""FOUR: DESIGN QUALITY MANAGEMENT IN THE DESIGN-BUILD PROJECT""; ""Design-Build Quality Assurance Model""; ""Design Quality Defined""; ""The Economics of Quality in the Design Phase""; ""References""; ""FIVE: DESIGN



ADMINISTRATION CASE STUDIES""

""Case 5-1: “When Is Design Really Design?�""""Case 5-2: “Actions Speak Louder Than Words.�""; ""Case 5-3: “The Growing Design�""; ""Case 5-4: “All the Right Moves�""; ""Case 5-5: “Keep Looking until You Find the Right Answer.�""; ""SIX: CONSTRUCTION QUALITY MANAGEMENT IN THE DESIGN-BUILD PROJECT""; ""Construction Quality Defined""; ""Owner�s Role in Defining Construction Quality Requirements""; ""The Economics of Quality in the Construction Phase""; ""Construction Quality Management Planning""; ""Verification and Acceptance Testing""

""Post-Award Construction Quality Plans""""Construction Quality Personnel Requirements""; ""References""; ""SEVEN: DESIGN-BUILD CHANGE ORDERS""; ""Design-Build Change Order Entitlement""; ""Design-Build Change Management""; ""Design-Build Change Order Process during Design""; ""References""; ""EIGHT: PROGRESS PAYMENTS DURING DESIGN AND CONSTRUCTION""; ""Payment for Design Progress""; ""Retainage and Final Payment""; ""Limitation on Payments""; ""Incentive Payments""; ""Design-Build Project Cost Control""; ""References""; ""NINE: CONSTRUCTION ADMINISTRATION CASE STUDIES""

""Case 9-1: “Trust Me. I Know This Will Work.�""""Case 9-2: “The Winning Inspector Is . . .�""; ""Case 9-3: “If You Have Never Seen It, You Will Never Want It.�""; ""Case 9-4: “Were You Really Sure You Were Ready for This Project?�""; ""Case 9-5: “Whom Are You Trying to Satisfy?�""; ""Appendix A: Implementing Building Information Modeling in Design-Build Projects""; ""Appendix B: Implementing Sustainability in Design-Build Projects""; ""Index""; ""A""; ""B""; ""C""; ""D""; ""M""; ""O""; ""P""; ""Q""; ""R""; ""S""; ""T""; ""V""; ""About the Authors""